§ 14.23.030 — Wastewater Discharge Permit Requirements

Code of Ordinances of the City of Kennewick, Washington (Codified through Ordinance No. 26-6253, enacted September 15, 2026 (Supp. No. 19)) · Kennewick Municipal Code § 14.23.030

Corpus is an independent public-information project, not the official City of Kennewick website. Stable reference: corpuslaw.us/code/ebb638f3-54a3-4be4-945d-23d04e640601

14.23.030: - Wastewater Discharge Permit Requirements.

No significant industrial user shall discharge wastewater into the POTW without first obtaining a wastewater discharge permit from the Public Works Director; the permit must be enforceable and contain all the elements as required by 40 CFR 403.8(t)(1)(iii)(B). Any violation of the terms and conditions of a wastewater discharge permit shall be deemed a violation of this chapter and subjects the wastewater discharge permittee to the sanctions set out in this chapter. Obtaining a wastewater discharge permit does not relieve a permittee of its obligation to comply with all federal and state pretreatment standards or requirements or with any other requirements of federal, state and local law. The Public Works Director may require other users, including liquid waste haulers, to obtain wastewater discharge permits (as necessary) to carry out the purposes of this chapter. (1) Wastewater Discharge Permitting—Existing Significant Industrial User (SIU). Any SIU that was discharging wastewater into the POTW prior to the effective date of the ordinance codified in this chapter and that wishes to continue such discharges in the future shall, within 60 days after notification by the Public Works Director, submit a permit application to the City in accordance with subsection (4) of this section and shall not cause or allow discharges to the POTW to continue after 90 days of the effective date of the ordinance codified in this chapter except in accordance with a wastewater discharge permit issued by the Public Works Director. (2) Wastewater Discharge Permitting—New Source and New User. At least 180 days prior to the anticipated start-up, unless specifically authorized by the Public Works Director, any new source, sources that become a user subsequent to the promulgation of an applicable categorical pretreatment standard and "new users" considered by the City to fit the definition of SIU, shall apply for a wastewater discharge permit and will be required to submit to the City at least the information listed in subsections (5)(a) through (e) of this section. A new source or "new user" cannot discharge without first receiving a wastewater discharge permit from the City. New sources and "new users" shall also be required to include in their application information the method of pretreatment the user intends to use to meet applicable pretreatment standards. New sources and "new users" shall give estimates of the information requested in subsections (5)(d) and (e) of this section. (3) Pretreatment Equipment Modification. Before the construction, addition or modification of pretreatment equipment, the user must submit an engineering report to the City and/or WDOE for approval. (4) Wastewater Discharge Permitting - Extra Jurisdictional Users. Any existing user located beyond the City limits who is required to obtain a wastewater discharge permit shall submit a wastewater discharge permit application as outlined in subsection (1) of this section. New source and "new users" located beyond the City limits required to obtain a wastewater discharge permit shall comply with subsection (2) of this section. (5) Wastewater Discharge Permit Application Contents. All users required to obtain a wastewater discharge permit must submit, at a minimum, the following baseline information. The Public Works Director shall approve a form to be used as a permit application. Categorical users submitting the following information shall have complied with 40 CFR 403.12(b). (a) Identifying Information. The user shall submit the name and address of the facility including the name of the operator and owners; (b) Permits. The user shall submit a list of any environmental control permits held by or for the facility; (c) Description of Operations. The user shall submit a brief description of the nature, average rate of production and standard industrial classification of the operation(s) carried out by such industrial user, including a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW; number of employees; hours of operation; each product produced by type, amount, process or processes and rate of production; type and amount of raw materials processed (average and maximum per day) and the time and duration of discharges. This description should also include a schematic process diagram which indicates points of discharge to the POTW from the regulated or manufacturing processes. Disclosure of site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections, inspection manholes, sampling chambers and appurtenances by size, location and elevation. (d) Flow Measurement. (i) Categorical User. The user shall submit information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from each of the following: (A) Regulated or manufacturing process streams; and (B) Other streams as necessary to allow use of the combined waste stream formula of 40 CFR 403.6(e). (ii) Noncategorical User. The user shall submit information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from each of the following: Total process flow, wastewater treatment plant flow, total plant flow or individual manufacturing process flow as required by the Public Works Director. The City may