For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.06.070 — Overlay Districts

Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 13.06.070

Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/97a153db-c396-44d2-a411-d7b446d5ae16

§ 13.06.070: Overlay Districts.

A. View-Sensitive Overlay District. 1. Applicability. a. The View Sensitive Overlay Districts (VS-20) and (VS-25) shall apply to all buildings, structures, or portions thereof, hereafter erected within the designated Overlay District. The View Sensitive 20-Foot Overlay District – In areas with a predominant 20-foot development pattern which orient towards views of the Puget Sound and/or the Narrows Bridge. (VS-20). The View Sensitive 25-Foot Overlay District - In areas with a predominant 25-foot development pattern which orient towards views of the Puget Sound and/or the Narrows Bridge. (VS-25). b. This section shall not apply to any building, structure, or portion thereof within any development or subdivision which is greater than 30 acres in size and which has an approved site plan or residential plat; provided, such site plans must have established the height or elevation of buildings, and such residential plats must have active architectural control committees, of which a resident or property owner of the plat shall be a member, and recorded covenants which give consideration to protection of views, and the architectural control committee must have reviewed and approved the plans of the building or structures before submittal to the City. c. Map. [image] Figure: Tacoma View-Sensitive District Overlay – Citywide (map) 2. Purpose. The purpose of the View-Sensitive Overlay District is to maintain height compatibility between new development and existing development in areas with long standing residential development with views of the Puget Sound and the Narrows Bridge. The View Sensitive Overlay District was established to balance the interests of new development or remodel to existing development with the interests of the surrounding property owners who wish to preserve the character of the neighborhood including public and private views. The View Sensitive Overlay District has been established in areas with steep topography and an established pattern of larger lots. 3. District development standards. a. A building, structure, or portion thereof, hereafter erected, shall not exceed a height of 20 feet, or 25 feet per applicable Overlay District designation, except as provided in Sections 13.06.010F, 13.05.010A and 13.06.010B. b. Parking lot lighting shall not exceed 20 feet in height. c. Parking quantity reductions. See 13.06.090C. B. South Tacoma Manufacturing/Industrial Overlay District. 1. Applicability. a. Standards established through the overlay zone are in addition to the requirements of the underlying zone. In all cases, where the overlay district imposes more restrictive standards than the underlying zone, these shall apply. b. Map. [image] 2. Purpose. To provide additional protection to industrial and manufacturing uses within the designated boundary of the South Tacoma M/IC by placing further restrictions on incompatible uses within this defined area. The additional requirements imposed through the South Tacoma M/IC Overlay District are intended to preserve this area for long term urban industrial and manufacturing use consistent with policy direction in the Comprehensive Plan. 3. Expansion. Expansion of the overlay district beyond the current boundaries can only be done in conjunction with an expansion of the designated South Tacoma M/IC Center in the Comprehensive Plan. Expansion beyond current boundaries should be carefully considered, as such expansion may decrease the distance between incompatible uses and will impose additional restrictions on the development of residential and commercial uses in affected areas. 4. District use restrictions. a. Prohibited uses. • | Adult family home • | Confidential shelter • | Continuing care retirement community • | Day care facility prohibited in the M-2 District; conditional use in the M-1 District • | Dwellings, not permitted except quarters for caretakers and watchpersons are permitted as is temporary worker housing to support uses located in these districts • | Emergency and transitional housing • | Extended care facility • | Foster home • | Golf course • | Group Housing • | Hospital uses are prohibited in the M-2 District • | Hotel Motel • | Animal slaughter, fat rendering, smelters, and blast furnaces • | Intermediate care facility • | Juvenile community facility • | Residential care facility for youth • | Residential chemical dependency treatment facility • | Retirement home • | General K through 12 education facilities • | Staffed residential home • | Student housing • | Theater b. Conditional uses. • | Commercial recreation and entertainment facilities over 10,000 square feet in the M-1 District and 15,000 square feet in the M-2 District. • | Cultural institution. • | Hospital uses in the M-1 District c. Temporary uses. • | Carnival 5. District Development Standards. • | Office: unless an accessory use, limited to 10,000 square feet of floor area per development site in the M-2 district and 15,000 square feet of floor area per development site in the M-1 District. • | Marijuana retailer: limited to 10,000 square feet of floor area per development site in the M-2 district and 15,000 square feet of floor area per development site in the M-1 District. • | Retail: unless an accessory use, limited to 10,000 square feet of floor area per development site in the M-2 district and 15,000 square feet of floor area per development site in the M-1 District. • | Day care facilities: limited to 15,000 square feet of building floor area per development site in the M-1 District. C. PRD Planned Residential Development District. 1. Applicability. a. Map. [image] 2. Purpose. At the time of the adoption of the overlay district(s) the PRD Planned Residential Development District was intended to: provide for greater flexibility in large scale residential developments; promote a more desirable living environment than would be possible through the strict regulations of conventional zoning districts; encourage developers to use a more creative approach in land development and stormwater management; provide a means for reducing the improvements required in development through better design and land planning; conserve natural features and retain native vegetation; provide a high quality of urban design pursuant to creating a livable and attractive neighborhood and place-making; facilitate more desirable, aesthetic, and efficient use of open space; promote sustainable building and site design practices; and promote the voluntary incorporation of affordable housing through provision of voluntary density bonuses. Land classified as a PRD District is also classified as one or more of the regular residential zoning districts and shall be designated by a combination of symbols (e.g., UR-1 PRD planned residential development district); this is known as the “underling zoning”. 3. District procedures. No new PRD applications will be accepted. 4. General requirements. a. Existing PRD Districts are subject to the provisions of their approvals, including the amount and designation of required open space. PRD modifications are addressed in TMC § 13.05.130F. b. PRDs are permitted as an overlay in all residential districts, with the exception that PRDs are not permitted in the HMR-SRD District or within designated Historic Districts. c. The site approval shall be binding upon the development and substantial variations from the plan shall be subject to approval by the Director. d. No building permit shall be issued without a site approval. e. The site approval shall expire as provided in Chapter 13.05. f. PRDs are subject to the provisions of the underlying zoning district and other pertinent sections of the TMC, unless specifically addressed in this section or through the conditions of the PRD decision or site approval. 5. District use restrictions. A building, structure, or land, and a building or structure hereafter built, altered, or enlarged, shall be used for only the uses permitted as was determined and codified in the adoption of the PRD. 6. Height regulations. The height of buildings, structures, or portions thereof, shall be the same as the residential district with which the PRD District is combined. 7. District development standards. a. Setback regulations. (1) A minimum 20-foot building setback shall be maintained from the district property line on the perimeter of the PRD District. Setbacks from dedicated arterial streets within the PRD District shall be maintained in accordance with the requirements of the residential district with which it is combined. (2) The distance separating buildings, exclusive of accessory buildings, shall be adequate to provide for fire safety, emergency access, maintenance and, where appropriate, pedestrian passage, except that a building on a platted lot may be attached to any building or buildings on any adjoining platted lot or lots. Accessory buildings shall not be permitted within required setback areas. (3) Building setbacks from the PRD District boundary, from dedicated streets adjacent to and within the PRD District, and from other buildings shall be increased by one-half foot for each one foot the height of such a building or structure exceeds 35 feet. b. Site coverage. Buildings and structures shall not occupy more than one-half of the area of the PRD District. 