For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25.09.045 — Exemptions

Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 25.09.045

Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/af61538c-234b-4892-ae2b-239b7c272a50

25.09.045 - Exemptions

A. General criteria and applications 1. When the Director determines that criteria in subsections 25.09.045.E to 25.09.045.J are met, those activities are exempt from the provisions of this Chapter 25.09, except for subsections 25.09.045.B, 25.09.045.C, 25.09.065.A, and 25.09.065.B and Sections 25.09.017, 25.09.030.B, and 25.09.070, and as otherwise provided in this Section 25.09.045. 2. An application for an exemption may be made only as a component of a specific proposed development. The application shall include all portions of the proposed development, including utilities. Requesting approval for an exemption does not require a separate application from a development permit application if the proposed development permit application shows that all applicable provisions of this Section 25.09.045 are met, unless a separate application is required by the Director. 3. Applications a. The applicant for an exemption shall provide all information requested by the Director and demonstrate that the work qualifies for the exemption. The Director shall determine whether work is exempt, apply tree and vegetation standards pursuant to subsection 25.09.070.G, and impose conditions on the work to protect environmentally critical areas and buffers or other property, including application of Section 25.09.065. b. City agencies taking the action under any subsection of this Section 25.09.045 and a public agency taking the action under subsection 25.09.045.J do not need to make an application to the Director, provided that, if no application is made, they shall comply with all provisions of this Section 25.09.045, make all determinations required to be made by the Director, including required conditions, and maintain records documenting compliance with all provisions. B. All exempt activities shall be undertaken using best management practices as defined by this Chapter 25.09. The applicant shall maintain records documenting compliance with this subsection 25.09.045.B. C. The enforcement provisions of this Chapter 25.09 apply to all activities exempted under this Section 25.09.045. The Director's determination that a violation exists is not limited by determinations made by other City agencies or public agencies under subsection 25.09.045.A.3.b. D. For in-water and wetland work, exemptions from the City environmentally critical area requirements does not exempt the work from other required state and federal approvals. E. Distance from environmentally critical area or buffer. If the Director determines based on the distance between the proposed development and the environmentally critical area that the proposed action will occur far enough away from any environmentally critical area or buffer on the parcel that it will not temporarily or permanently encroach within, alter, or increase the impact to the environmentally critical area or buffer then the proposed action is exempt. F. Maintenance and repair, or interior renovation and interior structural alteration or window, siding, or roof replacement of existing development if: 1. It does not increase the size of the development as determined by the plan view of the project; 2. It does not increase the impact to, including construction impacts, encroach further within, or further alter an environmentally critical area or buffer; and 3. In any five-year period starting from May 14, 2017, the exterior structural alteration to the existing structure is less than 50 percent, not including window, siding, or roof replacement. G. Emergency work 1. Work that directly relates to ending a condition that: a. Is an immediate threat to the public health, safety, and welfare or creates an immediate risk of damage to public or private property; and b. Requires remedial or preventive action in a timeframe too short to allow compliance with the application, submittal, and approval provisions of this Chapter 25.09, provided that the work is the minimum work necessary to end the condition and the work is consistent with the development standards of this Chapter 25.09 to the extent practicable. 2. Once the Director determines that the condition no longer meets these criteria, all work is subject to the provisions of this Chapter 25.09, including but not limited to its application and permitting requirements, its development standards, mitigation for work performed as part of the emergency, and any requirements for technical reports and reviews for work that was exempt at the time it was performed. H. Utilities, rights-of-way, public and private enhancement projects, and public trails 1. Activities identified in subsection 25.09.045.H.3 are exempt, if the applicant demonstrates: a. The work is not a prerequisite to other development in an environmentally critical area or buffer; b. No practicable alternative to the work with less impact on the environmentally critical area or buffer exists pursuant to subsection 25.09.065.B.1.a; and c. The work does not pose an unreasonable threat to the public health, safety, or welfare or to the environment, on or off the property. 