B-19. - Public Facilities. — B-19. - Public Facilities
Code of Ordinances of the City of Suffolk, Virginia (Codified through Ordinance No. 26-O-074, enacted June 17, 2026 (Supp. No. 55)) · Suffolk Unified Development Ordinance, App. B, B-19. - Public Facilities.
Corpus is an independent public-information project, not the official City of Suffolk website. Stable reference: corpuslaw.us/code/e3b11c86-7c51-4571-b1eb-6b6640179739
B-19. - PUBLIC FACILITIES.
(a) In accordance with the adopted level of service standards and Code of Virginia, §§ 15.2-2240, 15.2-2280, 15.2-2283 and 15.2-2296, the applicant shall submit the following with any application for a rezoning or subdivision, site plan or conditional use approval: (1) Water level of service: A. A study submitted to the Department of Public Utilities for review which stipulates the required average day, maximum day, and maximum hourly potable water demands for the proposed application. Submitted demands shall be developed and certified by a Professional Engineer licensed by the Commonwealth of Virginia based on demand factors consistent with the Virginia Department of Health Waterworks Regulations. B. A study prepared by a Professional Engineer licensed by the Commonwealth of Virginia stipulating the maximum fire protection requirements and location of requirements for the proposed application. In addition, the study shall stipulate the applicant's proposed method of meeting the required fire flows. C. If applicable, evidence of coordination with a private water service provided, including an agreement for service, or other binding arrangement for the provision of water services. D. Evidence of coordination with the public or private water service provider, including an agreement for service, commitment service letter or other binding arrangement for the provision of water services. (2) Sewer level of service: A. A study submitted to the Department of Public Utilities for review which stipulates the required average and peak sanitary sewer flows (gpm), and proposed sewer infrastructure improvements for the proposed application. Submitted demands shall be developed and certified by a Professional Engineer licensed by the Commonwealth of Virginia. B. If applicable, Virginia Department of Health Certification for the installation of individual septic tanks and drain fields. (3) Stormwater management drainage data including a description of existing or proposed drainage facilities or stormwater management systems on the proposed development site, including system capacity and the ultimate point of discharge; building elevations; and drainage calculations using the Rational Method including, at a minimum: A. Storm events used, including depth, duration and distribution; B. The dimensions, measurements and percentage of impervious surface coverage, including the runoff coefficient; C. The predevelopment condition for stormwater runoff; and D. The anticipated rate, volume, direction and pollutant load of surface water or groundwater flow anticipated following the completion of construction. E. A Stormwater Management Plan prepared according to Section B-12 of this Appendix B. (4) Transportation. A Traffic Impact Study consistent with Section B-21 of this Appendix B. (b) All plans and specifications required pursuant to the level of service goals and policies shall be stamped and signed by a Registered Professional Engineer. (c) Where the applicant is required to submit plans and specifications approved by another regulatory agency or service provider, such plans and specifications shall not be accepted for purposes of concurrency review unless and until the applicant has complied with the following procedures: (1) Prior to presenting the plans and specifications to the service provider or regulatory agency, the applicant shall present such plans to the Director for certification. The Director shall stamp the plans and specifications for purposes of certification for review by the applicable service providers or regulatory agencies. The certification described herein shall be for purposes of permit tracking only, and shall not constitute approval of the proposed development for purposes of the adopted level of service standard. (2) Any substantial revision to or deviation from such plans and specifications shall be presented to the Director for certification prior to its resubmittal to the service provider or regulatory agency. (3) No plans or specifications reviewed by the service provider or regulatory agency shall be accepted by the Director unless such plans have been certified by the Director and the plan or specification has been approved in its entirety by the applicable service provider or regulatory agency.
Ask a question about Suffolk law
Corpus searches the Suffolk sections it holds and shows the ones that match, with their citations. Free, no sign-in.
