For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18.68.130 — Shoreline Uses

Code of Ordinances of the City of Kennewick, Washington (Codified through Ordinance No. 26-6253, enacted September 15, 2026 (Supp. No. 19)) · Kennewick Municipal Code § 18.68.130

Corpus is an independent public-information project, not the official City of Kennewick website. Stable reference: corpuslaw.us/code/001d4344-34c8-4f58-ac0b-ea41469a032f

18.68.130: - Shoreline Uses.

(1) Applicability. The provisions of this section apply to specific common uses and types of development to the extent they occur within shoreline jurisdiction. All uses and development must be consistent with the Shoreline Master Program. (2) General Use Provisions. (a) Principles. The following are objectives of the provisions of this section: (i) Uses that are consistent with the control of pollution and prevention of damage to the natural environment, or are unique to or dependent upon uses of the State's shoreline areas, are preferred. Preference shall be given first to water-dependent uses, second to water-related uses and third to water-enjoyment uses; (ii) The location, design and construction of new development in shoreline areas shall be done in a way that protects the public's health, safety, and welfare, as well as the land and its vegetation and wildlife, and protects property rights while implementing the policies of the Shoreline Management Act; and (iii) Permitted uses shall result in no net loss of ecological functions associated with the shorelines. (b) Conditional Uses. (i) Purpose. The purpose of this section is to define the types of uses and development that require a shoreline Conditional Use Permit pursuant to RCW 90.58.100(5). Conditional Use Permits may be required for a variety of purposes, including: (A) To effectively address unanticipated uses that are not classified in this Shoreline Master Program as described in WAC 173-27-030; (B) To address cumulative impacts; and (C) To provide the opportunity to require specially tailored environmental analysis or design criteria for types of use or development that may otherwise be inconsistent with a specific environment designation within this Shoreline Master Program or with the Shoreline Management Act policies. (ii) Applicability. The following types of uses and development may require a Conditional Use Permit (see Section 18.68.240 for application process): (A) Uses and development that may or will significantly impair or alter the public's use of the water areas of the State; (B) Uses and development which, by their intrinsic nature, may have a significant ecological impact on shoreline ecological functions or shoreline resources depending on location, design, and site conditions; (C) Specific shoreline uses identified in this Chapter as requiring a Conditional Use Permit; and (D) The height limit for all uses shall be 35 feet in the Aquatic and Urban Conservancy Environments, and for the Clover Island High Intensity Environment, the heights provided in the Clover Island High Intensity Special Area Plan Standards (Appendix A-6). Proposed Uses may be able to exceed this limit through the Conditional Use process as described in Section 18.68.240. (c) Prohibitions. (i) Aquaculture activities are prohibited in shorelands. (ii) Agriculture activities are prohibited in shorelands. (d) Nonconforming Development or Nonconforming Structures. "Nonconforming development" or "nonconforming structure" means an existing structure that was lawfully constructed at the time it was built but is no longer fully consistent with present regulations such as setbacks, buffers or yards; area; bulk; height or density standards due to subsequent changes to the master program. When such development or structure exists, the following standards shall apply: (i) Nonconforming development may be continued and maintained, repaired, renovated, or structurally altered, provided that it is not enlarged, intensified, increased, or altered in any way which increases its nonconformity, except to enhance views from upland areas including streets, to enhance public access, or to contribute to protection, enhancement, restoration, or rehabilitation of or mitigation for impacts to critical areas or their buffers; (ii) A nonconforming development which is moved any distance must be brought as closely as possible into conformance with the Shoreline Master Program and the Act; (iii) If a nonconforming development is damaged to an extent not exceeding 75 percent of the replacement cost of the original development, it may be reconstructed to those configurations existing immediately prior to the time the development was damaged, provided that application is made for the permits necessary to restore the development within six months of the date the damage occurred, all permits are obtained and the restoration is completed within two years of permit issuance; (iv) Structures that were legally established and are used for a conforming use but which are nonconforming with regard to setbacks, buffers or yards, area, bulk, height or density may be maintained and repaired and may be enlarged or expanded provided