For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14.23.040 — Reporting Requirements

Code of Ordinances of the City of Kennewick, Washington (Codified through Ordinance No. 26-6253, enacted September 15, 2026 (Supp. No. 19)) · Kennewick Municipal Code § 14.23.040

Corpus is an independent public-information project, not the official City of Kennewick website. Stable reference: corpuslaw.us/code/395f35b7-4138-4583-a80f-0016714495e9

14.23.040: - Reporting Requirements.

(1) Baseline Monitoring Reports. Categorical users who submit permit applications as described in KMC 14.23.030(5) shall be considered to have complied with requirement in 40 CFR Section 403.12(b) to submit baseline monitoring reports. (2) Final Compliance Report (Initial Compliance Report). (a) Within 90 days following the date for final compliance by the significant industrial user with applicable pretreatment standards and requirements set forth in this chapter, in a wastewater discharge permit, or within 30 days following commencement of the introduction of wastewater into the POTW by a new source or new users considered by the City to fit the definition of SIU, the affected user shall submit to the City a report containing the information outlined in KMC 14.23.030(5)(d) through (f). (b) For users subject to equivalent mass or concentration limits established by the City in accordance with procedures established in 40 CFR 403.6(c), this report shall contain a reasonable measure of the user's long-term production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the user's actual production during the appropriate sampling period. (3) Periodic Compliance Report. (a) Any user that is required to have an industrial waste discharge permit and performs self-monitoring shall submit to the City during the months of June and December, unless required on other dates or more frequently by the City, a report indicating the nature of the effluent over the previous reporting period. The frequency of monitoring shall be as prescribed within the industrial waste discharge permit. At a minimum, users shall sample their discharge at least twice per year. (b) The report shall include a record of the concentrations (and mass if specified in the wastewater discharge permit) of the pollutants listed in the wastewater discharge permit that were measured and a record of all flow measurements (average and maximum) taken at the designated sampling locations and shall also include any additional information required by this chapter or the wastewater discharge permit. Production data shall be reported if required by the wastewater discharge permit. (c) Both daily maximum and average concentration (or mass, where required) shall be reported. If a user sampled and analyzed more frequently than what was required by the City or by this chapter, using methodologies in 40 CFR Part 136, it must submit all results of sampling and analysis of the discharge during the reporting period. (d) Any user subject to equivalent mass or concentration limits established by the City or by unit production limits specified in the applicable categorical standards shall report production data as outlined in subsection (2)(b) of this section. (e) If the City calculated limits to factor out dilution flows or nonregulated flows, the user will be responsible for providing flows from the regulated process flows, dilution flows and nonregulated flows. (f) Flows shall be reported on the basis of actual measurement; provided, however, that the City may accept reports of average and maximum flows estimated by verifiable techniques if the City determines that an actual measurement is not feasible. (g) Discharges sampled shall be representative of the user's daily operations and samples shall be taken in accordance with the requirements specified in KMC 14.23.050. (h) The City may require reporting by users that are not required to have an industrial wastewater discharge permit if information or data is needed to establish a sewer charge, determine the treatability of the effluent or determine any other factor which is related to the operation and maintenance of the sewer system. (i) The City may require self-monitoring by the user or, if requested by the user, may agree to perform the periodic compliance monitoring needed to prepare the periodic compliance report required under this section. If the City agrees to perform such periodic compliance monitoring, it may charge the user for such monitoring, based upon the costs incurred by the City for the sampling and analyses. Any such charges shall be added to the normal sewer charge and shall be payable as part of the sewer bills. The City is under no obligation to perform periodic compliance monitoring for a user. (4) Compliance Schedule for Meeting Applicable Pretreatment Standards. (a) The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.). (b) No increment referred to in subsection (4)(a) of this section shall exceed nine months. (c) Not later than 14 days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the City including, at a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay and the steps being taken by the user to return the construction to the schedule established. In no event shall more than nine months elapse between such progress reports. (5) Notification of Significant Production Change. Any user operating under a wastewater discharge permit incorporating equivalent mass or concentration limits shall notify the City within two business days after the user has a reasonable basis to know that the production level will significantly change