§ 15.05.030 — Additional definitions
Federal Way Revised Code (The Federal Way Revised Code is current through Ordinance 26-1052, passed September 1, 2026.) · Federal Way Revised Code § 15.05.030
Corpus is an independent public-information project, not the official City of Federal Way website. Stable reference: corpuslaw.us/code/2eb6c35a-cd56-46b9-97b4-5a1886051c3c
15.05.030 Additional definitions.
Unless otherwise defined in this chapter, the definitions contained in this section, FWRC Title 15, Chapter 90.58 RCW, Chapters 173-26 and 173-27 WAC, Chapter 19.05 FWRC or FWRC 1.05.020 shall apply in that order. “Act” means the Washington State Shoreline Management Act of 1971, Chapter 90.58 RCW, as amended. “Amendment” means a revision, update, addition, deletion, and/or reenactment to the Federal Way shoreline master program. “Appurtenance, residential” means an improvement necessarily connected to the use and enjoyment of a single-family residence when located landward of the “ordinary high water mark (OHWM),” the perimeter of a wetland, and outside their corresponding required buffers. Appurtenances include a garage; driveway; utilities; water craft storage (upland); swimming pool; hot tub; retaining walls; fences; yards; sauna; cabana; antennas; decks; walkways; stairs; tram; and grading that does not exceed 250 cubic yards and which does not involve placement of fill in any wetland or waterward of a marine or freshwater OHWM. Appurtenances do not include secondary sleeping areas or accessory dwelling units. “Aquaculture” means the farming or culturing of food fish, shellfish or other aquatic plants and animals in streams, inlets, and other natural or artificial water bodies. Activities include the hatching, cultivating, planting, feeding, raising and harvesting of aquatic plants and animals, and the maintenance and construction of necessary equipment, buildings, and growing areas. Cultivation methods include but are not limited to fish pens, fish traps, or other similar apparatuses. “Average grade level” means, for a structure built on land, the average of the natural or existing topography of the portion of the lot, parcel, or tract of real property which will be directly under the proposed building or structure. In the case of structures to be built over the water, “average grade level” shall be the elevation of the ordinary high water mark (OHWM). Calculation of the average grade level shall be made by averaging the ground elevations at the midpoint of all exterior walls of the proposed building or structure. “Backshore” means a berm, together with associated marshes or meadows, on marine shores landward of the ordinary high water mark which is normally above high tide level and has been gradually built up by accretion. “Bank” means a steep rise or slope at the edge of a body of water or water course. “Beach nourishment” means the artificial replenishing of a beach by delivery of materials dredged or excavated elsewhere. “Berm” means a ledge or shoulder consisting of mounded earth or rock. “Bluff” means a steep slope which abuts and rises from Puget Sound. Bluffs contain slopes predominantly in excess of 40 percent, although portions may be less than 40 percent. The toe of the bluff is the beach of Puget Sound. The top of a bluff is typically a distinct line where the slope abruptly levels out. Where there is no distinct break in slope, the slope is either the line of vegetation separating the unvegetated slope from the vegetated uplands plateau or, when the bluff is vegetated, the point where the bluff slope diminishes to less than 15 percent. “Boating facility” means a facility or structure providing access in and out of the water for vessels, such as a launching ramp, rails, or lift station open to the public. For purposes of the shoreline master program, boating facilities do not include docks, piers, moorage piles, mooring buoys, or floats associated with single-family residences or other joint-use structures not accessible to the public. “Breakwater” means an off-shore structure, either floating or not, which may or may not be connected to the shore, such structure being designed to absorb and/or reflect back into the water body the energy of the waves. “Bulkhead” means a wall, seawall, embankment, or other structure erected at or near the OHWM and roughly parallel to the shoreline that retains or prevents sliding or erosion of land or protects land and/or structures from wave or current action. “Commercial use” means the uses allowed in the commercial zones and the nonindustrial uses permitted in the commercial enterprise zone. “Conditional use” means a use, development, or substantial development which is classified as a shoreline conditional use or is not classified within the shoreline master program. “Critical salmonid habitats” means habitats that are used by Pacific salmonid species that migrate between fresh water and salt water during their life cycle. These habitats include: (1) Gravel bottomed streams used for spawning; (2) Streams, lakes, and wetlands used for rearing, feeding, and cover and refuge from predators and high waters; (3) Streams and salt water bodies used as migration corridors; (4) Shallow areas of salt water bodies used for rearing, feeding, as well as cover and refuge from predators and currents, including, but not limited to, forage fish habitats such as sandy beaches and eelgrass beds; and (5) Pocket estuaries including stream mouths and deltas where fresh water mixes with salt water and provides rearing habitat for juvenile salmonids. All salt water shorelines in Federal Way are critical salmonid habitats. Date of filing. See FWRC 15.05.180(2), Final approval of shoreline permits, for full definition. “Department” means the department of community development services, unless the context