that said enlargement does not increase the extent of nonconformity by further encroaching upon, or extending into, areas where construction or use would not be allowed for new development or uses. (e) Nonconforming Uses. "Nonconforming use" means an existing shoreline use that was lawfully established prior to the effective date of the act or the applicable master program, but which does not conform to present use regulations due to subsequent changes to the master program. When such use exists, the following standards shall apply: (i) If a nonconforming use is discontinued for 12 consecutive months or for 12 months during any two-year period, the nonconforming rights shall expire and any subsequent use shall be conforming. A use authorized pursuant to subsection (6) of this section shall be considered a conforming use for purposes of this section; (ii) A structure which is being or has been used for a nonconforming use may be used for a different nonconforming use only upon the approval of a Conditional Use Permit. A Conditional Use Permit may be approved only upon a finding that: (A) No reasonable alternative conforming use is practical; (B) The proposed use will be at least as consistent with the policies and provisions of the Act and the Shoreline Master Program and as compatible with the uses in the area as the preexisting use; and (C) In addition such conditions may be attached to the permit as are deemed necessary to assure compliance with the above findings, the requirements of the Shoreline Master Program and the Shoreline Management Act and to assure that the use will not become a nuisance or a hazard. (iii) Uses and developments that were legally established and are nonconforming with regard to the use regulations of the Shoreline Master Program may continue as legal nonconforming uses. Such uses shall not be enlarged or expanded. (iv) A use which is listed as a conditional use but which existed prior to adoption of the Shoreline Master Program or any relevant amendment and for which a Conditional Use Permit has not been obtained shall be considered a nonconforming use. A use which is listed as a conditional use but which existed prior to the applicability of the Shoreline Master Program to the site and for which a Conditional Use Permit has not been obtained shall be considered a nonconforming use. (f) Nonconforming Lots. "Nonconforming lot" means a lot that met dimensional requirements of the applicable master program at the time of its establishment but now contains less than the required width, depth or area due to subsequent changes to the master program. When such lots exist, the following standards shall apply: (i) An undeveloped lot, tract, parcel, site, or division of land located landward of the ordinary high water mark which was established in accordance with City zoning requirements prior to the effective date of the Act and this Shoreline Master Program but which does not conform to the present lot size standards may be developed if permitted by other City land use regulations and so long as such development conforms to all other requirements of the applicable Shoreline Master Program and the Act; (g) Shoreline Uses Table. (i) The shoreline uses table identifies the level of approval required for the specific shoreline uses described in this Chapter. (ii) Buffers shall be maintained in accordance with Critical Areas Appendix A-2, Chapter 6 or any other Chapters of this Appendix A-2 as appropriate within shoreline jurisdiction. (iii) Building setbacks are measured landward from the edges of all critical area buffers or from the edges of all critical areas, if no buffers are required according to Appendix A-2, Section 1.220. (iv) To provide flexibility in the application of use regulations in a manner consistent with RCW 90.58.020, a Conditional Use Permit may be provided with special conditions, as applicable (see Sections 18.68.130(2)(b) and 18.68.240) (v) Bulk, dimensional and performance standard exceptions are made through the variance process. (vi) Reasonable Use. Where project proponents would seek a "Reasonable Use" exception to their proposal, they shall seek exception process and relief through the conditional use or variance process. Clover Island High Intensity | Urban Conservancy | Aquatic Permit | Permit | Permit Boating Facilities Water-dependent | SDP | SDP | SDP Water-oriented | SDP | CUP | Prohibited Commercial Water-dependent | SDP | SDP | SDP Water-related and water-enjoyment | SDP | SDP | CUP Non-water-oriented | SDP | CUP | Prohibited Industrial Water-dependent | Prohibited | Prohibited in ED map Sections A—D/CUP Section E | Prohibited in ED map Sections A—D/CUP Section E Water-related and water-enjoyment | Prohibited | CUP only Section E | CUP Non-water-oriented | Prohibited | CUP only Section E | Prohibited In-stream Structures | SDP for uses that improve ecological functions CUP for all other uses | CUP | CUP Historic, Educational and Recreational Water-dependent | SDP | SDP | SDP Water-related and water-enjoyment | SDP | SDP | CUP Water-enjoyment - walkways and trails | SDP | SDP | CUP Non-water-oriented(5) | SDP | CUP | Prohibited