allow for verifiable estimates of these flows where justified by cost or feasibility considerations. (e) Measurements of Pollutants. (i) Categorical User. (A) The user shall identify the applicable pretreatment standards for each regulated or manufacturing process. (B) In addition, the user shall submit the results of sampling and analysis identifying the nature and concentration (or mass where required by the categorical pretreatment standard or as required by the City) of regulated pollutants (including standards contained in KMC 14.23.020(1) through (5), as appropriate) in the discharge from each regulated or manufacturing process. Both daily maximum and average concentration (or mass, where required) shall be reported. The sample shall be representative of daily operations and shall conform to sampling and analytical procedures outlined in KMC 14.23.050. (C) The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this subsection. (D) Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e) for a categorical user covered by a categorical pretreatment standard, this adjusted limit, along with supporting data, shall be submitted as part of the application. (ii) Noncategorical User. (A) The user shall identify the applicable pretreatment standards for its wastewater discharge. (B) In addition, the user shall submit the results of sampling and analysis identifying the nature and concentration (or mass where required by the City) of regulated pollutants contained in KMC 14.23.020(1) through (5), as appropriate in the discharge. Both daily maximum and average concentration (or mass, where required) shall be reported. The sample shall be representative of daily operations and shall conform to sampling and analytical procedures outlined in KMC 14.23.050. (C) The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this subsection. (D) Where the Public Works Director developed alternate concentration or mass limits because of dilution, this adjusted limit along with supporting data shall be submitted as part of the application. (f) Certification. The user shall submit a statement, reviewed by an authorized representative of the user and certified by a qualified professional as outlined in subsection (6) of this section, indicating whether the applicable pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required for the user to meet the applicable pretreatment standards and requirements. (g) Compliance Schedule. If additional pretreatment and/or O&M will be required to meet the applicable pretreatment standards, the user will provide the shortest schedule by which the user will provide such additional pretreatment and/or O&M. The user's schedule shall conform to the requirements of KMC 14.23.040(4). The completion date in this schedule shall not be later than the compliance date established pursuant to KMC 14.23.020(10). (i) Where the user's categorical pretreatment standard has been modified by a removal allowance (40 CFR 403.7), the combined waste stream formula (40 CFR 403.6(e)), and/or a fundamentally different factors variance (40 CFR 403.13) at the time the user submits the report required by this subsection, the information required by subsections (5)(f) and (g) of this section shall pertain to the modified limits. (ii) If the categorical pretreatment standard is modified by a removal allowance (40 CFR 403.7), the combined waste stream formula (40 CFR 403.6(e)), and/or a fundamentally different factors variance (40 CFR 403.13) after the user submits the report required by subsections (5)(f) and (g) of this section, a new report shall be submitted by the user within 60 days after the modified limit is approved. (h) The user shall submit any other information as may be deemed necessary by the Public Works Director to evaluate the wastewater discharge permit application. Incomplete or inaccurate applications will not be processed and will be returned to the user for revision. (6) Signatory and Certification Requirement. All wastewater discharge permit applications and user reports must be signed by an authorized representative. For the purpose of this section, a responsible officer or manager means: (a) A president, vice-president, secretary, or treasurer of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation; or (b) The manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations and initiating and directing other comprehensive measures to assure long-term environmental compliance with environmental laws and regulations; can ensure that the necessary information for control mechanism requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. This authorization must be made in writing by the principal executive officer or ranking elected official and submitted to the approval authority prior to, or together with, the report being submitted of the user and contain the following certification statement: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of a fine and imprisonment for knowing violations. A duly authorized representative is an individual designated by the responsible officer, manager, sole proprietor or general partner in writing. The written authorization must be submitted to the City and also specifies either an individual or a position having the responsibility of the overall operation of the facility from which the industrial discharge originates, such as the position of plant manager, operator of a well, or well field superintendent, or a position of equivalent responsibility, or having overall responsibility for environmental matters for the company. If an authorization in this section is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, or