18.68.120: - Shoreline Modifications.
(1) Applicability. The provisions of this section apply to all shoreline modifications within shoreline jurisdiction. (2) Principles. The following are the objectives of the provisions of this section: (a) Shoreline modifications for the Clover Island High Intensity Environment shall be consistent with the Clover Island High Intensity Special Area Plan Standards (Appendix A-6-4) and shoreline stabilization standards established in Section 18.68.120(3)(a); (b) Structural shoreline modifications shall be allowed only where they are demonstrated to be necessary to support or protect an allowed structure, a legally existing shoreline use that is in danger of loss or substantial damage, or are necessary for reconfiguration of the shoreline for mitigation or enhancement purposes; (c) Shoreline modifications shall be allowed only when appropriate to the specific type of shoreline and environmental conditions for which they are proposed; (d) Shoreline modifications, individually and cumulatively, shall not result in a net loss of ecological functions; preference shall be given to shoreline modifications that have a lesser impact on ecological functions, and mitigation shall be required for identified adverse impacts resulting from shoreline modifications; (e) Where applicable, scientific and technical information shall be used in planning for shoreline modifications; (f) Restoration or enhancement of ecological functions shall be encouraged where feasible and appropriate, while accommodating permitted uses, and all feasible measures to protect ecological functions and ecosystem-wide processes shall be incorporated. For the Clover Island High Intensity Environment, enhancement shall be consistent with the Clover Island High Intensity Special Area Plan Standards (Appendix A-6) and provisions in applicable federal and state permits; and (g) Significant ecological impacts shall be mitigated as defined in this Chapter and according to the mitigation sequence in Appendix A-2. (3) Standards for Specific Shoreline Modifications. (a) Shoreline Stabilization. (i) Shoreline stabilization measures include the following: (A) Structural ("stabilization structures") and nonstructural methods to address erosion impacts to property and dwellings, businesses, or structures caused by natural processes, such as current, flood, tides, wind, or wave action; and (B) Nonstructural methods including building setbacks, relocation of the structure to be protected, ground water management, planning and regulatory measures to avoid the need for structural stabilization. (ii) New development, including newly created parcels, shall be designed and located to prevent the need for future shoreline stabilization, based upon hydrological or geotechnical analysis. (iii) New development on steep slopes or bluffs shall be set back according to the requirements indicated in Appendix A-2 to ensure that shoreline stabilization is unlikely to be necessary during the life of the structure, as demonstrated by a geotechnical analysis. (iv) New development that would require shoreline stabilization which causes significant impacts to adjacent or down-current properties and shoreline areas is prohibited. (v) New structural stabilization measures shall not be allowed except when necessary as demonstrated in the following manner: (A) To protect existing primary structures, new or enlarged stabilization structures for an existing primary structure, including residences, shall not be allowed unless there is conclusive evidence documented by a geotechnical analysis that the structure is in danger of failing within three years from shoreline erosion caused by currents, or waves. Normal sloughing, or shoreline erosion itself, without a geotechnical analysis, is not demonstration of need. In order to demonstrate need, the geotechnical analysis shall evaluate on-site drainage issues and address drainage problems away from the shoreline edge before considering structural measures. The erosion control structure with appropriate mitigation shall not result in a net loss of ecological functions; (B) New stabilization structures in support of new non-water-dependent or water-dependent development shall be allowed when consistent with the Clover Island High Intensity Special Area Plan Standards (Appendix A-6) or when all of the following conditions apply: the erosion is not being caused by upland conditions such as the loss of vegetation and drainage; nonstructural measures such as placing the development further from the shoreline, planting vegetation, or installing on-site drainage improvements, are not feasible or sufficient; need is demonstrated by a geotechnical analysis that damage must be caused by natural processes such as currents, and waves; and the erosion control structure and appropriate mitigation will not result in a net loss of shoreline ecological functions; (C) New stabilization structures in support of projects for the restoration of ecological functions or hazardous substance remediation projects pursuant to Chapter 70.105D RCW shall be allowed when consistent with the Clover Island High Intensity Special Area Plan Standards (Appendix A-6) or when all of the following conditions apply: Nonstructural measures, planting vegetation, or installing on-site drainage improvements are not feasible or sufficient; and the erosion control structure and appropriate mitigation will not result in a net loss of shoreline ecological functions; (D) Shoreline stabilization shall be constructed to minimize damage to fish habitats and to maintain safe navigational movement. Biotechnical and soft methods shall be prioritized as the preferred method of bank stabilization, unless analysis demonstrates that such measures are infeasible. For the Clover Island High