8. Common open space. a. All open space shall be provided and maintained in compliance with the adopting PRD ordinance and approved Site Plan. Any modifications to open space shall be reviewed per the modification standards in TMC § 13.05.130. b. Such common open space shall be available for use or enjoyment by all of the residents of the PRD District or the general public. The common open space shall be dedicated, reserved or otherwise held in common by a proportional ownership interest shared among all of the property owners within the PRD, or alternatively, and only if acceptable to the receiving public agency, dedicated to the public. c. Permanent provisions for the maintenance and management of open space, private trails, private parks and recreation areas, and other common areas shall also be provided. These provisions shall run with the land and be recorded. 9. All land within the Planned Residential Development District shall be subject to contractual agreements with the City of Tacoma and to recorded covenants approved by the City of Tacoma providing for compliance with the regulations and provisions of the district and the site plan or plat as approved. 10. Modifications. Modifications to existing PRDs shall be subject to further review and approval, in accordance with the criteria and standards contained in Section 13.05.130, including the additional provisions in subsection 13.05.130F., and the expanded notice provisions in Sections 13.05.070C.2 and 13.05.070D.2. D. South Tacoma Groundwater Protection District (STGPD). 1. Applicability. a. The mandates of this chapter shall apply to new and existing developments and facilities, and to the alteration and/or expansion of existing uses, when such uses are listed in the “High Impact Use Table” and are located within the South Tacoma Groundwater Protection District (“STGPD”). b. All property within the STGPD, as defined in Section 13.06.070D.27, shall comply with the requirements of this chapter, the zoning requirements of the STGPD, the Critical Areas Preservation code, and any additional requirements of the zoning district where the property is presently located or may be located in the future. As an overlay district, STGPD regulations shall apply in addition to other city regulations, and in the event of conflict the stricter provisions shall control. c. Map. [image] 2. Background, purpose, and intent. The Growth Management Act (GMA) mandates the designation and protection of critical areas to prevent harm to the community from natural hazards and to preserve natural resources. Per RCW 36.70A.030 (11), there are five types of critical areas, including Critical Aquifer Recharge Areas (CARAs). CARAs are defined under WAC 365-190-100 as areas with a critical recharging effect on aquifers used for potable water, including areas where an aquifer that is a source of drinking water is vulnerable to contamination that would affect the potability of the water or is susceptible to reduced recharge. Section 13.01.110A of TMC, defines CARAs as areas that, due to the presence of certain soils, geology, and surface water act to recharge groundwater by percolation. The South Tacoma groundwater aquifer system serves as a significant source of drinking water for the City of Tacoma. It may supply as much as 50 percent of the City’s total water demand during periods of peak summer usage. For future growth, supplemental supply, and emergency response, this resource will continue to be extremely important to the City of Tacoma. The accidental or improper release of hazardous substances through spillage, leaks, or discharges from local industry has been identified as a major cause of historical groundwater contamination in the South Tacoma aquifer system. In response, the City of Tacoma found that it was necessary and in the public interest to establish the South Tacoma Groundwater Protection District in 1988, due to the large number of potential contamination sources and hazardous substances within the aquifer recharge system and the possibility of further contamination. The STGPD is an overlay zoning and land use control district specifically designed to prevent the degradation of groundwater in the South Tacoma aquifer system by controlling the handling, storage and disposal of hazardous substances by businesses. The overlay zoning district imposes additional restrictions on high impact land use development in order to protect public health and safety by preserving and maintaining the existing groundwater supply. This increased level of protection will protect the City of Tacoma from costs which might be incurred if unsuitable high impact land uses were to reduce either the quality or quantity of this important public water supply source. This chapter intends to establish procedures that reduce risks to public health and safety, as well as impacts to the groundwater supply. These procedures shall ensure that within the STGPD, properties that have stormwater infiltration facilities and properties that store hazardous substances meet appropriate performance standards, and those properties are properly maintained, inspected, and tested when necessary. 3. Declaration of policy. In order for the City of Tacoma to maintain its groundwater resources within the STGPD as near as reasonably possible to their natural condition of purity, it is the policy of the City of Tacoma to establish strict performance standards which will reduce or eliminate threats to this resource from improper handling, storage, and disposal of hazardous substances by businesses. The City of Tacoma shall require the use of all practical methods and procedures for protecting groundwater, while encouraging appropriate commercial and industrial uses to locate and conduct business within the STGPD. The Tacoma-Pierce County Health Department (“TPCHD”) shall be responsible for implementing the STGPD regulations established in TMC § 13.06.070D. Tacoma Planning and Development Services shall not make changes or amendments to TMC § 13.06.070(D) without documented coordination with TPCHD and Tacoma Water. The Tacoma-Pierce County Board of Health may adopt regulations consistent with this section. It is recommended that the TPCHD work cooperatively through education with owners and operators of regulated facilities to voluntarily reach compliance before initiating penalties or other enforcement action. 4. General provisions. a. District designated (location). The STGPD is part of Central Pierce County Sole-Source Aquifer. For the purposes of this chapter and to carry out these regulations, the boundaries of the STGPD are delineated on the map referenced in Section 13.06.070(D)(1)(c). Planning and Development Services shall maintain this map. The boundaries may be updated and supplemented as necessary to reflect the best available science, development, and zoning changes. The City of Tacoma and Planning and Development Services shall review the STGPD boundaries at least every ten years to ensure accuracy and relevance. The physical boundaries of the STGPD are further described in the General Guidance and Performance Standards. b. District designated (critical area). Pursuant to RCW 36.70A.030(11), RCW 36.70A.060 and TMC Chapter 13.11 of this title as may be amended from time to time, the area described above is hereby designated as a Critical Area due to its geohydrological sensitivity. c. Development and adoption of technical standards. The TPCHD shall maintain a document entitled “General Guidance and Performance Standards for the South Tacoma Groundwater Protection District” (hereinafter referred to as the “General Guidance and Performance Standards”). These standards shall prescribe the minimum acceptable best management practices which are consistent with the requirements of this chapter and TMC Chapter 13.11 (Critical Areas Preservation). This document, to the extent that it assists in meeting the purposes and intent of this chapter and the Critical Areas Preservation Ordinance, is incorporated herein as though fully set forth. This document is available from the TPCHD. Periodically, the TPCHD shall review these standards to ensure improvements in technology are considered and that the standards are consistent with this chapter. d. Application process. Facilities that use, store, dispose or otherwise handle hazardous substance(s) and/or have a stormwater infiltration unit on-site, and are not exempt under section 13.06.070. D.8, must complete and submit an STGPD permit application to the TPCHD. Application forms shall contain information prescribed by the TPCHD. e. Fees. At the time of application submission, the applicant shall pay a fee in an amount sufficient to pay the costs of issuing the permits, conducting an initial inspection, and one follow-up inspection under this chapter. Fees for permits, permit renewals, and other services rendered under this program shall be included in the TPCHD’s fee schedule, as approved by the Tacoma-Pierce County Board of Health. The approved fee schedule is available from the TPCHD. f. Cost recovery. In the event that violations of this chapter require the TPCHD or Planning and Development Services Director to spend more time (including but not limited to repeat inspections, spill response, remedial action plan review, or other enforcement actions) at a regulated facility than anticipated in the permit fee, permit renewal fee, or other properly established fee, the TPCHD may bill the regulated facility for additional time at an hourly rate approved by the Tacoma-Pierce County Board of Health. The bill shall include a detailed description of the time and activities for which the regulated facility is being billed. Failure to pay cost-recovery bills shall be considered a violation of this chapter. 