overall responsibility for environmental matters for the company, a new authorization satisfying the requirements of this section must be submitted to the City prior to or together with any reports to be signed by an authorized representative. (7) Wastewater Discharge Permit Issuance Decisions. The Public Works Director will evaluate the data furnished by the user and may require additional information. Within 90 days of receipt of a complete wastewater discharge permit application, the Public Works Director will determine whether or not to issue a wastewater discharge permit. Upon a determination to issue, the permit shall be issued within 90 days of full evaluation and acceptance of the data furnished. The Public Works Director may deny any application for a wastewater discharge permit. Justifications for decisions made during the permitting process are summarized in an industrial user "fact sheet." A fact sheet briefly sets forth the principal facts and the significant legal, procedural and policy decisions considered in preparing an industrial wastewater permit. The fact sheet contains, at a minimum, the following components: (a) Description of industrial user; (b) Discharge information; (c) Basis for permit limits; (d) Special conditions in permit; and (e) Calculation used to derive each limit. (8) Wastewater Discharge Permit Contents. Wastewater discharge permits shall include such conditions as are reasonably deemed necessary by the Public Works Director to prevent pass through or interference, protect the quality of the water body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal and protect against damage to the POTW. (a) Wastewater discharge permits must contain the following conditions: (i) A statement that indicates wastewater discharge permit duration, which in no event shall exceed five years; (ii) A statement that the wastewater discharge permit is nontransferable without prior notification to and approval from the City and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit; (iii) Applicable pretreatment standards and requirements, including any special state requirements; (iv) Self-monitoring, sampling, reporting, notification, submittal of technical reports, compliance schedules and record-keeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency and sample type based on federal, state and local law; (v) Requirement for immediate notification to the City where self-monitoring results indicate noncompliance; (vi) Requirement to report a bypass or upset of a pretreatment facility; (vii) Requirement to report immediately to the City all discharges, including slug loadings, that could cause problems to the POTW; (viii) Requirement for the SIU who reports noncompliance to repeat the sampling and analysis and submit results to the City within 30 days after becoming aware of the violation; (ix) A statement of applicable civil, criminal and administrative penalties for violation of pretreatment standards and requirements and any applicable compliance schedule; (x) Requirements to control slug discharges, if determined by the POTW to be necessary. (b) Wastewater discharge permits may contain, but need not be limited to, the following conditions: (i) Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization; (ii) Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works; (iii) Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or routine discharges; (iv) Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW; (v) The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the POTW; (vi) Requirements for installation and maintenance of inspection and sampling facilities and equipment; (vii) A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit; (viii) Any special agreements the Public Works Director chooses to continue or develop between the City and user; and (ix) Other conditions as deemed appropriate by the Public Works Director to ensure compliance with this chapter, and state and federal laws, rules and regulations. (9) Wastewater Discharge Permit Appeals. Any person, including the user, may petition the City to reconsider the terms of a wastewater discharge permit within 30 days of its issuance. (a) Failure to submit a timely petition for review shall be deemed to be a waiver of the administrative appeal. (b) In its petition, the appealing party must indicate the wastewater discharge permit provisions objected to, the reasons for this objection and the alternative condition, if any, it seeks to place in the wastewater discharge permit. (c) The effectiveness of the wastewater discharge permit shall not be stayed pending the appeal. (d) If the City fails to act within 30 days, a request for reconsideration shall be deemed to be denied. Decisions not to reconsider a wastewater discharge permit, not to issue a wastewater discharge permit, or not to modify a wastewater discharge permit, shall be considered final administrative actions for purposes of judicial review. (e) Aggrieved parties seeking judicial review of the final administrative wastewater discharge permit decision must do so by filing a complaint with the Benton County Superior Court for jurisdiction within two years of the denial of the permit. (10) Wastewater Discharge Permit Duration. Wastewater discharge permits shall be issued for a specified time period, not to exceed five years. A wastewater discharge permit may be issued for a period less than five years, at the discretion of the Public Works Director. Each wastewater discharge permit will indicate a specific date upon which it will expire. (11) Wastewater Discharge Permit Modification. The