Residential Development Multi-Family Residential Development | SDP | Prohibited | Prohibited Single-Family and Duplex | Prohibited | Prohibited | Prohibited Transportation Motorized (includes public transit) | SDP | SDP | CUP Capital Facilities and Utilities All Utilities; Water Supply Utilities; Signage | SDP | SDP | CUP Fill | SDP | SDP | CUP Dredging Disposal of Dredge Material in Shoreline Jurisdiction | CUP | CUP | CUP 1. SDP = Substantial Development Permit 2. CUP = Conditional Use Permit. Uses not specifically identified may be considered through the CUP application process (see Section 18.68.240). (3) Standards for Specific Shoreline Uses. Permit process, height limit, and setback requirements for uses in each shoreline environment designation shall be in accordance with the shoreline use table in Section 18.68.130 and as stated in the following sections: (a) Boating Facilities and Marinas. For the purposes of this Chapter, "boating facilities" includes marinas, boat storage and launch ramp development, and accessory uses. (i) For the water dependent portion of the boating facilities, Substantial Development Permits shall be required in the Clover Island High Intensity, Urban Conservancy and Aquatic Environments. (ii) Non-water-oriented portions of boating facilities shall require Substantial Development Permits in the Clover Island High Intensity Environment consistent with the Clover Island High Intensity Special Area Plan Standards, and Conditional Use Permits in the Urban Conservancy Environment. Such uses shall be prohibited in the Aquatic Environment. (iii) Water-dependant uses, as defined by this Shoreline Master Program, may be located within a habitat conservation area or buffer when the applicant or property owner can demonstrate compliance with Appendix A-2, Chapters 1—6. (iv) Boating facilities shall be located only at sites with suitable environmental conditions, shoreline configuration, access, and neighboring uses. Such facilities shall meet health, safety, and welfare requirements. All boating facilities shall be permitted and in compliance with all local, state and federal requirements. (v) Location, design and construction of new boating facilities shall avoid, when feasible, or otherwise mitigate aesthetic impacts to the shoreline that are derived from natural or cultural features, such as shoreforms, vegetative cover, and historic sites/structures. (vi) Boating facilities shall not conflict with existing or planned public access opportunities. Public access is required for new marinas, particularly where water-enjoyment uses are associated with the marina, in accordance with WAC 173-26-221(4) and KMC 18.68.110(2)(e). (vii) Boaters are prohibited from living in their vessels (live-aboard). Non-motorized floating homes shall not be permitted. (viii) Boating facilities, and associated and accessory uses shall not be allowed if they result in a net loss of shoreline ecological functions. (ix) Extended moorage on waters of the State without a lease or permission from appropriate authorities is prohibited, and any significant impacts to navigation and public access shall be mitigated. (x) Special attention shall be given to the design and development of operational procedures for fuel handling and storage in order to minimize accidental spillage and provide satisfactory means for handling any spillage that does occur. A "maintenance and spill prevention and control plan" shall be required to be submitted by the applicant in order to get a shoreline permit. (xi) In planning for propelled watercraft, assurances shall be made that waste disposal practices meet local and State health regulations, that the crafts are not located over highly productive fish food areas, and that the crafts are located to be compatible with the intent of the designated environments. (xii) Marinas for float plane moorage shall be developed in accordance with any guidelines developed by the Washington State Department of Fisheries, Federal Aviation Administration, and U.S. Coast Guard. (b) Commercial Uses. (i) The location, design and construction of commercial uses and redevelopment shall achieve no net loss of shoreline ecological functions. For the Clover Island High Intensity Environment, the proposal shall enhance shoreline ecological functions within 12 months of completion of a new development project, consistent with the Clover Island High Intensity Special Area Plan Standards. Enhancement work will be conducted within the work window specified in applicable federal and state permits (typically late fall/winter time period). (ii) Preference shall be given first to water dependent commercial uses, second to water-related uses, and third to water-enjoyment uses. (iii) All commercial uses shall provide public access. Refer to WAC 173-26-221(4) and KMC 18.68.110(2)(e) for public access provisions. (iv) In areas designated for commercial use, non-water-oriented commercial development may be allowed if the site is physically separated from the shoreline by another property or public right-of-way. Non-water-dependent commercial uses should not be allowed over water except in existing structures or