indicates otherwise. “Development” means a use consisting of the construction or exterior alteration of structures; dredging; drilling; dumping; filling; removal of any sand, gravel, or minerals; bulkheading; driving of piling; placing of obstructions; or any project of a permanent or temporary nature which interferes with the normal public use of the surface of the waters overlying lands subject to the Shoreline Management Act (Chapter 90.58 RCW) at any state of water level. “Development” does not include dismantling or removing structures if there is no other associated development or redevelopment. “Dock” means all platform structures floating upon water bodies and connected to land to provide moorage or landing for waterborne pleasure craft. “Dredging” means the removal of earth from the bottom of a stream, marine water body, lake or other water body for the purposes of deepening and/or maintaining a navigational channel. “Drift cell” (also referred to as “drift sector,” or “littoral cell”) means a particular reach of marine shore in which littoral drift may occur without significant interruption and which contains any natural sources of such drift and also accretion shore forms created by such drift. “Ecological functions” means the work performed or role played by the physical, chemical, and biological processes in the shoreline that contribute to the maintenance of the aquatic and terrestrial environments that constitute the shoreline’s natural ecosystem. “Ecosystem-wide processes” means the suite of naturally occurring physical and geologic processes of erosion, transport, and deposition; and specific chemical processes that shape landforms within a specific shoreline ecosystem and determine both the types of habitat and the associated ecological functions. “Exemptions” means those development activities which are not required to obtain a substantial development permit, but which must obtain an authorized statement of exemption and which must otherwise comply with applicable provisions of the Shoreline Management Act and the city’s local shoreline master program. “Fair market value” means the open market bid price for conducting the work, using the equipment and facilities, and purchase of the goods, services, and materials necessary to accomplish the development. This would normally equate to the cost of hiring a contractor to undertake the development from start to finish, including the cost of labor, materials, equipment and facility usage, transportation and contractor overhead, and profit. The fair market value of the development shall include the fair market value of any donated, contributed or found labor, equipment, or materials. “Feasible” means that an action, such as a development project, mitigation, or preservation requirement, meets all of the following conditions: (1) The action can be accomplished with technologies and methods that have been used in the past in similar circumstances, or studies or tests have demonstrated in similar circumstances that such approaches are currently available and likely to achieve the intended results; (2) The action provides a reasonable likelihood of achieving its intended purpose; and (3) The action does not physically preclude achieving the project’s primary intended legal use. In determining an action’s feasibility, the reviewing agency may weigh the action’s relative public costs and public benefits considered in the short- and long-term time frames. “Fill” means the addition of soil, sand, rock, gravel, sediment, earth-retaining structure, or other material to an area waterward of the OHWM, in wetlands, or on shorelands in a manner that raises the elevation or creates dry land. “Float” means a structure or device which is not a breakwater and which is moored, anchored, or otherwise secured in the waters of Federal Way, and which is not connected to the shoreline. “Floating home” means a single-family dwelling unit constructed on a float that is moored, anchored, or otherwise secured in waters, and is not a vessel, even though it may be capable of being towed. “Floating on-water residence” means any floating structure other than a floating home, as defined by this chapter, that is designed or used primarily as a residence on the water and has detachable utilities. “Floodplain” means the 100-year floodplain and means that land area susceptible to inundation with a one percent chance of being equaled or exceeded in any given year. The limit of this area shall be based upon flood ordinance regulation maps or a reasonable method which meets the objectives of the Act. “Floodway” means the area that has been established in effective Federal Emergency Management Agency flood insurance rate maps or floodway maps. “Geologically hazardous areas” means areas which because of their susceptibility to erosion, landsliding, seismic, or other geological events are not suited to siting commercial, residential, or industrial development consistent with public health or safety concerns. Geologically hazardous areas include the following areas: (1) Erosion hazard areas are those areas having a severe to very severe erosion hazard due to natural agents such as wind, rain, splash, frost action, or stream flow. (2) Landslide hazard areas are those areas potentially subject to episodic downslope movement of a mass of soil or rock including, but not limited to, the following areas: (a) Any area with a combination of: (i) Slopes greater than 15 percent; (ii) Permeable sediment, predominantly sand and gravel, overlying relatively impermeable sediment or bedrock, typically silt and clay; and (iii) Springs or groundwater seepage. (b) Any area which has shown movement during the Holocene epoch, from 10,000 years ago to the present, or which is underlain by mass wastage debris of that epoch. (c) Any area