5. High impact uses. a. Map of wellhead protection areas and time of travel zones. The following map (Figure 1) identifies the boundaries of the STGPD, including the 1-Year and 10-Year Time of Travel Zones and associated Wellhead Protection Areas (WHPAs). This map shall be used in conjunction with the High Impact Use Table to determine use restrictions based on location. The City shall maintain the official GIS version of this map, which may be updated as necessary to reflect best available science and changes to the aquifer system. Figure 1. STGPD Wellhead Protection Areas and Time of Travel Zones [image] b. The High Impact Use Table below identifies the new, expanded, or altered land uses and activities that are restricted or prohibited within the STGPD and WHPAs. The table distinguishes between different zones of protection, including the 1-Year and 10-Year Time of Travel Zones within designated WHPAs, and the remaining areas of the STGPD outside those zones. The Director of Planning and Development Services, or designee, shall consult the North American Industry Classification System (“NAICS”) Manual for assistance in reviewing and making use interpretations pursuant to this subsection. High Impact Use Table abbreviation: P: Permitted use, subject to STGPD permit and requirements of this title N: Prohibited use High Impact Use Table – STGPD Restricted Uses and Activities1 | Wellhead Protection Areas 1-Year Time of Travel Zone | 10-Year Time of Travel Zones | Remaining STGPD Area (Outside WHPAs) Agricultural Uses | N | N | P Animal slaughter and fat rendering facilities | N | N | N Asphalt plants/cement and concrete plants | N | N | N Boat refinishing | P | P | P Cemeteries and funeral facilities | N | P | P Chemical manufacture and reprocessing. | N | N | N Chemical storage facilities (not include fuel) | N | N | N Chemical/hazardous waste reprocessing and disposal | N | N | N Coal Facility | N | N | N Creosote/asphalt manufacture or treatment | N | N | N Drycleaner facilities | N | N | N Electroplating activities | N | N | N Fire training center | N | N | N Greenhouse – commercial/nursery – wholesale/retail | N | P | P Hazardous waste treatment, transfer, storage, or disposal facilities including radioactive wastes (“Designated Facility” per Ecology’s Chapter 173-303 WAC et seq.). | N | N | N Infiltration of reclaimed water | N | N | N Landfill—demolition (inert), municipal sanitary waste, solid waste, wood waste, hazardous waste | N | N | N Machine shops, fabricating, metal processing with etchers and chemicals | N | P | P Manufacture of Class 1A or 1B flammable liquids as defined in the Fire Code. | N | N | N Mining and quarrying | N | N | N Metal recycling/auto wrecking facilities | N | N | N Pesticide/fertilizer storage facilities | N | N | N Petroleum and petroleum products refinery, including reprocessing and petroleum fuel facilities. | N | N | N Pulp and Paper Mill | N | N | N Railroad yards-cargo transfer areas | N | P | P Sewage lift stations | N | P | P Smelting | N | N | N Solid waste processing/handling/transferring/recycling | N | P | P Storage Tanks – above ground (hazardous substances) | N | P | P Storage Tanks – underground (hazardous substances) | N2 | N2 | N2 Vehicle and boat repair/service/garages/body shops | N | P | P Wood products preserving | N | N | N Footnotes: 1. | In addition to use restrictions under base zoning, the above uses are subject to additional limitations or prohibitions within the STGPD. 2. | USTs are prohibited in all areas of the STGPD. An exception may be granted for USTs associated with Essential Public Facilities, as described in RCW 36.70A.200(1). Such uses require an STGPD Permit. Existing USTs may be replaced so long as the replacement meets the standards TMC § 13.06.070D.10. c. Split parcels. When a parcel is located in more than one zone or protection area within the STGPD: 1. The portion of the parcel within the 1-Year Time of Travel Zone shall be subject to all regulations applicable to that zone. 2. The portion of the parcel within the 10-Year Time of Travel Zone shall be subject to all regulations applicable to that zone. 3. The portion of the parcel within the remainder of the STGPD outside of Time of Travel zones shall be subject to all regulations applicable to that area. d. The uses and activities listed in the High Impact Use Table shall not be allowed within the STGPD if Planning and Development Services, in consultation with other qualified experts, determines that the proposed use poses a risk to groundwater quality, consistent with the provisions of this chapter. e. Pre-existing nonconforming uses and structures. An established use or existing structure that was lawfully permitted prior to adoption of this ordinance, but that does not comply with the provisions of this chapter, may continue subject to TMC Chapter 13.11, Critical Areas Preservation, and Section 13.06.010L . Continued operation is permitted as long as the use or structure does not result in contamination of the site or the groundwater, as determined by the TPCHD regulations and other applicable environmental regulations and agencies. f. The uses listed in the High Impact Use Table shall be periodically reviewed and revised if needed, by Planning and Development Services or its successor agency in consultation with the TPCHD, Environmental Services, and Tacoma Water. This review shall occur at least once every ten years, in accordance with the Growth Management Act (RCW 36.70A.130) periodic update cycle, using Best Available Science (BAS) to evaluate potential high impact uses or improvements in technology, pollution control, and management. g. Permanent or temporary storage of hazardous substances on sites with pervious surfaces, the disposal of hazardous substances, and the disposal of solid waste is prohibited, unless such discharge or disposal is specifically in accordance with a valid discharge permit, is approved for discharge into the City’s municipal wastewater system pursuant to Chapter 12.08 of the Tacoma Municipal Code as may be amended or is conducted in compliance with the requirements of a solid waste handling permit issued by the TPCHD. 6. Stormwater infiltration. a. Infiltration shall be considered the preferred method of stormwater management in aquifer recharge areas, provided that the quality of the infiltrated water is sufficient to protect groundwater resources. b. Infiltration of runoff from non-pollution generating hard or pervious surfaces is not restricted in the STGPD and will continue to be regulated per the requirements of the City of Tacoma’s Stormwater Management Manual (SWMM). c. Stormwater from pollution-generating surfaces may be allowed to infiltrate under specific circumstances and shall be subject to additional treatment and monitoring requirements as described in City Policy ESD17-1, “South Tacoma Groundwater Protection District Infiltration Policy,” dated January 9, 2017, or as hereafter amended from time to time. If a property owner proposes to infiltrate and in the opinion of the City of Tacoma Planning and Development Services and Environmental Services, or its successor agency, infiltration would be an appropriate and reasonable stormwater management technique for the site, then City of Tacoma, with concurrence of the TPCHD, may approve the stormwater management system subject to construction permit review and approval of a design by a licensed professional engineer. d. In determining the feasibility of stormwater infiltration, City and TPCHD staff shall consider known soil assessments where available or, where soil assessments have not been conducted, shall require an assessment of soil contaminants to determine the risk to groundwater. e. If approved, additional and/or more restrictive design criteria, treatment, monitoring, and permitting requirements may be imposed upon the facilities. A Covenant and Easement Agreement, allowing for periodic inspection and/or sampling of a regulated facility, shall be required for private