For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14.15.130 — City center planned action

Federal Way Revised Code (The Federal Way Revised Code is current through Ordinance 26-1052, passed September 1, 2026.) · Federal Way Revised Code § 14.15.130

Corpus is an independent public-information project, not the official City of Federal Way website. Stable reference: corpuslaw.us/code/51a56350-b817-4ba9-88af-c446d15c27aa

14.15.130 City center planned action.

(1) Purpose. The city of Federal Way declares that the purpose of this section is to: (a) Combine environmental analysis with land use planning; and (b) Set forth a procedure designating certain project actions in a portion of the city center subarea as “planned actions” consistent with state law RCW 43.21C.440; and (c) Streamline and expedite the land use permit review process by relying on completed and existing environmental analysis for the planned action area; and (d) Apply the Federal Way Revised Code together with the mitigation framework in subsection (3) of this section for the purpose of processing planned action development applications. (2) Findings. The city of Federal Way finds that: (a) The city of Federal Way is required to prepare and implement plans in accordance with the provisions of the Growth Management Act, Chapter 36.70A RCW; (b) The city of Federal Way has adopted a comprehensive plan and city center subarea plan in compliance with the GMA; (c) The city center planned action environmental impact statement and supplemental environmental impact statement identify and address all significant environmental impacts associated with the planned action as defined in subsection (3) of this section; (d) The mitigation measures contained in Exhibit B, “Planned Action Mitigation Document,” adopted by ordinance on January 19, 2016, together with applicable city development standards, are adequate to mitigate the significant adverse environmental impacts of planned action development as defined in subsection (3)(c) of this section, subject to project review; (e) The expedited permit review procedures as set forth in this section are a benefit to the public, protect the environment, and enhance economic development; and (f) Opportunities for public involvement and review have been provided, and comments considered as part of preparation of the planned action environmental impact statement and supplemental environmental impact statement. (3) Procedures and criteria for evaluating and determining projects as planned actions. (a) Planned action site. The planned action designation shall apply to the approximately 215-acre site generally bounded by South 312th Street on the north, South 324th Street on the south, Pacific Highway South on the west and 23rd Avenue South on the east. Additional area is located east of 23rd Avenue South, bordered on the north by South 317th Street and on the south by South 319th Place and shown in Exhibit A, “City Center Planned Action Area Map,” adopted by ordinance on January 19, 2016. (b) Environmental document. A planned action designation for a site-specific application shall be based on the environmental analysis contained in the city center planned action environmental impact statement (EIS) completed by the city in 2006 and the supplemental environmental impact statement (SEIS) completed in 2015. “EIS” means the city center planned action environmental impact statement composed of the draft EIS (June 2006) and the final EIS (September 2006) and “SEIS” means the supplemental environmental impact statement composed of the draft SEIS (October 2015) and the final SEIS (December 2015). The planned action mitigation document is based upon the analysis of the EIS and SEIS. The mitigation document, together with applicable city codes, ordinances and standards, shall provide the framework for the decision by the city to impose conditions on a planned action project. (c) Planned action qualifications. (i) Land uses. The following uses are the primary uses analyzed in the SEIS. (A) Retail goods and services. (B) Office. (C) Lodging. (D) Residential. (ii) Development thresholds. The planned action designation applies to development proposals that cumulatively do not exceed the development envelope established by the SEIS, and shown in the planned action development envelope table below: Planned Action Development Envelope Table | Uses | Development Envelope | Retail | 475,000 sf | Office | 400,000 sf | Lodging | 600 rooms | Residential | 2,400 units The planned action designation also applies to demolition of existing development (no limitation on square footage). If proposed plans significantly change the environmental determinations of the SEIS, additional SEPA review may be required. Additional SEPA review may be conducted consistent with city SEPA procedures and state law. Shifting the total build-out of development among uses, or similar uses that may not be specifically listed in the above table, may be permitted so long as the total build-out does not exceed the aggregate amount of the development envelope, or trip generation reviewed in the SEIS, and so long as the impacts of that development have been identified and mitigated in the SEIS and mitigation document. (iii) The project is located within the planned action area. (iv) Transportation. (A) Vehicle trip generation. The trip generation alternatives reviewed in the SEIS are as follows: Trip Generation by Alternative | Time Period | 2025 No Action Alternative Total Trips | 2025 Action Alternative Total Trips | AM Peak Hour | 3,040 | 3,617 | PM Peak Hour | 6,919 | 6,792 The SEIS conducted quantitative analysis on a per-intersection basis of impacts and mitigation through 2025 (or the equivalent time, based on the cumulative totals of projected vehicle trips). (B) Trip threshold. Proposed development that would result in a cumulative total of trips that exceeds the maximum trip levels shown above would not qualify as a planned action. (C) Public works discretion. The public works director shall have discretion to determine incremental and total trip generation, consistent with the Institute of Traffic Engineers (ITE) General Manual (latest ed.), for each project permit application. (v) Elements of the environment analyzed in the SEIS. A project that would result