Intensity Environment shoreline stabilization below the OHWM to protect existing or planned upland water-dependent facilities specified in the plan or applicable federal and state permits shall be accompanied by habitat enhancement, including anchored brush piles or ballasted root wads or other specified measures. Open-piling construction is preferable in lieu of the solid type; (E) Bulkheads shall be designed to permit the passage of surface or ground water without causing ponding or saturation of retained soil or materials. Adequate toe protection (proper footings, a fine retention mesh, etc.) shall be provided to ensure bulkhead stability without relying on additional riprap; and (F) Bulkheads shall be designed to be of the minimum dimensions necessary. When a bulkhead is required at a public access site with planned water access, provision for safe access to the water shall be incorporated into its design. (vi) Replacement of existing stabilization structures shall be based on demonstrated need to protect uses or structures from erosion caused by currents, or waves: (A) The replacement structure shall be designed, located, sized and constructed to assure no net loss of ecological functions, and, if located in the Clover Island High Intensity Environment, to also achieve improved aquatic and riparian habitat function. (B) Waterward encroachment of a replacement structure shall be allowed for residences occupied prior to January 1, 1992; and then only if there are overriding safety or environmental concerns and then replacement structure shall abut the existing shoreline stabilization structure and must still comply with applicable federal and state permit provisions. (C) For Clover Island High Intensity Environment replacement structures must be consistent with the Clover Island High Intensity Special Area Plan Standards (Appendix A-6-4) and applicable federal and state permit provisions, including anchored brush piles or ballasted root wads and native riparian vegetation plantings and other specified measures, or for soft shoreline stabilization measures that provide restoration of ecological functions. (D) Soft shoreline stabilization measures that provide restoration or enhancement of shoreline ecological functions may be permitted waterward of the ordinary high water mark. Additionally, if the development is located in the Clover Island High Intensity Environment, the soft shoreline stabilization measures shall be consistent with the Clover Island High Intensity Special Area Plan Standards. (vii) Geotechnical reports prepared pursuant to this section that address the need to prevent potential damage to a structure shall address the necessity for shoreline stabilization by estimating time frames and rates of erosion and shall report on the urgency associated with the specific situation. As a general matter, hard armoring solutions shall not be authorized except when a report confirms that there is a significant possibility that such a structure will be damaged within three years as a result of shoreline erosion in the absence of such hard armoring measures, or where waiting until the need is that immediate, would foreclose the opportunity to use measures that avoid impacts on ecological functions. Where the geotechnical report confirms a need to prevent potential damage to a structure, but the need is not as immediate as three years, that report may still be used to justify more immediate authorization to protect against erosion using soft measures. (viii) Shoreline stabilization structures shall be limited to the minimum size necessary. Soft approaches shall be used unless demonstrated not to be sufficient to protect structures, dwellings, and businesses. Where feasible, ecological restoration or enhancement, and public access improvements shall be incorporated into the project. Public access shall be required as part of publicly financed shoreline erosion control measures except where such access is determined to be infeasible because of incompatible uses, safety, security, or harm to ecological functions. For the Clover Island High Intensity Environment, enhancements shall be consistent with the Clover Island High Intensity Special Area Plan Standards (Appendix A-6) and applicable federal and state permit provisions, including anchored brush piles or ballasted root wads and native riparian vegetation plantings, and other specified measures, applicable federal and state permit provisions, including anchored brush piles or ballasted root wads and native riparian vegetation plantings and other specified measures. (ix) For conditions of erosion or mass wasting due to upland conditions, projects must be consistent with standards set out in KMC 18.68.110(2)(b)(iii)(C). (x) Riprapping and other bank stabilization measures shall be located, designed and constructed to avoid the need for channelization of streams and to protect, as feasible, the natural character of the streamway. (xi) Where floodprotection measures such as levees are planned, they shall be placed landward of the streamway, including associated swamps and marshes and other wetlands directly inter-related and inter-dependent with the stream proper. (xii) Where shoreline stabilization is allowed, it shall consist of "soft," flexible, and/or natural materials or other bioengineered approaches unless a geotechnical analysis demonstrates that such measures are infeasible. (xiii) Publicly financed or subsidized shoreline erosion control measures shall not restrict appropriate public access to the shoreline, except where such access is determined to be infeasible because of incompatible uses, safety, security, or harm to ecological functions. Where feasible, ecological restoration and public access improvements shall be incorporated into the project. (b) Piers, Viewing