§ 232 — Communication towers; communication towers affixed to electric transmission line structures; small cell facilities
Code of the City of Virginia Beach, Virginia (Supp. No. 170: codified through Ordinance No. 3872, adopted September 1, 2026) · Virginia Beach City Code, App. A, art. 2, § 232
Corpus is an independent public-information project, not the official City of Virginia Beach website. Stable reference: corpuslaw.us/code/7aa65a50-4a0f-4f11-ba8c-a3e3cbd0bbee
Sec. 232. - Communication towers; communication towers affixed to electric transmission line structures; small cell facilities.
(a) Purpose; applicability. (1) The purpose of this section is to (1) facilitate the provision of wireless communications services to the citizens and businesses of the city; (2) minimize the risk of physical damage and other potential adverse impacts of communications towers; (3) require, where commercially reasonable, the joint use of communications towers by providers of wireless telecommunications services so as to avoid unnecessary proliferation of communication towers and related facilities; and (4) allow the use of public property under circumstances in which such use (i) minimizes the potential adverse visual and other impacts of communication towers and their appurtenances; (ii) does not adversely affect the operation of public facilities such as public safety communications facilities and water tanks for their primary purpose; and (iii) conforms to applicable requirements pertaining to the use of public property for purposes of communication tower siting. (2) Notwithstanding the provisions of Section 105(d) of this ordinance, any co-location of antenna arrays or other modifications to a communication tower or base station that substantially changes, whether individually or cumulatively, the physical dimensions of such tower or base station, shall require a new or modified conditional use permit. For purpose of this section, the standards set forth in Title 47, Part 1, Subpart CC of the Code of Federal Regulations (47 C.F.R. § 1.40001 et seq.), or any successor regulation, shall be determinative of whether a co-location or other modification substantially changes the physical dimensions of a communication tower or base station. (b) Definitions as used in this article, unless the context requires a different meaning: Administrative review-eligible project means a project that provides for: (1) The installation or construction of a new structure that is not more than fifty (50) feet above ground level, provided that the structure with attached wireless facilities is (i) not more than ten (10) feet above the tallest existing utility pole located within five hundred (500) feet of the new structure within the same public right-of-way or within the existing line of utility poles; (ii) not located within the boundaries of a local, state, or federal historic districts; (iii) not located inside the jurisdictional boundaries of a locality having expended a total amount equal to or greater than thirty-five (35) percent of its general fund operating revenue, as shown in the most recent comprehensive annual financial report, on undergrounding projects since 1980; and (iv) designed to support small cell facilities; or (2) The co-location on any existing structure of a wireless facility that is not a small cell facility. New structure means a wireless support structure that has not been installed or constructed, or approved for installation or construction, at the time a wireless services provider or wireless infrastructure provider applies to a locality for any required zoning approval. Standard process project means any project other than an administrative review-eligible project. (c) Administrative review-eligible. (1) Administrative review-eligible projects shall be administratively reviewed according to this section. (2) A fee of three hundred fifty dollars ($350.00) is established for administrative review and a fee of one thousand fifty dollars ($1,050.00) is established for standard process review. (d) The processing of any application submitted under administrative review or any zoning approval required for a standard process project shall be subject to the following: (1) Within ten (10) business days after receiving an incomplete application, the city shall notify the applicant that the application is incomplete. The notice shall specify any additional information required to complete the application. The notice shall be sent by electronic mail to the applicant's email address provided in the application. If the locality fails to provide such notice within such ten-day period, the application shall be deemed complete. (2) Except as provided in subdivision (3), a locality shall approve or disapprove a complete application: a. For a new structure within one hundred fifty (150) days of receipt of the completed application; or b. For the co-location of any wireless facility that is not a small cell facility within ninety (90) days of receipt of the completed application. (3) Any period specified in subdivision (2) for the city to approve or disapprove an application may be extended by mutual agreement between the applicant and the city. (e) No response. A complete application for a project shall be deemed approved if the city fails to approve or disapprove the application within the applicable period specified in subdivision (d) administrative review or any agreed extension. (f) Disapproval. If a locality disapproves an application submitted under (d) administrative review or for any zoning approval required for a standard process project: (1) The city shall provide the applicant with a written statement of the reasons for such disapproval; and (2) If the locality is aware of any modifications to the project as described in the application that if made would permit the city to approve the proposed project, the city shall identify them in the written statement provided under subsection (1). The city's subsequent disapproval of an application for a project that incorporates the modifications identified in such a statement may be used by the applicant as evidence that the locality's subsequent disapproval was arbitrary or capricious in any appeal of the city's action. (g) Discrimination. A locality's actions on disapproval of an application submitted under administrative review or for any zoning approval required for a standard process project shall: (1) Not unreasonably discriminate between the application and other wireless services providers, wireless infrastructure providers, providers of telecommunications services, another providers of functionally equivalent services; and (2) Be supported by substantial record evidence contained in a written record publicly released within thirty (30) days following the disapproval. (h) Appeal. An applicant adversely affected by the disapproval of an application submitted under administrative review or for any zoning approval required for a standard process project may file an appeal pursuant to law within thirty (30) days following delivery to the applicant or notice to the