potentially unstable as a result of rapid stream incision, stream bank erosion, or undercutting by wave action. (d) Any area located in a ravine or on an active alluvial fan, presently or potentially subject to inundation by debris flows or flooding. (e) Those areas identified by the United States Department of Agriculture Soil Conservation Service as having a severe limitation for building site development. (f) Those areas mapped as Class U (unstable), UOS (unstable old slides), and URS (unstable recent slides) by the Department of Ecology. (g) Slopes having gradients greater than 80 percent subject to rockfall during seismic shaking. (3) Seismic hazard areas are those areas subject to severe risk of earthquake damage as a result of seismically induced ground shaking, slope failure, settlement or soil liquefaction, or surface faulting. These conditions occur in areas underlain by cohesionless soils of low density usually in association with a shallow groundwater table. (4) Steep slope hazard areas are those areas with a slope of 40 percent or greater and with a vertical relief of 10 or more feet, a vertical rise of 10 feet or more for every 25 feet of horizontal distance. A slope is delineated by establishing its toe and top, and measured by averaging the inclination over at least 10 feet of vertical relief. “Geotechnical report” or “geotechnical analysis” means a scientific study or evaluation conducted by a qualified expert that includes a description of the ground and surface hydrology and geology; the affected land form and its susceptibility to mass wasting, erosion, and other geologic hazards or processes; conclusions and recommendations regarding the effect of the proposed development on geologic conditions; the adequacy of the site to be developed; the impacts of the proposed development; alternative approaches to the proposed development; and measures to mitigate potential site-specific and cumulative geological and hydrological impacts of the proposed development, including the potential adverse impacts to adjacent and down-current properties. “Grading” means the movement or redistribution of the soil, sand, rock, gravel, sediment, or other material on a site in a manner that alters the natural contour of the land. “Groin” means a barrier type structure extending from the backshore into the water across the beach. The purpose of a groin is to interrupt sediment movement along the shore. “Height” means that distance measured from average grade level to the highest point of a structure; excluding television antennas, chimneys, temporary construction equipment, and similar appurtenances except where such appurtenances obstruct the view of the shoreline of a substantial number of residences on areas adjoining such shorelines, or the applicable master program specifically requires that such appurtenances be included. “Jetty” means an artificial barrier used to change the natural littoral drift to protect inlet entrances from clogging by excess sediment. “Landslide” means an episodic downslope movement of a mass of soil or rock that includes but is not limited to rockfalls, slumps, mudflows, and earthflows. “Littoral drift” means the natural movement of sediment along marine or lake shorelines by wave action in response to prevailing winds. “Marine” means pertaining to tidally influenced waters, including Puget Sound and the bays, estuaries, and inlets associated therewith. “Mooring buoys” means a floating object anchored to the bottom of a water body that provides tie-up capabilities for vessels. “Native shoreline vegetation” means trees, shrubs, and other plant species that are indigenous to a specific area or region and native to Western Washington as referenced in Flora of the Pacific Northwest (Hitchcock and Cronquist). Ornamental landscaping and invasive species shall not be considered native shoreline vegetation. “Natural or existing topography” means the topography of the lot, parcel, or tract of real property immediately prior to any site preparation or grading, including excavating or filling. “Nearshore” means either nearshore environment or nearshore habitat and refers generally to an area along the Puget Sound shoreline that extends from the top of bluffs or upland area immediately adjacent to the beach to the point where sunlight penetrates marine waters to a depth where aquatic plant life is supported. “Nonconforming development” means an existing structure that was lawfully constructed when it was built but is no longer fully consistent with present regulations, such as setbacks, buffers, or yards; area; bulk; height or density standards, due to subsequent changes to the master program. “Nonconforming lot” means a lot that met dimensional requirements of the applicable master program at the time of its establishment but now contains less than the required width, depth, or area due to subsequent changes to the master program. Nonconforming structure. See “nonconforming development.” “Nonconforming use” means a shoreline use which was lawfully established prior to the effective date of the Act or the applicable shoreline master program, or amendments thereto, but which does not conform to present use regulations of the shoreline master program. “Non-water-oriented uses” means those uses that are not water dependent, water related, or water enjoyment, and which have little or no relationship to the shoreline and are not considered priority uses under the Shoreline Management Act. Examples include professional offices, automobile sales or repair shops, mini-storage facilities, multifamily residential development, department stores, and gas stations. “Ordinary high water mark (OHWM)” means the mark on all lakes, streams, and tidal waters that will be found by examining the beds and banks and ascertaining where the presence