facilities. Sampling may be performed by Environmental Services, Tacoma Water, or the TPCHD. The Covenant and Easement Agreement shall be recorded on the property title. f. Facilities with onsite stormwater infiltration facilities shall be considered regulated facilities within the STGPD. Such regulated facilities will be permitted and receive inspections by the TPCHD or Environmental Services to verify maintenance of the facility, business practices, and compliance with other requirements outlined in the General Guidance and Performance Standards. g. Existing stormwater infiltration facilities installed before December 31, 2006, shall be exempt from the requirements of this section, except that a change of use or change of ownership shall trigger review and additional requirements, as appropriate. h. If ownership or site operations change at a facility with a stormwater infiltration facility, the new operations shall be reviewed by Environmental Services and the TPCHD, or their successor agencies, to ensure continued use of the stormwater infiltration facility does not present a risk to groundwater quality. If continued use of the stormwater infiltration facility is not acceptable under the new operations, a new private stormwater management system and/or public storm system extension and connection may be required to be designed and constructed pursuant to the City of Tacoma Stormwater Management Manual to permit new operations on the site. 7. Permits – Construction, modification, operation, change in use. a. It is a violation of this chapter for any person to construct, install, substantially modify, or change the use of a facility or regulated facility as defined herein, or part thereof, without a valid permit or authorization issued by or acceptable to the TPCHD. b. It is a violation of this chapter for any person to use, cause to be used, maintain, fill, or cause to be filled any facility with a hazardous substance without having registered the facility on forms provided by the TPCHD and without having obtained or maintaining a valid permit issued by the TPCHD to operate such facility or part thereof. c. No permit or authorization to operate a regulated facility as required herein shall be issued by the TPCHD or shall be satisfactory to the TPCHD unless and until the prospective permittee, at a minimum: (1) Provides a listing to the TPCHD of all of the hazardous substances and amounts to be stored, used, or handled at the facility; and (2) Demonstrates that the facility complies with all the provisions of this chapter and the standards set forth in the General Guidance and Performance Standards. d. It is a violation of this chapter for any person in possession of or acting pursuant to a permit or authorization issued to allow or cause another person to act, in any matter contrary to any provision of said permit or authorization. 8. Exemptions. The following facilities shall be exempt from all provisions of this chapter: a. Any handling, storing, disposing, or generating of 220 pounds (100 kilograms) or less of a hazardous substance per month or batch unless specifically ruled otherwise by the TPCHD on a case-by-case basis. b. Farm or residential tanks of 1,100 gallons or less capacity used for storing motor fuel and heating oil tanks for non-commercial purposes. c. Any small quantity of hazardous substances intended solely for personal use. d. Gasoline or diesel tanks attached to private or commercial motor vehicles and used directly in the propulsion of that vehicle, including tank trucks in transit. e. A pipeline facility (including gathering lines) regulated under: (1) the Natural Gas Pipeline Safety Act of 1968 reauthorized in 1996 as the Accountable Pipeline Safety and Partnership Act as may be amended from time to time, or (2) the Hazardous Liquid Pipeline Safety Act of 1979 as may be amended from time to time; or which is an interstate pipeline facility regulated under State laws comparable to the provisions of law referred to in (1) and (2) above. f. The City’s municipal sewer system, in accordance with Chapter 12.08 of Tacoma Municipal Code as may be amended from time to time. g. Any municipal solid waste landfill or other regulated solid waste handling activities, when permitted and operated in compliance with Chapter 173-351 WAC et seq. or 173-350 WAC et seq. as adopted locally by the Tacoma-Pierce County Health Department Board of Health, and as may be amended from time to time. h. The application of fertilizer, plant growth retardants and pesticides in accordance with label directions and requirements of the Washington State Department of Agriculture. i. On-site sewage system. 9. Hazardous substance storage and management. Owners and operators of regulated facilities shall: a. Store hazardous substances in containers that are in good condition. b. Label containers in a manner that adequately identifies the major risk(s) associated with their contents. Labels shall not be obscured, removed, or otherwise unreadable. c. Remove or destroy labels from empty containers no longer used for hazardous substance storage, and label such containers as “Empty” or otherwise provide a clear indication acceptable to the TPCHD that the containers are not useable. d. Use containers made of, or lined with, materials that will not react with, and are otherwise compatible with, the hazardous substance being stored. e. Always have containers closed except when it is necessary to add or remove hazardous substances. f. Maintain a minimum 30-inch separation between rows of containers holding hazardous substances and ensure that each row of drums is no more than two drums deep. g. Provide and maintain containment systems for container storage areas that are capable of collecting and holding spills and leaks with sufficient capacity to contain 10 percent of the volume of all containers, or 100 percent of the volume of the largest container, whichever is greater. h. Store all hazardous substance containers in a covered area where they will not be degraded by the weather or exposed to stormwater. i. At closure of the facility, all hazardous substances must be removed from the containment system. Remaining containers, liners, bases, and soil containing or contaminated with hazardous substances or residues must be decontaminated or removed to the satisfaction of the TPCHD. j. Ensure that business practices and stormwater infiltration facility maintenance minimizes potential releases of hazardous substances to the environment. k. Comply with additional storage and management requirements that may be required by the TPCHD on a case-by-case basis as deemed necessary to reduce risks to public health and safety and to the existing groundwater supply. 10. Underground storage tanks. a. Replacement of existing underground storage tanks. (1) Existing underground storage tanks may be replaced. Any underground storage tank installed to replace an existing tank for the storage of hazardous substances shall be designed and constructed to: (a) Prevent releases due to corrosion or structural failure for the operational life of the tank; (b) Be cathodically protected against corrosion, constructed of noncorrosive material, steel clad with a noncorrosive material, or designed in a manner to prevent the release, or threatened release, of any stored substance; and (c) Use material in the construction or lining of the tank which is compatible with the substance to be stored. (2) Design, construction, installation, repair, monitoring, release detection, corrosion, and compatibility standards for underground storage tanks installed as replacements, including piping, shall be in accordance with the requirements and standards set forth in the General Guidance and Performance Standards and the rules of the Department of Ecology’s 173-360A WAC as may be amended from time to time, whichever is more stringent; and shall further comply with all applicable permit requirements of the Tacoma Fire Department. (3) All new underground storage tanks installed as replacements must use release detection method(s) specified in the General Guidance and Performance Standards. b. Existing underground storage tanks. All existing underground storage tanks must comply with the release detection requirements, including the compliance schedule, in the General Guidance and Performance Standards. c. Underground storage tank closures. (1) No person shall abandon or close an underground storage tank, temporarily or otherwise, except as provided in this subsection and in compliance with the General Guidance and Performance Standards and the TPCHD’s Environmental Health Code Chapter 4 (UST regulation, as may be amended from time to time). (2) An underground storage tank that is temporarily closed, but that the operator intends to return to use within one year, shall continue to be subject to all the permit, corrosion protection, and release detection requirements of this chapter and those established pursuant to the General Guidance and Performance Standards. If the underground storage tank is out of service for more than one year TPCHD, in consultation with the regulated facility owner or operator, will determine whether to implement final closure of the tank or grant an additional one-year period of temporary closure. The TPCHD will not allow an underground storage tank at a regulated facility to exist in a temporary closure state for a period greater than two years. (3) No person shall permanently close an underground storage tank unless the person undertakes all of the following actions: (a) Notifies the TPCHD and other appropriate agencies at least 60 days in advance of any closing and obtains the proper authorization or permit according to the TPCHD Environmental Health Code Chapter 4, as may be amended from time to time. (b) Demonstrates to the TPCHD that all residual amounts of the hazardous substance which were stored in the tank prior to its closure have been removed and properly disposed. (c) Permanently removes the tank unless the tank is located under a permanent building and cannot be removed without removing the building. 