§ 12.06A.240: Filing of drawings and specifications.
A. A completed plan review application shall be submitted with information required to complete the review process including, but not limited to, documentation specified in the Plan Review Application Instructions. Submitted plans for projects identified in subsection (B)(1) and (2) of this Section shall be in accordance with WAC 296 46B 900 and must be stamped by a Professional Electrical Engineer registered with the State of Washington. B. Electrical Permit applicants are required to submit electrical plans, load calculations, and specifications for work to be performed on: 1. Schools, hospitals, institutions, and other projects as specified in the WAC; 2. All systems that have emergency generators (NEC Articles 517, 700, 701); 3. Downtown network services and feeders over 200 amps; 4. Systems operating over 600 volts; 5. Commercial and industrial services greater than 400 amps; 6. Residential services and feeders over 400 amps; C. Electrical plans must be submitted to Tacoma Power’s Electrical Inspection Office for review, giving sufficient time to complete the review prior to beginning electrical construction. A Tacoma Power approved set of drawings must be on the job site for the electrical inspector’s use. No inspection will be performed unless the approved plans are on the job site or special written permission is granted by the Chief Electrical Inspector or his designee. Where inspections are performed by Tacoma Power prior to plan approval, electrical materials or equipment may be required to be re-installed to meet the requirements of this chapter once plan review is complete. Electrical service will not be provided unless approved plans are on site and the electrical service equipment installation is approved. D. Plan review fees are included in the commercial Permit fees. When no Permit has been purchased and the project has been canceled, or excessive time is required to review plans submitted with incomplete information or extensive errors, a fee of $80 per hour will be charged.
( Ord. 28443 Ex. A, 2017-08-01 ; Ord. 28689 Ex. A, 2020-09-01 ; Ord. 28995 Ex. B, 2024-12-03 )
Ask a question about Tacoma law
Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.