and action of waters are so common and usual and so long continued in all ordinary years as to mark upon the soil a character distinct from that of the abutting upland, in respect to vegetation, as that condition existed on June 1, 1971, as it may naturally change thereafter, or as it may change thereafter in accordance with permits issued by a local government or the Department of Ecology. In any area where the ordinary high water mark cannot be found, the ordinary high water mark adjoining salt water shall be the line of mean higher high tide and the ordinary high water mark adjoining fresh water shall be the line of mean high water. “Permit” means any substantial development, variance, conditional use permit, or revision authorized under Chapter 90.58 RCW. “Pier” means any fixed platform structure upon water bodies that is supported by piles and connected to land. “Primary structure” means the structure associated with the principal use of the property. If more than one structure is associated with the principal use of the property, the one with the highest value shall be considered the primary structure. “Public access” means the general public’s ability to view, reach, touch, and enjoy the water’s edge and use the state’s public waters, the water/land interface, and associated public shoreline area. Public access also includes actual, physical, unobstructed access from land to the ordinary high water mark or adjacent shorelands. “Public utility” means the facilities of a private business organization such as a public service corporation, or a governmental agency performing some public service and subject to special governmental regulations, the services which are paid for directly by the recipients thereof. Such services shall include but are not limited to: water supply, electric power, telephone, cablevision, natural gas, and transportation for persons and freight. The term also includes broadcast towers, antennas, and related facilities operated on a commercial basis. “Recreational development” means commercial and public facilities designed and used to provide recreational opportunities to the public. “Replacement structure” means the construction of a new structure to perform the same function as an existing structure that can no longer adequately serve its purpose. Additions to or increases in size of existing structures shall not be considered replacement structures. “Residential development” means developments and occupancy in which persons sleep and prepare food, other than developments used for transient occupancy. Residential development includes the creation of new residential lots through subdivision of land. Residential development does not include floating homes, floating on-water residences, live-aboard vessels, or converted residential appurtenances. “Restoration” means, in the context of “ecological restoration,” the reestablishment or upgrading of impaired ecological shoreline processes or functions. This may be accomplished through measures including, but not limited to, revegetation, removal of intrusive shoreline structures, and removal or treatment of toxic materials. Restoration does not imply a requirement for returning the shoreline area to aboriginal or pre-European settlement conditions. “Riprap” means a layer, facing, or protective mound of angular stones randomly placed to prevent erosion, scour, or sloughing of a structure or embankment; also, the stone so used. “Shall” means a mandate; the action must be done. “Shorelands,” also referred to as “shoreland areas,” means those lands extending landward for 200 feet in all directions as measured on a horizontal plane from the ordinary high water mark; floodways, and contiguous floodplain areas landward 200 feet from such floodways; and all wetlands and river deltas associated with the streams, lakes, and tidal waters which are subject to the provisions of this chapter; the same to be designated as to location by the Department of Ecology. “Shoreline administrator” means the director of the department of community development or his or her designee and is responsible for administering the Federal Way shoreline master program. “Shoreline environment designation” means the categories of shorelines of the state established by the city of Federal Way shoreline management master program to differentiate between areas whose features imply differing objectives regarding their use and future development. “Shoreline jurisdiction” means all “shorelines of the state” and “shorelands” as defined in the Federal Way shoreline master program and RCW 90.58.030. “Shoreline master program (SMP)” means the comprehensive use plan for a described area, and the use regulations together with maps, diagrams, charts, or other descriptive material and text, a statement of desired goals, and standards developed in accordance with the policies enunciated in RCW 90.58.020. “Shoreline modifications” means those actions that modify the physical configuration or qualities of the shoreline area, usually through the construction of a physical element such as a dike, breakwater, pier, weir, dredged basin, fill, bulkhead, or other shoreline structure. They can include other actions, such as clearing and grading. “Shoreline stabilization” means structural and nonstructural actions taken to address erosion impacts to property, dwellings, businesses, or structures caused by natural shoreline processes such as currents, floods, tides, wind, or wave action. Expansion or enlargement of existing stabilization measures is considered new stabilization. “Shoreline variance” means to grant relief from the specific bulk, dimensional, or performance standards in the local shoreline master program, but not a means to vary a “use” of a shoreline. “Shorelines” means all of the water areas of the