in the limited instances where they are auxiliary to and necessary in support of water-dependent uses. Commercial development shall not result in a net loss of shoreline ecological functions or have significant adverse impact to other shoreline uses, resources and values provided for in RCW 90.58.020 such as navigation, recreation, and public access. Non-water-oriented commercial uses shall not be allowed unless: (A) The use is part of a mixed-use project that includes water-dependent uses and provides a significant public benefit with respect to the Shoreline Management Act's objectives such as providing public access and ecological restoration and complies with other applicable use standard(s) as established in this Chapter; or (B) Navigability is severely limited at the proposed site; and the commercial use provides a significant public benefit with respect to the Shoreline Management Act's objectives such as providing public access and ecological restoration. For water-dependent commercial uses, Substantial Development Permits shall be required in the Clover Island High Intensity, Urban Conservancy and Aquatic Environments. (v) Non-water-oriented commercial uses shall require Substantial Development Permits in the Clover Island High Intensity Environment consistent with the Clover Island High Intensity Special Area Plan Standards, and Conditional Use Permits for deviations to these standards and in the Urban Conservancy Environment. Non-water-oriented projects shall be consistent with subsections (i) and (iv) above. Non-water-oriented projects shall be prohibited in the Aquatic Environment. (vi) A Substantial Development Permit shall be required for water-related and water-enjoyment commercial uses in the Urban Conservancy. A Conditional Use Permit shall be required for uses in the Aquatic Environment, consistent with the following: (A) Pier and dock construction shall be restricted to the minimum size necessary to meet the needs of the proposed water-dependent use. Water-related and water-enjoyment uses may be allowed as part of mixed-use development on over-water structures where they are clearly auxiliary to, and in support of, water-dependent uses and consistent with minimum size requirements needed to meet the water-dependent use (WAC 173-26); and (B) As Part of Mixed-Use, mixed use developments shall comply with other applicable use standard(s) as established in this Chapter. (vii) Water-dependent uses, as defined by this Shoreline Master Program, may be located within a habitat conservation area or buffer when the applicant or property owner can demonstrate compliance with Appendix A-2, Chapters 1—6. Water-related, water enjoyment, and non-water oriented commercial uses shall be required to comply with the critical area regulations, buffer and setback regulations as identified in Appendix A-2. (viii) Where commercial use is proposed for location on land in public ownership, public access is required. (c) Industrial Uses. (i) Priority shall be given to water-dependent industries which require use of navigable water, and then to other water-oriented industrial uses, over other industrial uses. (ii) New non-water-oriented industrial development shall be prohibited on shorelines except when: (A) The use is part of a mixed-use project that includes water-dependent uses and provides a significant public benefit with respect to the Shoreline Management Act's objectives such as providing public access and ecological restoration or enhancement; or (B) Navigability is severely limited at the proposed site; and the industrial use provides a significant public benefit with respect to the Shoreline Management Act's objectives such as providing public access and ecological restoration or enhancement; or (C) In areas designated for industrial use, non-water-oriented industrial uses may be allowed if the site is physically separated from the shoreline by another property, public right-of-way, or a levee system maintained by or maintained under license from the federal government, the State, or a political subdivision of the State. (iii) Industrial facilities are prohibited in the Clover Island High Intensity Environment. Industrial facilities are prohibited in the Urban Conservancy and Aquatic Environments, except reconstructed, replaced or new facilities in shoreline segment E (Exhibit 1) where they may be allowed through a Conditional Use Permit. Only the dock/port portion of a facility may be located in the Aquatic Environment. (iv) The height limit for industrial uses shall be 35 feet. Industrial facilities may be able to exceed this limit through the Conditional Use process as described in Sections 18.68.240 and 18.68.110(2)(e) of this Chapter. (v) Water-dependent uses, as defined by this Shoreline Master Program, may be located within a habitat conservation area or buffer when the applicant or property owner can demonstrate compliance with critical areas provisions (Appendix A-2). (vi) The design, location, and construction of industrial uses shall include appropriate mitigation, as necessary, to assure no net loss of ecological functions. (vii) Applicants for industrial uses shall consider