§ 11.06.560 — Location and timing of compensatory mitigation. Revised 8/26
Kent City Code (current through Ordinance 4547, passed August 18, 2026) · Kent City Code § 11.06.560
Corpus is an independent public-information project, not the official City of Kent website. Stable reference: corpuslaw.us/code/1847ea4e-32c3-473c-8949-937a09409e9f
11.06.560 Location and timing of compensatory mitigation. Revised 8/26
A. Where possible, mitigation required in this chapter shall be provided onsite and directly replace the impacted functions and values. Mitigation may be allowed offsite only when the director determines that onsite mitigation is not scientifically feasible or practical due to physical features of the property. The burden of proof shall be on the applicant to demonstrate that mitigation cannot be provided onsite. B. The director shall evaluate the following criteria when considering a proposal for offsite mitigation for wetlands, streams, buffers, and/or habitat: 1. No reasonable opportunities exist onsite, or opportunities onsite do not have a high likelihood of success based on a determination of the capability of the site to compensate for the impacts; 2. Onsite mitigation would require elimination of high-quality upland habitat; and 3. Offsite mitigation has a greater likelihood of providing equal or improved wetland functions compared to the altered wetland, stream, buffer, or habitat; 4. Offsite mitigation can be provided in the same drainage basin as the permitted activity on property owned, secured, or controlled by the applicant; 5. Mitigation sites shall be located within the city, unless otherwise approved by the director. C. In-kind mitigation shall be provided except when the applicant demonstrates, and the director concurs, that greater function and value can be achieved through out-of-kind mitigation. D. When wetland, aquatic resources, or habitat mitigation is permitted by these regulations onsite or offsite, the mitigation project shall have sufficient hydrologic connection to surface or groundwater to ensure successful mitigation or restoration. A natural hydrologic connection is preferential as compared to one which relies upon manmade features requiring routine maintenance. E. Any agreed-upon mitigation plan shall be completed prior to issuance of a building or construction permit, unless a phased or concurrent schedule that assures completion prior to occupancy has been approved by the department. F. Mitigation banking and in-lieu fee mitigation. Where applicable, the director may approve mitigation banking or in-lieu fee mitigation as a form of compensatory mitigation for impacts to wetlands, streams, buffers, and fish and wildlife habitat conservation areas when the provisions of this chapter require mitigation. Mitigation banks and in-lieu fee programs shall only be used when the applicant can demonstrate the following: 1. The proposed use will provide equivalent or greater replacement of critical area functions and values when compared to conventional onsite or offsite permittee-responsible mitigation; 2. The proposed use will provide significant ecological benefits including long-term conservation of critical areas, important species, and habitats or habitat linkages; 3. The use of mitigation bank or in-lieu fee program will offer a viable alternative to piecemeal mitigation for individual project impacts, thereby achieving ecosystem-based conservation goals; and 4. The program is certified in accordance with applicable federal and state mitigation rules, and the use of credits is consistent with the terms of the certified bank instrument.
(Ord. No. 3746, § 3, 4-19-05; Ord. No. 4159, § 1, 7-21-15; Ord. No. 4542, § 55, 6-16-26)
Ask a question about Kent law
Corpus searches the Kent sections it holds and shows the ones that match, with their citations. Free, no sign-in.