state, including reservoirs, and their associated shorelands, together with the lands underlying them; except (1) shorelines of statewide significance; (2) shorelines on segments of streams upstream of a point where the mean annual flow is 20 cubic feet per second or less and the wetlands associated with such upstream segments; and (3) shorelines on lakes less than 20 acres in size and wetlands associated with such small lakes. “Shorelines of statewide significance” means those areas of Puget Sound in the city of Federal Way lying seaward from the line of extreme low tide. “Shorelines of the state” means the total of all “shorelines” and “shorelines of statewide significance” within the city of Federal Way. “Should” means that the particular action is required unless there is a demonstrated, compelling reason, based on policy of the Shoreline Management Act and this title, against taking the action. “SMA” means the Shoreline Management Act. “SMP” means the shoreline master program. “Soft-shore bank stabilization” means the use of bioengineering or biotechnical bank stabilization measures where vegetation, logs, rock, and beach nourishment are used to address erosion control and slope stability. “Stringline setback” means a straight line drawn between the points on the primary structures having the greatest projection waterward on the two adjacent properties. If one of the adjacent properties is unimproved, the line shall be drawn to the point of the standard shoreline setback at the side property line of the unimproved lot. “Structure” means a permanent or temporary edifice or building, or any piece of work artificially built or composed of parts joined together in some definite manner, whether installed on, above, or below the surface of the ground or water, except for vessels. “Substantial accessory structure” means nonprimary structures equal to or larger than 400 square feet and in good repair. “Vegetation conservation area” means an upland area adjacent to the ordinary high water mark or top of bluff where existing native vegetation and native trees shall be retained per the requirements of the Federal Way shoreline master program. The width of the vegetation conservation area is consistent with setback requirements for specific uses and shoreline environment designations. “Vessel” means ships, boats, barges, or any other floating craft which are designed and used for navigation and do not interfere with the normal public use of the water. “Water quality” means the physical characteristics of water within shoreline jurisdiction, including water quantity, hydrological, physical, chemical, aesthetic, recreation-related, and biological characteristics. Where used in this title, the term “water quantity” refers only to development and uses regulated under this chapter and affecting water quantity, such as impermeable surfaces and stormwater handling practices. Water quantity, for purposes of this title, does not mean the withdrawal of groundwater or diversion of surface water pursuant to RCW 90.03.250 through 90.03.340. “Water-dependent use” means a use or portion of a use which cannot exist in any other location and is dependent on the water by reason of the intrinsic nature of its operations. Examples of water-dependent uses may include ship cargo terminal loading areas, ferry and passenger terminals, barge loading facilities, ship building and dry docking, marinas, aquaculture, float plane facilities, and sewer outfalls. “Water-enjoyment use” means a recreational use or other use that facilitates public access to the shoreline as a primary characteristic of the use; or a use that provides for recreational use or aesthetic enjoyment of the shoreline for a substantial number of people as a general characteristic of the use and which through location, design, and operation ensures the public’s ability to enjoy the physical and aesthetic qualities of the shoreline. In order to qualify as a water-enjoyment use, the use must be open to the general public and the shoreline-oriented space within the project must be devoted to the specific aspects of the use that foster shoreline enjoyment. “Water-oriented use” means a use that is water dependent, water related, or water enjoyment, or a combination of such uses. “Water-related” means a use or portion of a use which is not intrinsically dependent on a waterfront location but whose economic vitality is dependent upon a waterfront location because: (1) Of a functional requirement for a waterfront location such as the arrival or shipment of materials by water or the need for large quantities of water; or (2) The use provides a necessary service supportive of the water-dependent commercial activities and the proximity of the use to its customers makes its services less expensive and/or more convenient. Examples include professional services serving primarily water-dependent activities and storage of water-transported foods. “Wetland” means areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. Wetlands do not include those artificial wetlands intentionally created from nonwetland sites, including, but not limited to, irrigation and drainage ditches, grass-lined swales, canals, detention facilities, wastewater treatment facilities, farm ponds, and landscape amenities, or those wetlands created after July 1, 1990, that were unintentionally created as a result of the construction of a road, street, or highway. Wetlands may include those artificial wetlands intentionally created from nonwetland areas to mitigate the conversion of wetlands. Article II. Shoreline Regulation
(Ord. No. 19-873, § 4, 7-2-19; Ord. No. 11-705, § 5 (Exh. B), 11-1-11.)
Ask a question about Federal Way law
Corpus searches the Federal Way sections it holds and shows the ones that match, with their citations. Free, no sign-in.
