For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25.09.060 — General development standards

Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 25.09.060

Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/37fb8497-6edc-4ad4-822f-d992143c1e85

25.09.060 - General development standards

The following general development standards apply to development on parcels containing environmentally critical areas or buffers, except as specifically provided in this Chapter 25.09: A. Any required non-disturbance area shall be legibly shown and described on the site plan, and a covenant shall be required as set out in Section 25.09.335. B. The project shall avoid adverse impacts from development on environmentally critical areas and buffers. The Director shall restrict developmental coverage and construction activity areas to the most environmentally suitable, naturally stable, and least sensitive portion of the site in order to protect the ecological functions and values of wetlands and fish and wildlife habitat conservation areas, prevent erosion from development on steep slope erosion hazard areas, and protect the public health, safety, and welfare in landslide-prone and flood-prone areas. Grading activities and impervious surfaces that may impact environmentally critical areas or buffers shall be kept to a minimum and occur only in areas approved by the Director. Mitigation pursuant to Section 25.09.065 is required for wetlands, fish and wildlife habitat conservation areas, and steep slope erosion hazard areas. C. Driveways and utility corridors that may impact environmentally critical areas or buffers shall be kept to a minimum through the use of common access drives and corridors where feasible. Roads, walkways, and parking areas should be designed parallel to topographic contours with consideration given to maintaining consolidated areas of natural topography and trees and vegetation. Access shall be located in a way that keeps impacts to environmentally critical areas and buffers to a minimum. D. All non-disturbance areas shall be fenced with a highly visible and durable protective barrier during construction to prevent access and to protect environmentally critical areas. E. All site clearing on the lot that may impact environmentally critical areas or buffers shall be carried out in stages just prior to construction, and cleared areas shall be kept to the minimum for construction. Revegetation shall occur after the particular phase of construction is completed and shall comply with Sections 25.09.065 and 25.09.070 as appropriate. If required by the Director, a tree and vegetation plan shall establish a staged vegetation removal and replacement program that keeps the amount of exposed soil during and after construction to a minimum, amends the soils if necessary to improve plant survival in the areas to be replanted, and complies with Sections 25.09.065 and 25.09.070. In drier months, temporary surface irrigation or temporary installation of intermediate plantings may be required until weather or seasonal conditions permit installation of the permanent plantings. F. Construction activity on the lot that may impact environmentally critical areas or buffers shall adhere to a prepared schedule and mitigation plan approved by the Director prior to the start of construction. This schedule and mitigation plan shall include, but not be limited to, a schedule for compliance with project conditions, limits of construction and work activities, equipment to be used, start and duration of each phase, work sequencing, and shall include the design, implementation, maintenance, and monitoring of mitigation requirements to prevent erosion, siltation, and destruction of trees and vegetation. G. All grading in environmentally critical areas shall be completed or stabilized by October 31 of each year unless the applicant demonstrates to the satisfaction of the Director based on approved technical analysis that no environmental harm or safety problems would result from grading between October 31 and April 1. This provision does not apply to grading in liquefaction-prone areas, peat settlement prone areas, flood-prone areas, and abandoned landfills unless the parcel contains another environmentally critical area. H. Best management practices shall be used for all construction activity on parcels with landslide prone areas, steep slope erosion hazard areas, fish and wildlife habitat conservation areas, wetlands, or wetland buffers to prevent sediment and other pollutants from entering any of the environmentally critical areas or buffers in this subsection 25.09.060.H on or off the property. Best management practices include, but are not limited to, installation of siltation barriers, diversion measures, slope drains, and structural, vegetative stabilization techniques and other methods prescribed in Chapters 22.800 through 22.808. I. The Director may require an erosion control plan when ground disturbance has the potential to cause erosion. The erosion control plan shall be consistent with best management practices, and best management practices shall be followed in implementing it. J. The site, including developmental coverage and construction activity areas, shall be managed in a manner sufficient to control stormwater and prevent erosion during construction, consistent with Chapters 22.800 through 22.808 and associated Director's Rules. K. When calculating detention requirements, all disturbed areas on the site shall be calculated as developmental coverage, including revegetated areas, excluding enhanced or restored areas approved by the Director. L. The Director may require a development to meet the Seattle Building Code's "design earthquake ground motion" or to account for the 100 year flood event, unless a design for a greater event is required by other applicable codes. M. The Director may require additional construction practices and methods and requirements, including but not limited to best management practices as outlined in federal, state, and Seattle manuals, and limitations on construction equipment permitted on the site, to protect environmentally critical areas and buffers on and off the property. N. No provision of this Chapter 25.09 shall be construed to require putting new or existing power lines underground. O. Vegetation removal and disturbance shall be avoided to the extent feasible. Any vegetation installed within environmentally critical areas and their buffers pursuant to Section 25.09.070 shall be native vegetation.

(Ord. 126685, § 73, 2022; Ord. 126157, § 57, 2020; Ord. 125292, § 1, 2017; Ord. 125248, § 11, 2017; Ord. 124447, § 14, 2014; Ord. 123106, § 8, 2009; Ord. 122050, § 1, 2006; Ord. 121276, § 37, 2003; Ord. 116976, § 3, 1993; Ord. 116253, § 1, 1992)

Ask a question about Seattle law

Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.