within the next calendar month. Any user not providing a notice of such anticipated change will be required to comply with the existing limits contained in its wastewater discharge permit. (6) Hazardous Waste Notification. (a) Any industrial user shall notify the City, in writing, of any discharge into the POTW of a substance which, if otherwise disposed of, would be hazardous waste under 40 CFR Part 261. Such notification to the City shall be made within the appropriate time frames specified in subsection (7) or (9) of this section, whichever is shorter. The notification requirement in this section does not apply to pollutants already reported under the self-monitoring requirements as specified in subsection (1), (2) or (3) of this section. Such notification must include: (i) The name of the hazardous waste as set forth at 40 CFR Part 261; (ii) The EPA hazardous waste number; (iii) The type of discharge (continuous, batch, or other); (iv) An identification of the hazardous constituents contained in the wastes; (v) An estimation of the mass and concentration of such constituents in the wastestream discharged during that calendar month; (vi) An estimation of the mass of constituents in the wastestream expected to be discharged during the following 12 months; (vii) Certification that the industrial user has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical; and (viii) Signatory certification as required by KMC 14.23.030(6). (b) Any industrial user shall notify the EPA Regional Waste Management Division Director, and state hazardous waste authorities, in writing, of the discharge into the POTW of a substance which, if otherwise disposed of, would be hazardous waste under 40 CFR Part 261 and meets the reporting criteria specified at 40 CFR 403.12(p). Notification to the Washington State Department of Ecology and EPA is the responsibility of the industrial user and shall be made as required under 40 CFR 403.12(p). The industrial user shall copy the City on all notifications made to the state and EPA. (c) In the case of any new regulation under Section 3001 of the Resource Conservation and Recovery Act (RCRA) identifying additional characteristics of hazardous waste or listing any additional substance as hazardous waste, the industrial user must notify the City, the EPA Regional Waste Management Waste Division Director, and Washington State Department of Ecology hazardous waste authorities of the discharge of such substance within 90 days of the effective date of such regulations. (d) This provision does not create a right to discharge any substance not otherwise allowed to be discharged by this chapter, a permit issued hereunder, or any applicable federal or state law. (7) Notice of Potential Problems, Including Accidental Spills, Slug Loadings. Any user shall notify the City immediately of all discharges that could cause problems to the POTW, including any slug loadings, as defined in KMC 14.23.010(3). The notification shall include the concentration and volume and corrective action. Steps being taken to reduce any adverse impact should also be noted during the notification. Any user who discharges a slug (or slugs) of pollutants shall be liable for any expense, loss, or damage to the POTW, in addition to the amount of any fines imposed on the City under state or federal law. (8) Noncompliance Reporting. If sampling performed by a user indicates a violation, the user shall notify the City within 24 hours of becoming aware of the violation. The user shall also repeat the sampling within five days and submit the results of the repeat analysis to the City within 30 days after becoming aware of the violation. (Where the City has the sampling and analysis in lieu of the industrial user, the City must perform the repeat sampling and analysis unless it notifies the user of the violation and requires the user to perform the repeat analysis.) Resampling is not required if: (a) The City performs sampling at the user at a frequency of at least once per month; or (b) The City performs sampling at the user between the time when the user performs its initial sampling and the time when the user receives the results of this sampling. (9) Notification of Changed Discharge. All users shall promptly notify the City in advance of any substantial change in the volume or character of pollutants in their discharge, including significant regulated or manufacturing process changes, pretreatment modifications and the listed or characteristic hazardous wastes for which the user has submitted initial notification under 40 CFR 403.12(p). (10) Reports from Unpermitted Users. All users not required to obtain a wastewater discharge permit shall provide appropriate reports to the City as the Public Works Director may require. (11) Recordkeeping. Users subject to the reporting requirements of this chapter shall retain and make available for inspection and copying all records of information obtained pursuant to any monitoring activities required by this chapter and any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements. Records shall include the date, exact place, method and time of sampling and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses including documentation associated with BMPs. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the user or POTW, or where the user has been specifically notified of a longer retention period by the Public Works Director.

(Ord. 5420 Sec. 1(part), 2012)

Ask a question about Kennewick law

Corpus searches the Kennewick sections it holds and shows the ones that match, with their citations. Free, no sign-in.