applicant of the record described in section (g). (i) Preapplication conference. Prior to submitting an application for an administrative review or standard process review, the applicant shall meet with the director of planning or his designee in order to discuss the application. (j) Application requirements. Applications shall include the following items: (1) A site plan or plan drawn to scale, showing the location and design of the proposed tower, including any accessory buildings or other appurtenances, vehicular parking areas, access points, landscaped areas, adjacent land uses, and any other information required by the planning director; (2) A landscaping plan showing the type, size, number and location of plant materials, including existing trees or other plant materials to be used; (3) A report from a professional engineer licensed in Virginia, under seal, detailing the height, design and total anticipated capacity of the proposed tower, including the number and type of antennas that can be accommodated, and any other information deemed necessary by the Building Code Administrator to determine whether such tower conforms to the requirements of the Virginia Uniform Statewide Building Code. Such report shall also include a certification from the engineer that the tower is capable of supporting the total anticipated capacity of the tower, including all appurtenances; (4) A certification from a professional engineer licensed in Virginia, under seal, that all antennas or antenna arrays intended to be affixed to the proposed tower comply with all applicable regulations promulgated by the Federal Communications Commission pertaining to the emission of radio frequency radiation; (5) Verifiable information satisfactory to the planning director of the lack of available space or structural capacity for the applicant's wireless telecommunications equipment on (i) existing towers, buildings or other structures, (ii) sites on which existing towers are located, or (iii) sites on which the proposed tower would be less visible from or located a greater distance from residential or apartment districts than the proposed location. Information submitted to demonstrate such findings shall include, but not be limited to: a. The absence of existing towers or other structures meeting the height, structural strength or other technical needs of the applicant within the appropriate geographic area; b. Engineering analyses demonstrating that the applicant's proposed equipment would cause interference with the equipment on an existing tower of other structure, or the equipment on an existing tower or other structure would cause interference with the applicant's proposed equipment; or c. Evidence that the rents, fees or other contractual provisions required to co-locate the applicant's antenna equipment on an existing communications tower, or to construct a communications tower on property to be purchased or leased, would be commercially unreasonable in light of the location of the proposed facilities; (6) Where the proposed communication tower or antenna is to be located within one (1) mile of an existing or planned public safety communications facility, an intermodulation study submitted by a professional engineer licensed in Virginia, under seal. Such study shall: a. Include the frequencies used by the city or other public entity for public safety purposes at any site within one (1) mile of the proposed facility; b. Analyze 2nd, 3rd, 5th and 7th order intermodulation calculations using the maximum number of signals for each order; and c. Include the frequencies used for each intermodulation order calculation, the name of the channel used and the bandwidth of each channel; (7) A geographical map, with sufficient markings and detail, illustrating that the proposed communications equipment will not be located within a two-hundred-foot buffer of the microwave path between any existing public safety communications sites; and (8) Where the proposed wireless communication equipment is to be located on a water tank or within the secure area of any water tank site, a security plan showing the times at which access to the proposed equipment will be allowed, the identities of the persons with authorized access to such facilities and such other information as the director of public utilities may require; provided, however, if such security plan is incorporated in a lease between the city and the applicant, this requirement shall be waived. (k) Locational and design requirements. In determining whether to grant or deny an application under administrative review or standard process for a communication tower or other wireless telecommunications equipment, the city council or Planning Department staff shall give primary consideration to the following factors: (1) Whether the proposed height of any wireless support structure, wireless facility, or wireless support structure with attached wireless facilities exceeds fifty (50) feet above ground level, provided that the locality follows a local ordinance or regulation that does not unreasonably discriminate between the applicant and other wireless services providers, wireless infrastructure providers of telecommunications services, and other providers of functionally equivalent services; or (2) Whether the applicant proposes to locate a new structure, or to co-locate a wireless facility, in an area where all cable and public utility facilities are required to be placed underground by a date certain or encouraged to be undergrounded as part of a transportation improvement project or rezoning proceeding as set forth in objectives contained in a comprehensive plan, if: a. The undergrounding requirement or comprehensive plan objective existed at least three (3) months prior to the submission of the application; b. The city allows the co-location of wireless facilities on existing utility poles, government-owned structures with the government's consent, existing wireless support structures, or a building within that area; c. The city allows the replacement of existing utility poles and wireless support structures with poles or support structures of the same size or smaller within that area; and d. The disapproval of the application does not unreasonably discriminate between the applicant and other wireless services providers, wireless infrastructure providers, providers of telecommunications services, and other providers of functionally equivalent services. (3) Nothing in this article shall prohibit an applicant from voluntarily submitting, and the locality from accepting, any conditions that otherwise address potential visual or aesthetic effects resulting from the placement of a new structure or facility. (4) Nothing in the article shall prohibit a locality from disapproving an application submitted under a standard process project on the basis of the availability of existing wireless support structures within a reasonable distance that could be used for co-location at reasonable terms and conditions without imposing technical limitations on the applicant. (l) Construction requirements. All