B-22. - Telecommunications Towers. — B-22. - Telecommunications Towers

Code of Ordinances of the City of Suffolk, Virginia (Codified through Ordinance No. 26-O-074, enacted June 17, 2026 (Supp. No. 55)) · Suffolk Unified Development Ordinance, App. B, B-22. - Telecommunications Towers.

Corpus is an independent public-information project, not the official City of Suffolk website. Stable reference: corpuslaw.us/code/817429d3-78ad-4901-857e-959535151534

B-22. - TELECOMMUNICATIONS TOWERS.

(a) Site and landscape plans. (1) No application for approval of a Conditional Use Permit for a telecommunication tower shall be accepted or approved unless all of the following information is provided: A. A written narrative with: (i) Description of the siting process with specific emphasis on co-location opportunities examined. Private towers, Virginia Power transmission line towers and municipal towers in the vicinity shall be examined and reasons provided as to why these sites are not feasible. (ii) Description of municipal-owned properties, such as school, parks and recreation, utilities and industrial park sites, in the vicinity and opportunities and/or limitations for locating on each site (see Ordinance 21, School Board Site Leases). (iii) Description of tower design and a sample photograph showing the type of tower. (iv) Elevation drawing of the tower on the site plan, with all existing co-locators and their co-location heights shown. (v) Description of the tower's impacts. B. Documentation of the structural integrity of the tower to support co-location of two additional users and new equipment. C. A computer simulation of the tower depicting where, within a two-mile radius, it could be seen. D. Documentation of FCC license. E. Documentation of Non-Ionizing Electromagnetic Radiation (NIER) test and approval from the Federal Communications Commission. F. Approval letter from the Federal Aviation Commission. G. A site plan review application must be completed and a plan submitted in accordance with the City's site plan review procedures including an 8½ × 11″ reduction. H. Proof of lease agreement granting use of tower and ingress/egress easement to site. (2) Site plans for new construction or an increase in height of an existing tower shall include the following: A. List of conditions from associated Conditional Use Permit. B. Elevation drawings, showing tower and antennae array height. C. Total lease area and location of all equipment buildings and associated equipment. D. Proposed access drive and parking area. E. Screen landscaping plan. F. Total area of land disturbance (if 10,000 square feet or more or 2,500 square feet or more in a Chesapeake Bay Preservation Area, then erosion and sediment control plan must also be submitted, in accordance with the Erosion and Sedimentation Control Regulations of this Ordinance). (3) Site plans for co-location or existing towers shall include the following: A. List of conditions for tower conditional use permit, if available. B. Elevation drawings, showing proposed antennae array height and existing antennae arrays. C. Total lease area and location of all proposed and existing equipment buildings and associated equipment. D. Location of any new access drives or parking area. E. Screen landscape plan. F. Total area of land disturbance (if 10,000 square feet or more or 2,500 square feet or more in a Chesapeake Bay Preservation Area, then erosion and sediment control plan must also be submitted, in accordance with Section 3). G. Documentation of FCC license. H. Non-Ionizing Electromagnetic Radiation (NIER) study and FCC engineering statement. I. Structural integrity analysis of tower with new equipment loads. J. Lease agreement with property owner, with documentation of ingress/egress easement to lease site.

Ask a question about Suffolk law

Corpus searches the Suffolk sections it holds and shows the ones that match, with their citations. Free, no sign-in.