11. Aboveground storage tanks. a. New aboveground storage tanks. (1) All new aboveground storage tanks shall be fabricated, constructed, installed, used, and maintained to prevent the release of a hazardous substance to the ground, groundwaters, and surface waters of the STGPD. (2) All new aboveground storage tanks shall be installed, used, and maintained with an impervious containment area enclosing or underlying the tank conforming to the requirements set forth in the General Guidance and Performance Standards. b. Existing aboveground storage tanks. (1) It shall be a violation of this chapter to substantially modify or cause the substantial modification of any existing aboveground storage facility or part thereof without obtaining a permit or authorization from the TPCHD and the Fire Department and without complying with the provisions of this section and the General Guidance and Performance Standards. (2) Inspections, release detection, and corrective action requirements for aboveground storage tanks shall be followed as set forth in this chapter and the General Guidance and Performance Standards. c. Aboveground storage tank closures. (1) No person shall abandon or close an aboveground storage tank, temporarily or otherwise, except as provided in this section and in compliance with the General Guidance and Performance Standards. (2) No person shall close an aboveground storage tank unless the person demonstrates to the TPCHD that all residual amounts of the hazardous substance that were stored in the tank prior to its closure have been removed and properly disposed. 12. Inspections and testing. a. Any owner or operator of a regulated facility shall, upon request of any representative of the TPCHD, the Planning and Development Services, Environmental Services, Tacoma Water, or Tax and License Division of the Finance Department, or their successor agencies whose duties entail enforcing the provisions of this chapter, provide information relating to the regulated facility, conduct monitoring or testing, and permit such representative access to the facility and to copy all records relating to the hazardous substances or stormwater infiltration facility at all reasonable times. To implement this chapter including determining whether a facility is a regulated facility, representatives of the above-referenced departments are hereby authorized to: (1) Enter any property, regulated facility, establishment or other place where tank(s) or hazardous substances in regulated quantities, or stormwater infiltration facilities are located, at reasonable times; (2) Inspect and obtain samples of any known or suspected hazardous substances at the facility; and (3) Conduct monitoring or testing of the tanks and/or hazardous substances containers, associated equipment, contents, or surrounding soils, air, surface water, stormwater or groundwater. b. During inspections the TPCHD will, to the degree practical, provide education and technical assistance and work cooperatively to help the regulated facility’s owner or operator achieve voluntary compliance before initiating enforcement action, imposing penalties, or seeking other remedies. c. Each inspection shall be commenced and completed with reasonable promptness. If the above-referenced department representative obtains any samples prior to leaving the premises, they shall give to the owner or operator a receipt describing the sample(s) obtained and, if requested, a portion of each sample equal in volume or weight to the portion retained. If any analysis is made of the sample(s), a copy of the results of the analysis shall be furnished promptly to the owner or operator. Copies of TPCHD inspection forms and reports will be provided to the regulated facility owner or operator upon request. d. In addition to the inspections specified in subsection a. above, the TPCHD may require the owner or operator of an underground storage tank or aboveground storage tank to employ, periodically, a service provider certified by the International Code Council to conduct an audit or assessment of the tank(s) to determine whether the facility complies with the design and construction standards of § 13.06.070D.10 (Underground Storage Tanks) and § 13.06.070D.11 (Aboveground Storage Tanks), whether the owner or operator has monitored and tested the tank required by this permit, and whether the tank is in a safe operating condition. The inspector shall prepare an inspection report with recommendations concerning the safe storage of hazardous substances at the regulated facility. The report shall contain recommendations consistent with the provisions of this chapter where appropriate. A copy of the report shall be filed with the TPCHD at the same time the inspector submits the report to the owner or operator of the regulated facility. The owner or operator shall file with the TPCHD a plan to implement all recommendations contained in the report, along with any additional requirements imposed by the TPCHD within 30 days after receiving the report or within 30 days of receiving additional requirements imposed by the TPCHD, whichever is later. Alternatively, the owner or operator may demonstrate within the same period, to the satisfaction of the TPCHD, why one or more of these recommendations should not be implemented. 13. Spill prevention and management. a. General guidance and performance standards. Owners and operators of regulated facilities including businesses, wholesale distributors, processors, and manufacturers, must adopt and comply with appropriate spill or leak prevention and management practices in accordance with the General Guidance and Performance Standards. Regulated facilities will be evaluated by the TPCHD during an initial inspection, routine inspections (not less frequently than biennially) and subsequent inspections in response to spills or releases to the environment, or as a result of substantial modification or changes in operation to determine if additional requirements are necessary to comply with appropriate spill prevention and management standards. b. Spill prevention requirements. Owners and operators of regulated facilities must prepare and follow a schedule for the following activities as set forth in the General Guidance and Performance Standards: (1) Facility inspection. (a) Loading, unloading, and transfer areas. (b) Container storage, handling, and integrity. (c) Container labeling. (d) Secondary containment. (e) Bulk storage. (2) Employee training. (3) Recordkeeping and hazardous substances inventory. c. Spill management requirements. As part of the STGPD permitting process, owners and operators of regulated facilities must prepare and submit a written spill management plan, which explains the procedures to be followed in response to an unexpected release of hazardous substances. The spill management plan must contain facility and site-specific information, an inventory or description of spill response equipment, and response procedures, all in accordance with the General Guidance and Performance Standards. 