incorporating public access as mitigation for impacts to shoreline resources and values unless public access cannot be provided in a manner that does not result in significant interference with operations or hazards to life or property, as provided in WAC 173-26-221(4). Where a proposed industrial use is on publically owned land, public access shall be required. (viii) Industrial development and redevelopment will be encouraged to provide environmental cleanup and restoration of the shoreline area as part of the development, as applicable. (ix) Industrial port facilities will be designed to permit viewing of shoreline areas from view-points, waterfront restaurants, and similar public facilities which will not interfere with operations or endanger public health and safety. (x) The cooperative use of pre-existing docks parking, cargo handling, and water-dependent storage facilities is strongly encouraged in waterfront industrial areas. New additional parking facilities shall be located landward of the pre-existing buildings and development. (d) In-stream Structures. For the purposes of this Chapter, "In-stream structure" means a structure placed by humans within a stream or river waterward of the ordinary high water mark that either causes or has the potential to cause water impoundment or the diversion, obstruction, or modification of water flow. In-stream structures may include those for hydroelectric generation, irrigation, water supply, flood control, transportation, utility service transmission, fish habitat enhancement, or other purpose. In-stream structures shall provide for the protection and preservation, of ecosystem-wide processes, ecological functions, and cultural resources, including, but not limited to, fish and fish passage, wildlife, and water resources, critical areas, hydrogeological processes, and natural scenic vistas. The location and planning of in-stream structures shall give due consideration to the full range of public interests, watershed functions and processes, and environmental concerns, with special emphasis on protecting and restoring or enhancing priority habitats and species. (i) Substantial Development Permits shall be required in the Clover Island High Intensity Environment consistent with the Clover Island High Intensity Special Area Plan Standards. (ii) Conditional Use Permits shall be required for deviations to the Clover Island High Intensity Special Area Plan Standards and in the Urban Conservancy and Aquatic Environments. (iii) In-stream structures shall be sited and designed consistent with appropriate engineering principles, including guidelines of the Natural Resource Conservation Service and the U.S. Army Corps of Engineers and the City of Kennewick Flood Damage Protection Code 18.93 and this Shoreline Master Program. (iv) Non-structural and non-regulatory methods to protect, enhance and restore shoreline ecological functions and processes and other shoreline resources shall be encouraged as an alternative to structural flood control works and in-stream structures. Nonregulatory and non-structural methods may include public facility and resource planning, land or easement acquisition, education, voluntary protection and enhancement projects, or incentive programs. (v) In-stream structures shall be constructed and maintained in a manner that does not degrade the quality of affected waters. The City may require reasonable conditions to achieve this objective such as setbacks, buffers, or storage basins. (vi) Natural in-stream features such as snags, uprooted trees or stumps shall be left in place unless it can be demonstrated that they are actually causing deleterious bank erosion or higher flood stages which directly threaten human life, property, or infrastructure. (vii) In-stream structures shall allow for normal ground water movement and surface runoff. (viii) In-stream structures shall preserve valuable recreation resources and aesthetic values, such as islands. (ix) No in-stream structure may be constructed without the developer having obtained all applicable federal, state, and local permits and approvals, including, but not limited to, an Hydraulic Project Approval (HPA) from the State Department of Fish and Wildlife. (e) Historic, Educational, and Recreational Uses. For the purposes of this Chapter, "historic, educational, and recreational uses" include commercial and public facilities designed and used to make such uses accessible to the public. (i) Shoreline recreational development shall be given priority and is primarily related to access to, enjoyment and use of the water and shorelines of the State. (ii) Historic, educational, and recreational uses are allowed in all environments. (iii) Water-dependent uses of the shoreline for historic, educational, and recreational uses are allowed with Substantial Development Permits in all environments. Water-related and water enjoyment uses will be allowed with Substantial Development Permits when consistent with the Clover Island High Intensity Special Area Plan Standards, and in the Urban Conservancy Environment, and by Conditional Use Permit in the Aquatic Environment. (iv) Water-dependent