Public Works Director may modify the wastewater discharge permit for good cause including, but not limited to, the following: (a) To incorporate any new or revised federal, state, or local pretreatment standards or requirements; (b) To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since the time of wastewater discharge permit issuance; (c) A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge; (d) Information indicating that the permitted discharge poses a threat to the City's POTW, city personnel, or the receiving waters; (e) Violation of any terms or conditions of the wastewater discharge permit; (f) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required report; (g) Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13; (h) To correct typographical or other errors in the wastewater discharge permit; or (i) To reflect a transfer of the facility ownership and/or operation to a new owner/operator. (12) Wastewater Discharge Permit Transfer. Wastewater discharge permits may be reassigned or transferred to a new owner and/or operator only if the permittee gives at least 30 days' advance notice to the Public Works Director and the Public Works Director approves the wastewater discharge permit transfer. The notice to the Public Works Director must include a written certification by the new owner and/or operator which: (a) States that the new owner and/or operator has no immediate intent to change the facility's operations and processes; (b) Identifies the specific date on which the transfer is to occur; and (c) Assumes full responsibility for complying with the existing wastewater discharge permit beginning on the date of transfer. Failure to provide advance notice of a transfer renders the wastewater discharge permit voidable as of the date of facility transfer. Provided that the above occurs and that there were no significant changes to the manufacturing operation or wastewater discharge, the new owner will be considered an existing user and be covered by the existing limits and requirements in the previous owner's permit. (13) Wastewater Discharge Permit Revocation. Wastewater discharge permits may be revoked for, but not limited to, the following reasons: (a) Failure to notify the City of significant changes to the wastewater prior to the changed discharge; (b) Failure to provide prior notification to the City of changed conditions; (c) Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application; (d) Falsifying self-monitoring reports; (e) Tampering with monitoring equipment; (f) Refusing to allow the City timely access to the facility premises and records; (g) Failure to meet discharge limitations; (h) Failure to pay fines; (i) Failure to pay sewer charges; (j) Failure to meet compliance schedules; (k) Failure to complete a wastewater survey or the wastewater discharge permit application; (l) Failure to provide advance notice of the transfer of a permitted facility; (m) If the City has to invoke its emergency provision as cited in KMC 14.23.090(7); or (n) Violation of any pretreatment standard or requirement, or any terms of the wastewater discharge permit or this chapter. Wastewater discharge permits shall be voidable upon cessation of operations or transfer of business ownership. All wastewater discharge permits issued to a particular user are void upon the issuance of a new wastewater discharge permit to that user. (14) Wastewater Discharge Permit Reissuance. A user who is required to have a wastewater discharge permit shall apply for wastewater discharge permit reissuance by submitting a complete wastewater discharge permit application, in accordance with subsection (5) of this section, a minimum of 180 days prior to the expiration of the user's existing wastewater discharge permit. A user whose existing wastewater discharge permit has expired and who has submitted its re-application in the time period specified herein shall be deemed to have an effective wastewater discharge permit until the City issues or denies the new wastewater discharge permit. A user whose existing wastewater discharge permit has expired and who failed to submit its re-application in the time period specified herein will be deemed to be discharging without a wastewater discharge permit. (15) Pretreatment Equipment Modification. Before the construction, addition or modification of pretreatment equipment, the user must submit an engineering report to the City for approval. (16) Public Notice. The City's pretreatment program encourages public involvement of permit development activities by publishing an announcement on the City's official webpage two weeks prior to the issuance of an industrial wastewater permit. The publication describes the industrial user applying for a permit, the tentative determination of the permit process, and where interested persons can submit written comments and/or review proposed permits and related documents. If the comments received indicate significant public interest in the proposed permit, or if useful information could be produced thereby, the Public Works Director may hold a public hearing on the application. Public notice regarding any hearing will be circulated at least 30 days in advance of the public hearing on the city's webpage and notifications will be sent to all individuals providing comments that provide contact information. If a small number of comments are received, the City's pretreatment program will review them and respond in writing, either on an individual basis to each comment or comments in a single "Response to Comment" document issued at the same time as the final permit.

(Ord. 5420 Sec. 1(part), 2012)