14. Release reporting, investigation, corrective actions. a. Release reporting. Owners and operators of a regulated facility shall report to the TPCHD and Environmental Services within 24 hours, unless otherwise indicated: (1) All belowground releases of a hazardous substance in any quantity, including: (a) Testing, sampling, or monitoring results from a release detection method that indicates a release may have occurred. (b) Unusual operating conditions, such as the erratic behavior of product-dispensing equipment, the sudden loss of product from the underground storage tank, an unexplained presence of water in the tank, or the physical presence of the hazardous substance or an unusual level of vapors on the site that are of unknown origin. (c) Impacts in the surrounding area, such as evidence of hazardous substances or resulting vapors in soils, basements, sewer and utility lines, and nearby surface water. (d) Other conditions as may be established by the TPCHD and incorporated into the General Guidance and Performance Standards. The TPCHD, in administering and enforcing this section, may, if appropriate, take into account types, classes, and ages of underground storage tank(s). In making such distinctions, the TPCHD may take into consideration factors including, but not limited to: location of the tank(s), soil conditions, use of the tank(s), history of maintenance, age of the tank(s), current industry-recommended practices, hydrogeology, water table, size of the tank(s), quantity of hazardous substance periodically deposited in or dispensed from the regulated facility, the technical capability of the owners and operators, the compatibility of the hazardous substance, and the materials of which the tank(s) is fabricated. (2) All above-ground releases of petroleum to land in excess of 25 gallons, or less than 25 gallons if the release reaches a pervious surface or drain or the owners and operators are unable to contain or clean up the release within 24 hours. (3) All above-ground releases which result in a sheen on the surface water or stormwater. (4) All above-ground releases to land or surface waters of hazardous substances other than petroleum in excess of the reportable quantity established under 40 CFR 302 as may be amended from time to time for the released substance shall be reported immediately. (5) Any known or suspected discharge of hazardous substance to a stormwater infiltration facility. (6) The owners or operators shall provide, within 30 days, any additional information on corrective action as may be required by the TPCHD and referenced in the General Guidance and Performance Standards. b. Investigation and confirmation. Unless corrective action is initiated by the owner or operator or is otherwise directed by the TPCHD, all suspected releases requiring reporting, as set forth above, must be immediately investigated by the owner or operator. Such procedures may include, but shall not be limited to, the following: (1) A site-specific investigation of surrounding soils, groundwater, wastewater, sewer and other utility lines and structures, and nearby surface water. (2) An investigation of the secondary containment area, if applicable. (3) Testing of the tank(s) and piping for tightness or structural soundness. Confirmation of a release by one of these methods will require the owner and operator to comply with the requirements for corrective action as set forth below. c. Corrective action. All owners or operators of a regulated facility shall, in response to a suspected or confirmed release, comply with the directives and requirements of the TPCHD in accordance with the General Guidance and Performance Standards. d. A report to the TPCHD shall not be deemed compliance with any reporting requirements of any federal, state, or local law. 15. Recordkeeping. a. A regulated facility must maintain written records of the following: (1) Hazardous substance disposal records. Hazardous substance disposal records documenting proper disposal must be retained for at least five years from the date the waste was accepted by the transporter. Records may include but are not limited to manifests, bills of ladings, and receipts. (Note: The TPCHD encourages businesses to retain hazardous waste disposal or recycling records indefinitely.) (2) Release detection method records. Records documenting the equipment manufacturer or installer’s leak detection devices performance, including all monitoring or sampling results and tank tightness results must be retained for a period of no less than five years. (3) Corrosion protection system records. Reporting periods for corrosion protection systems must be retained for a minimum of five years or as proposed by the Environmental Protection Agency pursuant to 40 CFR 280 as may be amended from time to time. (4) Tank repair records. Records demonstrating that the tank was properly repaired and passed ultrasonic and vacuum tests must be retained until closure. (5) Facility and underground storage tank closure records. Records showing samples collected during the closure process must be kept for three years in the case of a temporary closure and five years in the case of a permanent closure. (6) Stormwater infiltration facility records. Operation and maintenance inspections by owner or stormwater management professionals. b. Any other recordkeeping requirement that may be required by a permit issued pursuant to this chapter or as established in the General Guidance and Performance Standards. (1) All records required by this subsection must be maintained: (a) On-site and be immediately available for inspection; or (b) At a readily available alternative site and be provided for inspection by the TPCHD within 24 hours; and (c) Retained for no less than five years, unless otherwise specified. c. All records and information are subject to public disclosure unless protected from disclosure by RCW 42.56.230 as may be amended from time to time, RCW 19.108 et seq., or other state or federal law. d. Excavation operations within the boundaries of this district shall be subject to the permit requirements and standards contained in Titles 2 and 3 of the City Code as considered appropriate. 16. Variances. Any request for deviation from the requirements of this chapter shall be processed in accordance with the variance procedures set forth in TMC § 13.05.010B. 17. Deferral. The TPCHD may, at its discretion, elect to defer enforcement of specific STGPD requirements if other state, local, or federal regulations or permits provide an equivalent or superior level of environmental protection. Such deferrals shall be subject to periodic review by the TPCHD and may be revoked or modified upon a finding that an equivalent or superior level of environmental protection is no longer provided. 18. Enforcement responsibility. a. It shall be the duty of the TPCHD Director, the Planning and Development Services Director, or their designees, to enforce and administer the provisions of this chapter, except that: (1) It shall be the duty of the Director of Environmental Services, or designee, to enforce the specific provisions of Section 13.06.070D.6 of this chapter. (2) It shall be the duty of the Tax and License Division of the Finance Department of the City or any successor department to suspend or revoke a business license when deemed necessary by the TPCHD and the Tax and License Division pursuant to Section 13.06.070D.25.(b) of this chapter. (3) It shall be the duty of the Legal Department of the City or any successor department to enforce the criminal penalties as set forth in Section 13.06.070D.24 of this chapter. 19. Enforcement process. a. Each violation requires a review of all relevant facts to determine the appropriate enforcement response. When enforcing the provisions of this Chapter the TPCHD Director or the Planning and Development Services Director shall, as practical, seek to resolve violations without resorting to formal enforcement measures. When formal enforcement measures are necessary, the TPCHD Director or the Planning and Development Services Director shall seek to resolve violations administratively prior to imposing civil penalties or seeking other remedies. The TPCHD Director or the Planning and Development Services Director shall generally seek to gain compliance via civil penalties prior to pursuing criminal penalties. The TPCHD Director or the Planning and Development Services Director will consider a variety of factors when determining the appropriate enforcement response, including but not limited to: (1) Severity, duration, and impact of the violation(s); (2) Compliance history, including any similar violations at the same facility or caused by the same operator; (3) Economic benefit gained by the violation(s); (4) Intent or negligence demonstrated by the person(s) responsible for the violation(s); (5) Responsiveness in correcting the violation(s); and, (6) Other circumstances, including any mitigating factors. b. Voluntary compliance. The TPCHD Director or the Planning and Development Services Director may pursue a reasonable attempt to secure voluntary compliance by contacting the owner or other person responsible for the violation, explaining the violation and requesting compliance. This contact may be in person or in writing or both. c. Notice of violation. When the TPCHD Director or the Planning and Development Services Director determines that a violation has occurred or is occurring the TPCHD Director or the Planning and Development Services Director may issue a Notice of Violation to the person(s) responsible for the violation. A Notice of Violation may be issued without having attempted to secure Voluntary Compliance based upon an assessment of the factors listed in Section 13.06.070D.19.a above. (1) Documentation of violations. A Notice of Violation shall: include a description of the regulated facility; document the nature of the violation(s); cite the particular section(s) or provision(s) of this Chapter or of the General Guidance and Performance Standards which has been violated; describe the required corrective action(s); specify a date or time by which the violation(s) must