§ 11.06.570 — Mitigation monitoring. Revised 8/26
Kent City Code (current through Ordinance 4547, passed August 18, 2026) · Kent City Code § 11.06.570
Corpus is an independent public-information project, not the official City of Kent website. Stable reference: corpuslaw.us/code/58c081be-ae35-4e60-bcf2-cbbadadbc198
11.06.570 Mitigation monitoring. Revised 8/26
A. For any actions permitted by this chapter which require a mitigation plan, a monitoring program shall be prepared and implemented by the applicant to evaluate the success of the mitigation project and to determine necessary corrective actions. This program shall determine if the original goals and objectives of the mitigation plan are being met. The monitoring program shall be submitted to, reviewed, and approved by the department as a part of the mitigation plan. B. The monitoring program shall include a contingency plan in the event that implementation of the mitigation plan fails to satisfy the approved goals and objectives. A financial guarantee or other security device, acceptable to both the director and the city attorney, is required to ensure the applicant’s compliance with the terms of the approved mitigation plan. The amount of the financial guarantee shall equal 125 percent of the cost of the mitigation project for the length of the monitoring period. Financial guarantees shall not be reduced or released until the maintenance and monitoring period is complete and has been approved in writing by the director. C. The following elements shall be incorporated into monitoring programs prepared to comply with this chapter and shall be a part of the approved mitigation plan: 1. Appropriate, accepted, and unbiased qualitative or precise and accurate quantitative sampling methods to evaluate the success or failure of the project. 2. Quantitative sampling methods that include permanent photo points installed at the completion of construction and maintained throughout the monitoring period, transects, sampling points (e.g., quadrants or water quality or quantity monitoring stations), and wildlife monitoring stations. 3. Clearly stipulated qualitative and quantitative sampling methods. 4. Appropriate qualitative and quantitative performance standards that will be used to measure the success or failure of the mitigation. These will include, at a minimum, standards for plant survival, target density and species diversity, including structural diversity, the extent of wetland hydrology, hydric soils, and habitat types and requirements as appropriate. Where plantings are proposed, a soil analysis is required. Soil amendments shall be considered as appropriate for site conditions. 5. A schedule for the mitigation monitoring program shall be for a period of at least five years and include at a minimum: preparation of an as-built plan at Year 0; monitoring and preparation of monitoring reports following implementation and acceptance of the as-built plan; and a maintenance plan. Monitoring periods may be reduced to three years at the discretion of the director if the annual monitoring report proves that the mitigation project has met established performance standards. More stringent monitoring requirements may be required on a case-by-case basis for more complex mitigation plans. 6. Monitoring reports shall be submitted to the department at the end of Years 0 (as-built), 1, 3, and 5. A schedule for the submittal of monitoring reports and maintenance periods shall be described in the approved mitigation plan. The reports shall be prepared by a qualified professional and must contain all qualitative and quantitative monitoring data, photographs, and an evaluation of each of the applicable performance standards. If performance standards are not being met, appropriate corrective or contingency measures must be identified and implemented to ensure that performance standards will be met. 7. The director may extend the monitoring period beyond the minimum time frame if performance standards are not being met at the end of the initial five-year period; and may require additional financial guarantees to ensure that any additional monitoring and contingencies are completed to ensure the success of the mitigation. Should the director extend the monitoring period beyond five years, additional monitoring reports shall be submitted to the department in Year 7 and, if applicable, Year 10. The monitoring reporting schedule for monitoring required beyond 10 years shall be determined on a case-by-case basis by the director.
(Ord. No. 3746, § 3, 4-19-05; Ord. No. 4159, § 1, 7-21-15; Ord. No. 4542, § 56, 6-16-26)
Ask a question about Kent law
Corpus searches the Kent sections it holds and shows the ones that match, with their citations. Free, no sign-in.