§ 14.15.060 — Planned actions – Project review

Federal Way Revised Code (The Federal Way Revised Code is current through Ordinance 26-1052, passed September 1, 2026.) · Federal Way Revised Code § 14.15.060

Corpus is an independent public-information project, not the official City of Federal Way website. Stable reference: corpuslaw.us/code/19ed340e-eac5-4de4-8997-4a309553fc6a

14.15.060 Planned actions – Project review.

(1) Review of a project proposed as a planned action is intended to be simpler and more focused than for other projects. A project proposed as a planned action must qualify as the planned action designated in the planned action ordinance or resolution, and must meet the statutory criteria for a planned action in RCW 43.21C.031. Planned action project review shall include: (a) Verification that the project meets the description in, and will implement any applicable conditions or mitigation measures identified in, the designating ordinance or resolution; and (b) Verification that the probable significant adverse environmental impacts of the project have been adequately addressed in the EIS prepared under FWRC 14.15.040(1)(b) through review of an environmental checklist or other project review form as specified in WAC 197-11-315, filed with the project application. (2)(a) If the project meets the requirements of subsection (1) of this section, the project shall qualify as the planned action designated by the city, and a project threshold determination or EIS is not required. Nothing in this section limits the city from using this title or other applicable law to place conditions on the project in order to mitigate nonsignificant impacts through the normal local project review and permitting process. (b) If the project does not meet the requirements of subsection (1) of this section, the project is not a planned action and a threshold determination is required. In conducting the additional environmental review under this title, the lead agency may use information in existing environmental documents, including the EIS used to designate the planned action (refer to WAC 197-11-330(2)(a) and 197-11-600 through 197-11-635). If an EIS or SEIS is prepared on the proposed project, its scope is limited to those probable significant adverse environmental impacts that were not adequately addressed in the EIS used to designate the planned action. (3) Public notice for projects that qualify as planned actions shall be tied to the underlying permit. If notice is otherwise required for the underlying permit, the notice shall state that the project has qualified as a planned action. If notice is not otherwise required for the underlying permit, no special notice is required. However, the city is encouraged to provide some form of public notice as deemed appropriate.

(Ord. No. 07-554, § 5(Exh. A(1)), 5-15-07; Ord. No. 04-468, § 3, 11-16-04. Code 2001 § 18-76.)