be corrected; describe penalties and other remedies available pursuant to this chapter; and, describe applicable administrative review or appeal processes. (2) Service of notice of violation. (a) Whenever service is required or permitted to be made upon a person responsible for the violation represented by an attorney, the service shall be made upon the attorney unless otherwise ordered by the court. Service upon the attorney or upon a person responsible for the violation shall be made by delivering a copy or by mailing it to them at their last known address or, if no address is known, filing with the clerk of the court an affidavit of attempt to serve. Delivery of a copy within this Chapter means: handing it to the attorney or to the person responsible for the violation; or leaving it at their office with their clerk or other person in charge thereof; or, if there is no one in charge, leaving it in a conspicuous place therein. (b) If service is made by mail, the papers shall be deposited in the post office addressed to the person on whom they are being served, with the postage prepaid. The service shall be deemed complete upon the third day following the day upon which they are placed in the mail, unless the third day falls upon a Saturday, Sunday, or legal holiday, in which event service shall be deemed complete on the first day other than a Saturday, Sunday or legal holiday, following the third day. (c) Proof of service of all papers permitted to be mailed may be by written acknowledgement of service, by affidavit of the person who mailed the papers, or by certificate of an attorney. If by personal service or by posting, proof of service may be by written declaration, under penalty of perjury, executed by the person affecting the service, declaring the time and date of service and the manner in which the service was made. If by posting the written declaration shall include the facts showing that due diligence was used in attempting to serve the person(s) responsible for the violation personally or by mail. 20. Administrative review. a. Any person to whom a Notice of Violation or civil penalty has been issued may request an administrative review of the Notice of Violation or civil penalty. b. A request for an Administrative Review shall be filed with the TPCHD no later than 14 days following the date of the Notice of Violation or the first assessed civil penalty. The request shall be in writing and shall state the reasons the TPCHD Director or the Planning and Development Services Director should review the Notice of Violation or issuance of the civil penalty. Failure to state a basis for the review shall be cause for dismissal of the review. c. Following review of the information provided the TPCHD Director or the Planning and Development Services Director shall determine whether a violation occurred. The TPCHD Director or the Planning and Development Services Director may affirm, vacate, suspend, or modify the Notice of Violation or the amount of any monetary penalty assessed. The TPCHD Director or the Planning and Development Services Director’s written decision shall be delivered to the appellant by first-class mail and by certified mail, return-receipt requested. 21. Appeals. a. Procedures for appeals to the Tacoma-Pierce County Board of Health’s Hearing Examiner from any ruling or decision of the TPCHD pursuant to this Chapter shall be taken in accordance with Tacoma-Pierce County Board of Health Resolution No. 2002-3411 as may be amended from time to time. b. Procedures for appeals to the City of Tacoma Hearing Examiner from any ruling or decision by the Planning and Development Services Director or the Tax and License Division shall be taken in accordance with Chapter 1.23 TMC as may be amended from time to time. c. Criminal appeals may be taken in accordance with the law. 22. Penalties. Any person responsible for a violation shall be subject to civil and/or criminal (misdemeanor) penalties or additional enforcement procedures on each offense. Each day that a violation continues, or that a person responsible for a violation fails to comply with any of the provisions of this Chapter or refuses or neglects to obey any of the orders, rules or regulations issued by the TPCHD or the Tacoma-Pierce County Health Department Board of Health may be considered a separate violation. Imposition of penalties or other enforcement action under this Chapter does not preclude other violations or penalties of law that may be available pursuant to various Federal and State statutes or other laws. 23. Civil penalty. a. Any person responsible for a violation may be assessed one or more civil penalties. b. Determination of civil penalty. The person(s) responsible for a violation shall incur a monetary penalty for each violation as follows: (1) First day of each violation: $250.00 (2) Second day of each violation: $500.00 (3) Each additional day of each violation beyond two days: $500 per day. c. Collection of monetary penalties. (1) The monetary penalty constitutes a personal obligation of the person to whom a Notice of Violation is directed. Any monetary penalty assessed must be paid within 10 calendar days from the date of notice from the TPCHD that penalties are due. (2) The TPCHD Director or the Planning and Development Services Director or designee is authorized to take appropriate action to collect the monetary penalty. d. Continued duty to correct. Payment of a monetary penalty pursuant to this Chapter does not relieve the person(s) responsible for the violation of the duty to correct the violation(s). 24. Criminal penalty – Misdemeanor. In addition to or as an alternative to the civil penalty provided herein or by law any person responsible for a violation may be guilty of a misdemeanor. Each violation may be prosecuted by the authorities of the city in the name of the people of the state of Washington or the city of Tacoma. The maximum misdemeanor penalty, upon conviction thereof, shall be punished by a fine in any sum not exceeding $1,000.00, or by imprisonment in the Pierce County Jail for a term not exceeding 90 days, or by both such fine and imprisonment. 25. Other remedies. The TPCHD, Planning and Development Services, and Environmental Services reserve the right to pursue other remedies in order to reduce or eliminate threats to the groundwater resource from improper handling, storage, and disposal of hazardous substances by regulated businesses. Pursuit of other remedies shall generally be reserved for instances in which civil penalties have not been or are deemed unlikely to be effective. Other remedies include, but are not limited to: a. Utility holds. Pursuant to Chapter 12.10 TMC, the TPCHD Director or the Planning and Development Services Director may request that water service to a regulated facility be discontinued. b. Revocation or suspension of city-issued licenses. The TPCHD Director or the Planning and Development Services Director may request suspension or revocation of City-issued licenses, including but not limited to the Business License issued by the Tax and License Division of the Finance Department or its successor department. c. Petition for revocation of permits or licenses issued by state or federal agencies. The TPCHD Director or the Planning and Development Services Director may petition state or federal permitting agencies to suspend or revoke permits or licenses held by persons responsible for violations or issued to regulated facilities. d. Stop work order/stop use order. The TPCHD Director or the Planning and Development Services Director may issue a Stop Work or Stop Use Order consistent with the authority and procedures outlined in TMC Section 1.82.060. 26. General program awareness. The City of Tacoma, in collaboration with TPCHD, shall implement innovative public outreach efforts to educate businesses and residents on best practices for CARA protection and promote water conservation and water use efficiency programs. 