2. For activities identified in subsection 25.09.045.H.3, the Director may require: a. A site plan showing the approved location and limits of the work; b. The application of mitigation standards as set out in Section 25.09.065 including specific mitigation measures for all impacts to environmentally critical areas and buffers before, during, and after construction; and c. Special inspection at the Director's discretion. 3. The provisions of this subsection 25.09.045.H apply to the following activities: a. Relocation of electric facilities, lines, equipment, or appurtenances, not including substations, with an associated voltage of 55,000 volts or less only when required by a governmental agency; b. Relocation of natural gas, cable communications, gas, telephone facilities, and public utility lines, pipes, mains, equipment, or appurtenances only when required by a governmental agency; c. Installation or construction in improved public road rights-of-way, and replacement, operation, or alteration, of all electric facilities, lines, equipment, or appurtenances, not including substations, with an associated voltage of 55,000 volts or less; d. Installation or construction in improved public road rights-of-way, and replacement, operation, repair, or alteration of all natural gas, cable communications, telephone facilities, and public utility lines, pipes, mains, equipment, or appurtenances; e. Public or private projects designed exclusively to enhance ecological function in the Shoreline District or to enhance fish and wildlife habitat conservation areas, wetlands, and wetland buffers, including stormwater-related functions, that require either a Hydraulic Project Approval from the Washington Department of Fish and Wildlife, Section 401 Certification or a Section 404 permit under the federal Clean Water Act from the Washington State Department of Ecology or United States Army Corps of Engineers, respectively, or any project funded by the Aquatic Habitat Matching Grant program, established by Resolution 30719, if applicable; and f. Public projects if the purpose for the intrusion into the environmentally critical area or buffer is to benefit the public's passive enjoyment of the environmentally critical area, such as, but not limited to, walking trails providing access to a riparian corridor or wetland area, when located and designed to minimize environmental disturbance and adverse impacts to the environmentally critical area and buffer. The applicant shall protect vegetation and trees pursuant to a tree and vegetation plan consistent with Section 25.09.070. The plan shall be prepared by a qualified environmental professional with experience related to the type of environmentally critical area or buffer where work will occur. In landslide-prone areas the plan shall also be approved by a geotechnical engineer licensed in the State of Washington with experience in analyzing geological hazards related to slope stability and tree and vegetation removal on steep slope erosion hazard areas. Trail projects shall be: 1) Limited to pervious surface or raised boardwalk, using non-treated wood or other non-toxic material; 2) No more than 5 feet wide; 3) For pedestrian or bicycle use only; and 4) Located to avoid removal of trees. I. Maintenance of structures associated with existing public facilities and utilities. Operation, maintenance, remodeling, repair, and removal of existing public facilities and utilities, if these activities are normal and routine and if these activities do not result in substantial disturbance or adverse impacts of environmentally critical areas or buffers. J. Tree and vegetation maintenance in publically owned areas by public agencies. Normal and routine pruning, tree and vegetation maintenance, forest thinning for forest health, and revegetation using native trees and vegetation if these activities are normal and routine and they do not result in substantial disturbance or adverse impacts of environmentally critical areas or buffers, and they are carried out in parks, public utility rights-of-way, and publicly owned open spaces by the public agencies that are responsible for them. K. Site investigative work. Minor site investigative work, such as surveys, soil logs, percolation tests, and other related activities, if it does not exceed grading that is exempt under Chapter 22.170 and impacts to the environmentally critical area and buffer are minimized, and disturbed areas are immediately restored.

(Ord. 127099, § 68, 2024; Ord. 126685, § 71, 2022; Ord. 125292, § 1, 2017; Ord. 125248, § 7, 2017; Ord. 124447, § 12, 2014; Ord. 124105, § 39, 2013; Ord. 122050 § 1, 2006)

Ask a question about Seattle law

Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.