Platforms, and Docks. (i) The following standards shall apply to new piers, viewing platforms and docks: (A) New piers, viewing platforms, and docks are allowed in the Clover Island High Intensity Environment consistent with the Clover Island High Intensity Special Area Plan Standards (Appendix A-6) to provide for existing and future water-dependent uses and subject to approval and conditions of federal and state permits addressing aquatic and riparian habitat, and consistent with the Shorelines Critical Areas Appendix A-2 requirements; (B) New piers, viewing platforms and docks are allowed for public and commercial purposes. Docks serving four or less residential units are prohibited; (C) New piers and docks are allowed only for water-dependent uses or public access; (D) New piers and docks are restricted to the minimum size necessary to serve a proposed water-dependent use (based upon a needs analysis provided by the Applicant). For Clover Island High Intensity environment, the minimum width for piers, docks and ramps shall be six feet and the maximum width shall be 12 feet; (E) New piers and docks are permitted only when specific need is demonstrated; and (F) Water-related and water-enjoyment uses may be allowed as part of mixed-use development on over-water structures where they are clearly auxiliary to, and in support of, water-dependent uses, provided the minimum size requirement needed to meet the water-dependent use is not violated (WAC 173-26-231(3)(b)). (ii) The use of floating docks shall be encouraged in those areas where scenic values are high and where conflicts with recreational boaters and fishermen will not be created. (iii) Open-pile piers shall be encouraged where shore trolling is important, where there is significant littoral drift and where scenic values will not be impaired. Piers and viewing platforms for the Clover Island High Intensity Environment shall be consistent with the Clover Island High Intensity Special Area Plan Standards and applicable federal and state construction standards and/or requirements. Pilings shall be permitted only when needed as a structural part of floating docks and to minimize the impact of local high winds on the structures. Pilings shall be structurally sound and cured prior to placement in the water. Creosote treated pilings are prohibited. Pilings employed in piers or any other structure shall have a minimum vertical clearance of two feet above the OHWM. The minimum number of pilings necessary shall be used in piers or viewing platforms. (iv) Priority shall be given to the use of public piers, viewing platforms and docks. Cooperative use of these facilities is encouraged. (v) New structures will be preferentially placed in developed areas to avoid degradation of habitat. (vi) Location, design and construction of all piers, viewing platforms and docks shall result in no net loss of ecological processes and functions, and avoid, minimize and mitigate for ecological impacts. Construction materials and light transmission standards must be consistent with applicable state and federal requirements, and be based upon the most current, accurate, and complete scientific and technical information available. Piers, viewing platforms, and docks proposed in the Clover Island High Intensity Environment shall be consistent with the Clover Island High Intensity Special Area Plan Standards and applicable federal and state construction standards and/or requirements and other specified measures, including the following: (A) New overwater structures must not be located on or within 50 feet of existing native aquatic vegetation; (B) New overwater structures must be located in water sufficiently deep to prevent the structure from grounding out at the lowest low water; (C) New pier, ramp or dock grating surfaces must provide for a 40-percent minimum open area; (D) Flotation material must be encapsulated with a shell that prevents breakup or loss of flotation material, and cannot be located where it impedes fish passage; (E) Replacement of existing covered boat facilities (boat garages, covered moorage) shall be composed of clear translucent materials that have a minimum 25 percent light transmittance in either the roof material or exposed wall; and (F) Night lighting must be oriented to minimize illumination of surrounding waters. (vii) Storage of fuel, oils and other toxic materials is prohibited on docks and piers except in portable containers that are provided with secondary containment. (c) Fill. (i) Location, design and construction of shoreline fills or cuts shall protect existing ecological values or natural resources and ensure that significant alteration of local currents will not occur nor create a hazard to adjacent life, property, and natural resources. Shoreline fills shall be avoided in critical areas or shoreline buffers, except for habitat enhancement as provided for in the Clover Island High Intensity Special Area Plan Standards, and applicable federal and state permit provisions including native riparian vegetation plantings and other specified measures. When unavoidable, or buffers are not involved, they should be minimized, and designed and located so that there will be no significant damage to and no net loss of existing ecological functions; ecosystem-wide processes and natural resources shall be protected. (ii) Fills waterward of the ordinary high water mark shall be allowed by Substantial Development Permit in the Clover Island High Intensity Environment for ecological enhancement as provided for in the Clover Island High Intensity Special Area Plan Standards and applicable federal and state permit provisions, or by Conditional Use Permit when necessary to support the following uses: (A) Water-dependent uses; (B) Public access; (C) Cleanup and disposal of contaminated