§ 31-511 — ENGINEERING PLANS
Code of Ordinances of the City of Suffolk, Virginia (Codified through Ordinance No. 26-O-074, enacted June 17, 2026 (Supp. No. 55)) · Suffolk Unified Development Ordinance § 31-511
Corpus is an independent public-information project, not the official City of Suffolk website. Stable reference: corpuslaw.us/code/79112f9f-232c-45ed-93cc-d875e1d85a49
SEC. 31-511. - ENGINEERING PLANS.
(a) SUBMITTAL. Following approval of the Preliminary Plat, if required, the applicant shall have prepared, by a professional engineer, registered in the Commonwealth of Virginia, engineering plans, consisting of complete construction drawings and specifications of all easements, streets, traffic control devices, street lights, sanitary sewers, storm water facilities, water system facilities, sidewalks, parks and recreation facilities and other improvements required by this Article. Each sheet shall be certified (sealed) by a professional engineer. Engineering plans shall be submitted to the Director for review and approval as a ministerial permit. All improvements required pursuant to these regulations shall be constructed in accordance with the design standards and plan requirements of this Ordinance and, where applicable, the requirements and authorization of the appropriate state agency, utility company or local franchisee. (b) PUBLIC AGENCY REVIEWS. The Director shall review and act on all engineering plan applications in consultation with the Director of Public Utilities and the Director of Public Works. An inspection shall be performed by the Director of Public Works, and the Director of Public Utilities or their designee and they shall certify that all improvements have been completed in accordance with this Section, prior to recordation of the Final Plat. Certificates of occupancy shall not be issued by the building official for homes in subdivisions under performance bond until it is determined by the Director of Public Works that the streets have an acceptable all-weather surface and all other physical improvements are complete except for minor items such as placement of monuments, cleaning of curbs, gutters, catch basins, and/or the replacement of such defective items as curbs and gutters and roadway failures of small areas. (c) TIMING OF IMPROVEMENTS. Except upon the written approval of the Director, no grading, removal of trees or other vegetation, land filling, construction of improvements, or other material change as may be exempt from the erosion and sediment control standards and the Erosion and Sedimentation Control Law, Code of Virginia, § 10.1-560 et seq., except for purposes of aiding in preparation of final engineering drawings or plans, shall commence on the subject property until the applicant has received the approval of the engineering plans and all necessary permits from the Director. The Director may approve such material changes with the concurrence of the erosion and sediment control plan approving authority for the City. (d) MODIFICATION OF ENGINEERING PLANS. All installations of improvements and all construction shall conform to the approved engineering plans. Modifications in design and/or specifications during construction shall be made only with the written approval of the Director. It shall be the responsibility of the applicant to notify the Director in advance of any changes to be made from the approved drawings. In the event that actual construction work deviates from that shown on the approved engineering plans and such deviation was not approved in advance by the Director, the applicant may be required to correct the installed improvements to conform to the approved engineering plans. In addition, the Director may take such other actions as may be deemed appropriate including, but not limited to, revocation of permits already issued and/or withholding of future approvals and permits related to the subdivision. (e) AS-BUILT DRAWINGS—PUBLIC IMPROVEMENTS. (1) SUBMITTAL. Prior to acceptance of the required improvements, the applicant shall submit to the Director one reproducible copy and two prints of as-built engineering drawings for each of the required improvements that have been completed. Each set of drawings shall be recertified by the applicant's engineer indicating the date when the as-built survey was made. Each drawing shall include manholes or other control points located in accordance with the City of Suffolk Global Positioning System (GPS) Geodetic Survey Network. (2) SEWER AND STORM DRAINAGE. As-built drawings shall show the constructed vertical elevation, horizontal location and size of all sanitary and storm sewers, manholes, inlets, junction boxes, detention basins and other appurtenances or elements of the sewerage and storm drainage systems constructed to serve the subdivision. In conjunction with the submittal of engineering plans and specifications, the subdivider shall be required to demonstrate compliance with the design standards for proper erosion and sedimentation control of the overall area proposed to be developed. The subdivider shall cause all grading, excavations, open cutting and similar land surface disturbances to be mulched, seeded, sodded or otherwise protected to ensure compliance with the City's erosion and sedimentation control regulations (Chapter 34, Article II of the City Code). No work shall be initiated relative to the preparation of land or the installation of general improvements until such time as all aspects of the subdivider's engineering plans and erosion and sedimentation control proposals have received approval pursuant to a land disturbance permit (City Code, Section 34-35). (3) WATER. As-built drawings shall depict water lines, valves, fire hydrants and other appurtenances or elements of the water distribution system constructed to serve the project shall be limited to horizontal location and size of water lines and location and description of valves with dimensional ties. (4) SIDEWALKS. As-built drawings shall depict the location with respect to the street right-of-way, width, and vertical elevation. (5) POSITIVE DRAINAGE. Lots shall be laid out so as to provide positive drainage away from all buildings, and individual lot drainage shall be coordinated with the storm drainage pattern for the area. Drainage shall be designed so as to avoid concentration of storm drainage water from each lot onto adjacent lots and to avoid blockage of existing drainage patterns on adjacent properties. (f) INSPECTION AND ACCEPTANCE OF IMPROVEMENTS. If the City does not perform inspections pursuant to