uses of the shoreline, as defined by this Shoreline Master Program, for historic, educational, and recreational uses that require no permanent structures may be located within a habitat conservation area or buffer when the applicant or property owner can demonstrate compliance with Appendix A-2. (v) Water-Oriented and Non-water-oriented projects, as part of a mixed-use project, including the Clover Island High Intensity Special Area Plan Standards, shall comply with setback and buffer standards established in Shoreline Master Program Critical Area Standards, Appendix A-2. Temporary water enjoyment structures with a 30-day or less time limit of placement (such as for boat races) may be permitted with a ten-foot shoreline setback within Clover Island High Intensity and Urban Conservancy Environment buffers. (vi) Walkways and trails provided that those pathways that are generally parallel to the perimeter of the wetland or shoreline may be located in the outer 25 percent of the buffer area. For the Clover Island High Intensity Environment, walkways/boardwalks can be located in the outer 50 percent of the buffer area if they are built on piling and provide mitigation as required in Shoreline Master Program Critical Area Standards, Appendix A-2. (vii) Trail width of ten feet maximum is allowed within the buffer area. Water dependent access is allowed within the buffer, consistent with Shoreline Master Program Critical Area Standards, Appendix A-2, and Americans with Disabilities Act (ADA) regulations. (viii) The Planning Official has the ability to increase the trail width or modify trail design on a case-by-case basis if: (A) The additional width of the trail is located outside the required buffer, and/or (B) There is an established need for compliance with ADA accessible trail regulation. In such cases, the trail shall be the minimum size necessary. (ix) The location, design and operation of public recreational facilities shall be conducted in a manner consistent with the purpose of the environment designation in which they are located and that assures no net loss of shoreline ecological functions of the shoreline. (x) Linkage of shoreline parks and public access points through the use of linear access is encouraged. (xi) To avoid wasteful use of the limited supply of recreational shoreland, parking areas shall be located inland away from the immediate edge of the water and recreational beaches. Access should be provided by walkways or other methods. (xii) Recreational developments should be of such variety as to consider the diversity of demands from groups in nearby population centers. The supply of recreation facilities should be directly proportional to the proximity of population and compatible with the environment designations. (xiii) Facilities for intensive recreational activities shall be provided where sewage disposal and vector control can be accomplished to meet public health standards without adversely altering the natural features attractive for recreational uses. (xiv) In locating proposed new open areas which use large quantities of fertilizers and pesticides in their turf maintenance programs, provisions must be made to prevent these chemicals from entering water. If this type of facility is approved on a shoreline location, provisions shall be made for protection of water areas from drainage and surface runoff. The Planning Official may require a critical areas analysis, stormwater management plan, park management plan, or golf/turf chemical management plan as part of the project permitting review. (f) Residential Development. (i) New multi-family residential uses are permitted as a non-water-oriented use within the Clover Island High Intensity Environment consistent with the Clover Island High Intensity Special Area Plan Standards. (ii) New multi-family residential developments are prohibited in Urban Conservancy and Aquatic Environments. (iii) Mixed-use residential development in the Clover Island High Intensity Environment shall require the same buffer limitations as part of its water-oriented or mixed use portion. (iv) The development and appropriate mitigation shall assure no net loss of shoreline ecological functions will result from new residential development. (v) New over-water residences, including floating homes, are prohibited within shoreline jurisdiction. (vi) The maximum density for multi-unit residential development shall not exceed 27 dwelling units per acre. (vii) Single-family and duplex residential developments are prohibited in all environment designations. (g) Transportation. (i) Substantial Development Permits shall be required for transportation facilities located in the Clover Island High Intensity and Urban Conservancy Environments. Conditional Use Permits shall be required for transportation facilities in the Aquatic Environment. (ii) Motorized transportation facilities shall comply with setback and buffer standards established in Shoreline Master Program Critical Area Standards, Appendix A-2. (iii) Proposed transportation and parking facilities shall be planned, located, and designed where routes shall have the least possible adverse effect on