§ 12.10.275 — Property-side (private) in public rights-of-way

Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 12.10.275

Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/81056e28-fb5a-4dce-964f-53f721d6ddd2

§ 12.10.275: Property-side (private) in public rights-of-way.

A. When a customer requests a service and meter installation for a property not abutting a water main and the public entity having jurisdiction over the right-of-way does not allow privately owned water lines in the right-of-way then the customer must obtain easements from the adjacent property owners for installation of their property side pipe. Recorded copies of said easements must be provided to the Division before installation of the requested service and meter can occur. Where a public entity requires that a customer’s existing property-side (private) pipes be removed from public rights-of-way, the following four options are available to the customer: 1. The customer may arrange for a private contractor to install a new water main in the right-of-way using the private contract process noted in Section 12.10.200. The main would be designed by the Division and installed by the contractor, at the expense of the customer. Following the construction of the water main in the right-of-way, the customer’s service and meter will be transferred to the new main at no charge. 2. The customer may organize with adjacent property owners to form a Local Improvement District (“LID”) to install a new water main in the right-of-way. The design and construction process is similar to Option 1 above, but the project is financed and repaid over time through the Division, through the LID process. 3. The customer may obtain easements from adjacent property owners to allow relocation of its property-side (private) pipes out of the right-of-way into the easement obtained. In this option, the customer must provide verification to the Division that the easement has been recorded prior to the installation of the service and meter. 4. The Customer may arrange for the Division to design and install the necessary water main and appurtenances using the time and materials process. The Division will estimate all costs associated with design and construction of the proposed water main and appurtenances and the customer will be required to make a deposit in the estimated amount. If the final costs are more than the estimate the customer will be required to pay the balance, if the costs are less the difference will be refunded.

( Ord. 27522 § 13, 2006-08-29 ; Ord. 27570 § 7, 2006-12-19 ; Ord. 27778 Ex. A, 2009-01-06 )