an engineering services agreement, the applicant shall provide a certification from a registered engineer or surveyor as to compliance with this Subsection. (1) INSPECTION REQUIRED. A. During the preparation of land and the installation of general improvements, periodic inspections shall be made to ensure conformity with the approved plans, specifications and standards. B. The applicant shall, at its expense, retain a professional engineer to perform the inspections required in Subsection (2) herein. The Director may make inspections at any time during the progress of work. C. All improvements required by these regulations shall be inspected prior to acceptance by the City. The applicant shall provide the Director with written reports of each final inspection, unless the inspection is performed by the Director. D. Improvements shall be completed and accepted prior to issuance of building permits, unless secured with performance surety in accordance with Section 31-512. An inspection shall be performed by the persons assigned pursuant to Subsection e., below. Said inspector(s) shall certify that all improvements have been completed in accordance with this Section, prior to recordation of the Final Plat. Certificates of occupancy shall not be issued by the Building Official for homes in subdivisions under performance bond until it is determined by the Director of Public Works that the streets have an acceptable all-weather surface and all other physical improvements are complete except for minor items such as placement of monuments, cleaning of curbs, gutters, catch basins, and/or the replacement of such defective items as curbs and gutters and roadway failures of small areas. E. During the installation of improvements as required by this Section, the Department of Public Works and Department of Public Utilities shall assign a staff person to inspect the subdivision. Salary and expense costs relating solely and exclusively to the inspection shall be reimbursed to the City by the developer. The applicant shall be billed monthly for the time actually spent on each subdivision based on the fee schedule adopted by the City Council. The applicant shall notify each department at least 48 hours prior to the installation of such utilities as required by this division in order to allow for the scheduling of inspectors. (2) INSPECTION SCHEDULE. The applicant shall notify the Department of Public Works and Department of Public Utilities when work is ready for final inspection. It shall be the responsibility of the applicant to notify the Director of the commencement of construction of improvements not less than 48 hours prior thereto. Inspections shall be required at each of the following stages of construction: A. Site grading/erosion control completion. B. Underground utility installation. C. Subgrade preparation prior to aggregate base installation. D. Aggregate base compaction. E. Concrete curb and gutter installation. F. Bituminous binder placing. G. Final surfacing prior to seal coat. (3) COMPLIANCE WITH STANDARDS. The applicant or the bonded construction contractor shall bear full and final responsibility for the installation and construction of all required improvements according to the provisions of these regulations and the standards and specifications of other public agencies. (4) ACCEPTANCE. A. Following such inspections, issuance of a certificate of approval to the subdivider or agent shall constitute acceptance by the City of such work, and shall serve as evidence for the release of any agreement and bond which may have been furnished for the guarantee of satisfactory installation, excluding the defect bond as required by Section 31-512(a)(4). Installation of improvements as required in this Section shall in no case serve to bind the City to accept such improvements for maintenance and operation until full acceptance by the City has been achieved in compliance with all regulations of this Article, including but not limited to satisfactory evidence being received stating that the freight, demurrage and all other bills have been paid. Such acceptance shall be subject to the existing regulations concerning the acceptance of each type of improvement. B. The City shall not have any responsibility with respect to any street, or other improvement, notwithstanding the use of the same by the public, unless the street or other improvements have been accepted. C. When improvements have been constructed in accordance with the requirements and conditions of these regulations and the specifications of this Article, and the applicant has submitted as-built reproducibles to the Director, the Director shall accept the improvements for maintenance by the City. D. The provisions shall not be construed to relieve the subdivider or the subdivider's agent or contractor of any responsibility in notifying any agency for the City of completed work and formal request for inspection of same. The approving authorities having jurisdiction shall inspect and approve all completed work prior to the release of any applied performance sureties. (5) SITE CLEANUP. The applicant shall be responsible for removal of all equipment, material, and general construction debris from the subdivision and from any lot, street, public way or property therein or adjacent thereto. Dumping of such debris into sewers, onto adjacent property or onto other land in the City is prohibited. (6) FAILURE TO COMPLETE IMPROVEMENTS. If a performance guarantee has been executed and security has been posted and required public improvements are not installed pursuant to the terms of the agreement, the Director may: A. Declare the performance guarantee to be in default and require that all public improvements be installed regardless of the extent of completion of the development at the time the agreement is declared to be in default; B. Obtain funds pursuant to the surety and complete the public improvements by itself or through a third party; C. Assign its right to receive funds pursuant to the surety in whole or in part to any third party, including a subsequent owner of the subdivision or addition for whom the public improvements were not constructed, in exchange for the subsequent owner's Agreement to complete the required public improvements; and/or D. Exercise any other rights available under the law.
(Ord. No. 18-O-058, § 2(Exh. B), 6-20-2018; Ord. No. 19-O-061, § 2(Exh. B), 7-17-2019)
Ask a question about Suffolk law
Corpus searches the Suffolk sections it holds and shows the ones that match, with their citations. Free, no sign-in.