in a significant change in impacts to any of the elements of the environment identified in the SEIS would not qualify as a planned action. (vi) Time horizon. The planned action designation is intended to be applicable until all development shown in the planned action development envelope table (subsection (3)(c)(ii) of this section) is constructed or until the total trips in the trip generation by alternative table (subsection (3)(c)(iv) of this section) are exceeded, or until December 31, 2025, whichever occurs first. Should environmental conditions significantly change from those analyzed in the SEIS, the SEPA official may determine that the planned action designation is no longer applicable unless additional, environmental review is conducted, regardless of the date. (d) Planned action review criteria. (i) Uses and activities described in the SEIS, subject to the qualifications described in subsection (3)(c) of this section and the mitigation measures in the planned action mitigation document, may be designated planned actions pursuant to RCW 43.21C.440. (ii) The SEPA official is authorized to designate a project application as a planned action pursuant to RCW 43.21C.440, if the project meets all of the following conditions: (A) The project is not otherwise exempt from SEPA; and (B) The project is consistent with the city of Federal Way Comprehensive Plan adopted under Chapter 36.70A RCW; and (C) The project is subsequent or implementing a project which has had its significant adverse environmental impacts adequately identified in the SEIS; and (D) The project falls within the planned action qualifications identified in subsection (3)(c) of this section; and (E) The SEPA official has determined that the project’s adverse impacts are able to be mitigated through the application of mitigation measures detailed in the planned action mitigation document, as well as other applicable city, county, state, and federal requirements and conditions; and (F) The proposed project complies with all applicable local, county, state, and federal regulations; and (G) The proposed project is not an essential public facility, as defined in RCW 36.70A.200, unless an essential public facility is accessory to or part of a development that is designated a planned action under this subsection. (e) Effect of planned action. (i) Upon designation by the SEPA official that the development proposal within the planned action area qualifies as a planned action pursuant to this section and WAC 197-11-172, the project shall not be subject to a SEPA threshold determination, an environmental impact statement (EIS), SEPA appeal or any other additional review under SEPA. (ii) Additionally, projects will be subject to applicable city, state and federal regulatory requirements. The planned action designation shall not exempt a project from meeting city code requirements. This includes paying applicable transportation impact fees (Chapter 19.91 FWRC) and making development improvements, including those for safety and access purposes (Chapter 19.135 FWRC). Projects that qualify as planned actions are not exempt from the transportation concurrency management program (Chapter 19.90 FWRC). (f) Planned action permit process. The director of community development or designee shall review projects and determine whether they meet the criteria as planned actions. The review procedure shall consist, at a minimum, of the following: (i) Development applications will meet the requirements of the Federal Way Revised Code. Applications shall be made on forms provided by the city. (ii) The director of community development will determine whether the application is complete as provided in FWRC 19.15.045. (iii) After the city receives and reviews a complete application, the SEPA official shall determine, utilizing the criteria and procedures contained in subsection (3)(d) of this section and WAC 197-11-172, whether the project qualifies as a planned action. If the project does qualify as a planned action, the director of community development shall notify the applicant, and the project shall proceed in accordance with the appropriate permit procedures, except that no additional SEPA review, threshold determination or EIS will be required. (iv) For projects that qualify as planned actions, public notice shall be provided as specified in FWRC 14.15.060(3). (v) If a project is determined not to be a planned action, the director of community development shall notify the applicant and prescribe a SEPA review procedure consistent with the city SEPA procedures and state law. The notice to the applicant shall describe the elements of the application that result in disqualification as a planned action. (vi) Projects disqualified as a planned action may use or incorporate relevant elements of the environmental review analysis in the SEIS prepared for the planned action, as well as other environmental review documents to assist in meeting SEPA requirements. The SEPA official may choose to limit the scope of the SEPA review to those issues and environmental impacts not previously addressed in the SEIS. (4) Planned action area monitoring. The city center planned action section shall be reviewed periodically by the director of community development to determine its continuing validity with respect to the environmental conditions of the project area and vicinity and applicability of planned action requirements, to ensure continued applicability of the transportation analysis and impacts. Based upon this review, this section may be amended as needed, and another review period may be specified. (5) Conflict. In the event of a conflict between this section or any mitigation measures imposed pursuant thereto and any ordinance or regulation of the city, the provisions of this section shall control.

(Ord. No. 16-811, § 1, 1-19-16; Ord. No. 14-779, § 1, 12-2-14; Ord. No. 10-659, § 1, 5-18-10; Ord. No. 07-552, § 1, 4-3-07; Ord. No. 07-547, §§ 1 – 5, 2-20-07. Code 2001 § 18-83.) | * Code reviser’s note: Ordinance No. 10-659, Exhibit B, amends Exhibit A of Ordinance No. 07-547. A copy of the exhibit is on file in the offices of the city.

Ask a question about Federal Way law

Corpus searches the Federal Way sections it holds and shows the ones that match, with their citations. Free, no sign-in.