§ 10.22.050 — Permit required

Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 10.22.050

Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/06b45589-c1b7-4bcb-9c3b-d7045d30249d

§ 10.22.050: Permit required.

A. No Person shall grade, pave, level, alter, construct, repair, remove or Excavate any pavement, sidewalk, crosswalk, curb, driveway, gutter, public sewer, water main, conduit, fuel tank, vault, or any other Structure or improvement located over, under, or upon any street, alley, or other public place, or place any Structure, building materials, earth, gravel, rock, garbage, debris, or any other material or thing tending to obstruct, damage, disturb, or interfere with the free use thereof or any improvement situate therein, or cause a dangerous condition thereon, without first obtaining a Permit in writing from the Director. B. No Permittee shall perform Work in an area larger, at a location different, or for a longer period of time than that specified in the Permit or Permit application. If, after Work is commenced under an approved Permit, it becomes necessary to perform Work in a larger or different area than originally requested under the application or for a longer period of time, the Permittee shall notify the Director immediately and, within 24 hours, shall file a supplementary application for the additional Work if required by the Director. C. The applicant may subcontract the Work to be performed under a Permit, provided that the Permittee shall be and remain responsible for the performance of the Work under the Permit and all insurance and financial security as required. D. In the City, the physical construction of public Infrastructure in new developments is the responsibility of the Developer of the land. Ownership of that Infrastructure remains with the Developer of the land until acceptance by the City. Any Developer of land where Work is undertaken on Infrastructure that is within the Rights-of-Way, but prior to acceptance by the City, shall obtain a Permit from the City. The City will not accept public Infrastructure improvements where Work performed is not in accordance with applicable City Specifications and applicable provisions of this chapter. E. Any Person or utility found to be conducting any Excavation activity within the Rights-of-Way, without having first obtained the required Permit(s), shall immediately cease all activity (exclusive of actions required to stabilize the area) and be required to obtain a Permit before Work may be restarted. F. No Permit shall be assignable and no Person shall allow his or her name to be used to obtain a Permit or Permits for any other Person; provided, however that a Contractor may obtain a Permit on behalf of an Owner, in which case both the Contractor’s and the Owner’s name shall appear on the Permit. G. All applications for such Permit shall be signed by the Person, or his duly authorized agent, who desires to do the Work designated in said application. Said Permit will become void 30 days after the date of issue, unless otherwise provided in the Permit or unless extended or revoked by the Director. H. No Permit shall be issued where it appears that the Work to be done, or any part thereof, conflicts with the provisions of this chapter. I. Notwithstanding anything in this Section 10.22.050 to the contrary, for entities that undertake regular, routine maintenance or other limited Work that physically impacts the Rights-of-Way or disrupts traffic in the Rights-of-Way not lasting more than one day, the Director may grant Annual Permits to allow for such Work without the need for obtaining individual Permits on each occasion. The Director may, in his reasonable discretion, consistent with the needs of public safety and welfare, limit the kinds of Work that will be subject to Annual Permits and may attach conditions to the granting of any Annual Permits. Permittees shall notify the Director 24 hours in advance of performing routine maintenance or other limited Work if the Work will impact traffic for more than one day or if lane closures are required during peak traffic hours. Permits issued for Work accomplished under an Annual Permit in arterial streets shall require an approved traffic control plan in accordance with Section 10.22.140 of this code. Permits issued for Work accomplished under an Annual Permit in all other streets shall utilize traffic control in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and the City’s Traffic Control Manual and are not required to submit site specific traffic control plans for such Work.

( Ord. 27834 Ex. A, 2009-09-22 )