communication towers shall comply with or exceed all applicable requirements of the Virginia Uniform Statewide Building Code, including all model codes incorporated therein. In addition, all such towers shall be non-illuminated and painted such color or colors as to minimize visibility, unless otherwise required by Federal Aviation Administration, Federal Communications Commission or other applicable laws or regulations. (m) No zoning approval required. The city shall not require zoning approval for (i) routine maintenance or (ii) the replacement of wireless facilities or wireless support structures within a six-foot perimeter with wireless facility or wireless support structures that are substantially similar or the same size or smaller. However, the city may require a permit to work within the right-of-way for that activities described in clause (i) or (ii), if applicable. (n) Reporting. That any publicly-owned or privately-owned wireless service provider operating within the Commonwealth or serving residents of the Commonwealth shall, by January 1, 2019, and annually thereafter until January 1, 2025, provide to the Department of Planning and Community Development a report detailing by county, city, and town enhanced service capacity in previously served areas and expansion of service in previously unserved geographic areas that are provided access to wireless services. Notwithstanding any other provision of law, the Department shall maintain the confidentiality of company-specific data but may publicly release aggregate data. (o) Landscaping and screening requirements. Landscaping and screening shall conform to the following standards: (1) Existing trees on the lot or within the leased area or other area within the control of the applicant shall be preserved to the maximum extent practicable; (2) To the extent permitted by applicable setback requirements, towers shall be located on a site so as to maximize the effectiveness of trees as screening. (p) Setback requirements. The following setback requirements shall apply to communication towers other than those affixed to electrical transmission line structures: (1) Minimum side and rear yard setbacks, as measured from the base of the communication tower, excluding its appurtenances, shall be fifty (50) feet in residential, apartment, mixed-use and agricultural districts and twenty-five (25) feet in all other districts. The minimum setback from any street, as measured from the base of the tower, shall be fifty (50) feet. (2) Minimum setbacks of equipment buildings shall be as specified in the zoning district regulations. (q) Public safety communications facilities; water tanks. In light of the special security and public safety concerns applicable to sites occupied by city facilities such as public safety communications facilities and water tanks, the following additional requirements shall apply: (1) Public safety communications facilities. No private wireless telecommunications facilities shall be allowed: (i) on sites with public safety communications facilities or within the secure compounds of such sites; (ii) in any location at which the director or communication and information technology determines, based upon an intermodulation study required by subdivision (7) of subsection (c), that the operation of the proposed wireless telecommunications facilities would present a substantial possibility of causing interference with one (1) or more public safety communications facilities and cannot be satisfactorily mitigated; or (iii) in any location within a two-hundred-foot buffer of the microwave path of any existing or future public safety communications microwave facility. (2) Water tanks. No private wireless telecommunications facilities shall be allowed on any city water tank or within the secure area of any water tank site unless there is a demonstrable public need for wireless telecommunications services in the area to be served by such facilities and there is no reasonable alternative site available. In such cases, the applicant shall be required, as a condition of the conditional use permit, to comply at all times with a security plan approved by the city council. (r) Other requirements. The following additional regulations shall apply to all communication towers: (1) No signage shall be permitted on any communication tower; (2) All communication towers and their appurtenances shall comply with applicable regulations of the Federal Communications Commission and Federal Aviation Administration. Where regulations and requirements of this section conflict with those of the Federal Communications Commission or the Federal Aviation Administration, the federal requirement shall govern; (3) All communication towers shall be subject to periodic reinspection by the building code administrator. If any additions, changes or modifications are to be made to the structural characteristics of the tower, the building code administrator shall have the authority to require proof, through the submission of engineering and structural data, that the addition, change or modification conforms to structural wind load and all other requirements of the Uniform Statewide Building Code; and (4) Any communication tower or wireless telecommunications equipment that are not in use for a period of one (1) year shall be removed within ninety (90) days after notification by the planning director. If not so removed, the city may contract for their removal and charge the cost thereof to the owner of the communication tower or wireless telecommunications equipment. (s) Special provisions for communication towers affixed to electric transmission line structures and building-mounted antennas. (1) Communication towers affixed to electric transmission line structures and building-mounted antennas shall be allowed as principal uses where so permitted in the district regulations, provided that the following requirements are met: a. Communication towers and building-mounted antennas shall be made of materials or painted in such manner as to match, to the maximum extent practicable, the color of the structure upon which they are affixed or mounted; b. Communication towers shall not project above the top of the structure to which they are affixed by more than twenty (20) percent of the height of the structure; c. The owner of the communication tower or his agent submits to the planning director a list containing the name and last known address of the owner of all abutting lots, as shown on the current real estate tax assessment books or current real estate tax assessment records. The planning director shall thereafter notify such property owners of the filing of the site plan or building permit application seeking approval of the communication tower. No such site plan or building permit shall be approved for a period of seven (7) days from the mailing of the notices; and d. Building-mounted antennas shall conform to the requirements of section 207.
(Ord. No. 3046, 8-26-08; Ord. No. 3403, 4-21-15; Ord. No. 3514, 7-11-17; Ord. No. 3574, 12-11-18; Ord. No. 3659, 5-11-21; Ord. No. 3660, 5-18-21)