unique or fragile shoreline features, and with appropriate mitigation will not result in a net loss of shoreline ecological functions or adversely impact existing or planned water-dependent uses. (iv) Circulation system planning shall include systems for pedestrian, bicycle, and public transportation where appropriate. Circulation planning and projects should support existing and proposed shoreline uses that are consistent with this Chapter. (v) Parking facilities in shorelines are not a preferred use and shall be allowed only as necessary to support an authorized use. Environmental and visual impacts of parking facilities shall be minimized. (vi) Whenever feasible, major highways, freeways, and railways should be located away from shorelands, except in port and heavy industrial areas, so that shoreland roads may be reserved for slow-moving recreational traffic. (vii) Transportation and parking plans and projects shall be consistent with the public access policies, public access plan, and environmental protection provisions of this Chapter. (viii) Where feasible, transportation corridors should be located upland to reduce pressures for the use of waterfront sites. (h) Capital Facilities and Utilities. Definition: Utilities are services and facilities that produce, convey, store or process such things as power, natural gas, sewage, communications, oil and waste. Capital facilities include wastewater treatment plants, bridges, water reservoirs, electrical substations, and gas regulating stations. On-site utility features serving a primary use such as a water, sewer or gas line to a development are "accessory utilities" and shall be considered part of the use. (i) Substantial Development Permits shall be required for utilities within the Clover Island High Intensity and Urban Conservancy Environments. A Conditional Use Permit shall be required for utilities located in the Aquatic Environment. (ii) Utilities supporting water-dependent uses, as defined by this Shoreline Master Program, may be located within a habitat conservation area or buffer when the applicant or property owner can demonstrate compliance with Shoreline Master Program Critical Area Standards (Appendix A-2). Utilities shall also comply with setback and buffer standards established in Appendix A-2. (iii) The design, location, and construction of utility facilities with appropriate mitigation shall be conducted in such a manner as to assure no net loss of shoreline ecological functions, preserve the natural landscape and minimize conflicts with present and planned land and shoreline uses while meeting the needs of future populations in areas planned to accommodate growth. (iv) Utilities shall be located in existing rights-of-way and corridors whenever feasible. (v) Utility production and processing facilities, such as power plants and sewage treatment plants, or parts of those facilities that are non-water-oriented, such as pumping stations, are prohibited in shoreline jurisdiction, unless it can be demonstrated that no other feasible option is available. Stormwater outfall infrastructure is allowed. (vi) Expansions or upgrades of existing wastewater treatment facility outfalls shall be allowed. (vii) Transmission facilities for the conveyance of services, such as power lines, communication cables, and pipelines, shall be located outside of shoreline jurisdiction where feasible, and when necessarily located within the shoreline area shall with appropriate mitigation assure no net loss of shoreline ecological functions. (viii) Over-water utility crossings shall be allowed only when no feasible alternative exists. (ix) New utilities or the substantial expansion of existing utilities shall: (A) Be located underground or under water, if feasible; (B) Utilize low impact, low profile design and construction methods; and (C) Be consistent with all applicable federal, state and local regulations. (x) Maintenance and replacement of existing utilities shall be exempt from subsections (viii)(A) and (viii)(B) above. (xi) Transmission facilities for the conveyance of services, such as power lines, cables, and pipelines, shall be located outside of the shoreline area where feasible and when necessarily located within the shoreline area shall assure no net loss of shoreline ecological functions. (i) Fill Practices. (i) Substantial Development Permits shall be required for proposed fill projects within the Clover Island High Intensity and Urban Conservancy Environments. A Conditional Use Permit shall be required for proposed fill projects located in the Aquatic Environment. (ii) See Section 18.68.120(3)(c) for additional requirements. (j) Dredging and Disposal of Dredge Material Practices. (i) A Conditional Use Permit shall be required for proposed dredge and dredge material disposal projects located in the Clover Island High intensity, Urban Conservancy, and Aquatic Environments. (ii) See Section 18.68.120(3)(e) for additional requirements.

(Ord. 5927, Sec. 6, 2021; Ord. 5281 Sec. 1, 2009)

Ask a question about Kennewick law

Corpus searches the Kennewick sections it holds and shows the ones that match, with their citations. Free, no sign-in.