sediments as part of an intra-agency environmental cleanup plan; (D) Disposal of dredged material considered suitable under, and conducted in accordance with, the Dredged Material Management Program of the Department of Natural Resources; (E) Expansion or alteration of transportation facilities of statewide significance currently located on the shoreline and that demonstrate that alternatives to fill are not feasible; (F) A mitigation action; (G) Environmental restoration or enhancement; and (H) Beach nourishment or enhancement. (iii) All perimeters of fills shall be provided with vegetation, bioengineered approaches or other mechanisms for erosion prevention. (iv) Fill materials shall be of such quality that they will not adversely affect water quality. (d) Breakwaters, Jetties, Weirs, and Groins. (i) Structures shall be designed, located and constructed with appropriate mitigation in such a way as to assure no net loss of ecological functions. The effect on public access and aesthetic values of the shoreline shall be considered in the design and location of structures. (ii) Structures waterward of the ordinary high water mark shall be allowed only for water-dependent uses, public access, shoreline stabilization, or other specific public purpose. (iii) A shoreline Conditional Use Permit shall be required for all structures except shoreline protection/restoration/enhancement projects and only allowed when demonstrated that no feasible alternative is available. Mitigation sequencing shall be provided to ensure no net loss of shoreline ecological functions and processes and shall be demonstrated by submittal of Mitigation Management Plan. (e) Dredging and Dredge Material Disposal. (i) Dredging and dredge material disposal shall be done in a manner which avoids or otherwise minimizes significant ecological impacts. Impacts which cannot be avoided shall be mitigated. (ii) New development siting and design shall avoid the need for new and maintenance dredging. (iii) Dredging for the purposes of establishing, expanding, or relocating or reconfiguring navigation channels and basins shall be allowed where necessary to assure safe and efficient accommodation of existing navigational uses. In such cases, significant ecological impacts shall be minimized and mitigation provided for any unavoidable impacts. (iv) Maintenance dredging of established navigation channels and basins is restricted to maintaining previously dredged and/or existing authorized location, depth, and width. (v) Dredging for fill materials shall not be allowed, except when the material is necessary for the restoration of ecological functions, and is associated with a MTCA or CERCLA habitat restoration project or is approved through a shoreline Conditional Use Permit for use in any other significant habitat enhancement project. When allowed, fill material must be placed waterward of the ordinary high water mark. (vi) Dredging of materials suitable for shoreline restoration or other activities to benefit shoreline resources may be allowed, provided the activity is done in a manner which avoids or otherwise minimizes ecological impacts. (vii) Disposal of dredge material on shorelands, wetlands or within a channel migration zone shall be discouraged and is allowed only by shoreline Conditional Use Permit. (f) Signage. (i) Off-premises signs shall not be permitted on the shorelines. (ii) Signs shall be mounted flush to the buildings they represent, and shall not extend above the roofline. (iii) Flashing, moving, or animating signs shall not be permitted, unless required by law for air and water navigation. (iv) Each use shall be permitted one square foot of sign for each five feet of the building frontage. (v) Vistas and viewpoints shall not be degraded and visual access to the water from such vistas shall not be impaired by the placement of signs. All signs shall be located and designed to minimize interference with view corridors and visual access to the shoreline. (vi) When feasible, signs shall be constructed against existing buildings to minimize visual obstructions of the shoreline and water bodies. (vii) No signs shall be placed on trees, other natural features, or public utility poles. (g) Shoreline Habitat and Natural Systems Restoration and Enhancement Projects. (i) Shoreline habitat and natural systems enhancement projects, including those activities proposed and conducted specifically for the purpose of establishing, restoring, or enhancing habitat for listed species in shorelines, are encouraged, provided such projects' primary purpose is clearly enhancing or restoring the shoreline natural character and ecological functions. The project shall address legitimate enhancement or restoration needs and priorities and facilitate implementation of the restoration plan (Appendix A-4) developed pursuant to WAC 173-26-201(2)(f) and the Clover Island High Intensity Special Area Plan Standards (Appendix A-6) and with applicable federal and state permit provisions. (ii) For the Clover Island High Intensity Environment, implementation of the aquatic, nearshore and riparian habitat enhancement plan, as provided in the Clover Island High Intensity Special Area Plan Standards shall accompany new development. Accompany means within 12 months of completion of a new development project, enhance the shoreline next to the new development consistent with the Clover Island High Intensity Special Area Plan Standards (Appendix A-6-4). Enhancement work will be conducted within the work window specified in applicable federal and state permits (typically late fall/winter time period).
(Ord. 5927, Sec. 5, 2021; Ord. 5281 Sec. 1, 2009)
Ask a question about Kennewick law
Corpus searches the Kennewick sections it holds and shows the ones that match, with their citations. Free, no sign-in.