27. Definitions. For the purpose of Chapter 13.06, Section 13.06.070D, South Tacoma Groundwater Protection District (STGPD), the following words and terms are defined as follows: “Abandoned tank” means an aboveground storage tank, underground storage tank, or other container used for storage of hazardous substances left unused for more than one year, without being substantially emptied or permanently altered structurally to prevent reuse. “Aboveground storage tank” means a device meeting the definition of “tank” in this section and that is situated in such a way that the entire surface area of the tank is completely above the plane of the adjacent surrounding surface and the entire surface area of the tank (including the tank bottom) is able to be visually inspected as defined in Chapter 173-303 WAC. “Act” means doing or performing something. “Aquifer” means a geological formation, group of formations, or part of a formation capable of yielding a significant amount of groundwater to wells or springs. “Container” means any portable device in which a material is stored, transported, treated, disposed of, or otherwise handled. “Contamination” means the degradation of any component of the environment by a release of hazardous substance in sufficient quantity to impair its usefulness as a resource or to be a hazard. “Closure” means to cease a facility’s operations related to hazardous substances by complying with the closure requirements in this Chapter and the General Guidance and Performance Standards or to take an underground storage tank out of operation permanently, in accordance with Washington Administrative Code (“WAC”) 173-360-385, the Washington State Department of Ecology’s Underground Storage Tank regulations, and the TPCHD’s Board of Health Resolution 88-1056, all as may be amended from time to time. “Development” means the construction, reconstruction, conversion, structural alteration, relocation, or enlargement of any building or structure; any use or change in use of any building or land; any extension of any use of land, or any clearing, grading, or other movement of land for which permission may be required pursuant to this chapter. “Disposal” means the discharging, discarding, or abandoning of hazardous substance or the treatment, decontamination, or recycling of such substance once they have been discarded or abandoned. This includes the discharge of any hazardous substance into or on any land, air, or water. “Ecology” means the Washington State Department of Ecology. “Environment” means any air, land, water, or groundwater. “Facility” means all structures, contiguous land, appurtenances, and other improvements on or under the land within the South Tacoma Groundwater Protection District used as a stormwater infiltration facility, or for recycling, reusing, reclaiming, transferring, storing, treating, disposing, or otherwise handling a hazardous substance which is not specifically excluded by the exemptions contained in Section 13.06.070D. “Final closure” means the proper permanent removal of an underground storage tank that is no longer in service. “General Guidance and Performance Standards” means the TPCHD’s most recent publication of the technical standards document “General Guidance and Performance Standards for the South Tacoma Groundwater Protection District.” “Groundwater” means water in a saturated zone or stratum beneath the surface of land or below a surface water body. “Hazardous substance(s)” means any liquid, solid, gas, or sludge, including any material, substance, product, commodity, or waste, regardless of quantity which may pose a present or potential hazard to human health or to the quality of the drinking water supply in the South Tacoma aquifer system when improperly used, stored, transported, or disposed of or otherwise mismanaged, including without exception: 1. Those materials that exhibit any of the physical, chemical or biological properties described in Department of Ecology’s 173-303-082 WAC, 173-303-090 WAC, or 173-303-100 WAC as may be amended from time to time; and 2. Those materials set forth in the General Guidance and Performance Standards hereinafter referred to; 3. Petroleum products and by-products, including crude oil or any faction thereof such as gasoline, diesel, and waste oil which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute); and 4. Any substance or category of substances meeting the definition of a hazardous substance under Chapter 173-340 WAC as may be amended from time to time. “Hard surface” means an impervious surface, a permeable pavement, or a vegetated roof. “High-impact use” means a business establishment that is considered to be hazardous and/or noxious due to the probability and/or magnitude of its effects on the environment. For purposes of this chapter, these uses or establishments possess certain characteristics, which pose a substantial or potential threat or risk to the quality of the ground and surface waters within the South Tacoma Groundwater Protection District. “Impervious surface” means a non-vegetated surface area which either prevents or retards the entry of water into the soil mantle as under natural conditions prior to development. A non-vegetated surface area which causes water to run off the surface in greater quantities or at an increased rate of flow from the flow present under natural conditions prior to development. Common impervious surfaces include, but are not limited to, rooftops, walkways, patios, driveways, parking lots, or storage areas, concrete or asphalt paving, gravel roads, packed earthen materials, and oiled, macadam, or other surfaces which similarly impede the natural infiltration of stormwater. “Manifest” means the shipping document, prepared in accordance with the requirements of Department of Ecology’s 173-303-180 WAC as may be amended from time to time, which is used to identify the quantity, composition, origin, routing, and destination of a hazardous waste while it is being transported to a point of transfer, disposal, treatment, or storage. “Misdemeanor” means any crime punishable by a fine not exceeding $1,000, or imprisonment not exceeding 90 days, or both, unless otherwise specifically defined. “Omission” means a failure to act. “On-site” means the same or geographically contiguous property which may be divided by public or private right of way, provided that the entrance and exit between the properties is at a cross-roads intersection, and access is by crossing as opposed to going along the right of way. Noncontiguous properties owned by the same person but connected by a right of way, which they control and to which the public does not have access, are also considered on-site property. “Operator” means the person responsible for the overall operation of a facility. “Pervious surface” means any surface material that allows stormwater to infiltrate into the ground. Examples include lawn, landscape, pasture, native vegetation areas, and permeable pavements. “Person” means any individual, trust, joint stock company, corporation (including government corporation), partnership, association, consortium, joint venture, commercial entity, state, municipality, commission, political subdivision of a state, interstate body, the federal government, or any department or agency of the federal government. “Person responsible for the violation” means any person that commits any act or omission which is a violation or causes or permits a violation to occur or remain on the property or regulated facility, and includes but is not limited to owners(s), lessor(s), tenant(s), or other person(s) entitled to control, use, and/or occupy property or the regulated facility where a violation occurs, and any person who aids and abets in a violation. “Pollution-generating hard surface (PGHS)” means those hard surfaces considered to be a significant source of pollutants in stormwater runoff. PGHS includes permeable pavement subject to vehicular use. See the listing of surfaces under pollution-generating impervious surface. “Pollution-generating impervious surface (PGIS)” means those impervious surfaces considered to be a significant source of pollutants in stormwater runoff. Such surfaces include those that are subject to: regular vehicular use; industrial activities (involving material handling, transportation, storage, manufacturing, maintenance, treatment or disposal); or storage of erodible or leachable materials, waste or chemicals, and which receive direct rainfall or the run-on or blow-in of rainfall. Metal roofs are also considered to be PGIS unless they are coated with an inert, non-leachable material. Roofs that are subject to venting significant amounts of dusts, mists, or fumes from manufacturing, commercial, or other indoor activities are considered PGIS. “Pollution-generating pervious surfaces (PGPS)” means any non-impervious surface subject to vehicular use, industrial activities (involving material handling, transportation, storage; manufacturing; maintenance; treatment; or disposal); or storage of erodible or leachable materials, wastes, or chemicals, and which receive direct rainfall or runon or blow-in of rainfall, use of pesticides and fertilizers, or loss of soil. Typical PGPS include lawns and landscaped areas, including: golf courses, parks, cemeteries, and sports fields (natural and artificial turf). “Recharge areas” means areas of permeable deposits exposed at the surface which transmit precipitation and surface water to the aquifer. “Regulated facility” means any facility with one or more of the following: underground storage tank(s), aboveground storage tank(s), hazardous substances at regulated quantities, or stormwater infiltration facility subject to regulation under Section 13.06.070D. “Release” means any intentional or unintentional entry of any hazardous substance into the environment, including but not limited to the abandonment or disposal of containers of hazardous substances. Should the definition of “release” in RCW 70A.305.020(32) be amended from time to time, then such amendment is incorporated herein by reference as if set forth at length. “Release detection” means a method or methods of determining whether a release or discharge of a hazardous substance has occurred from a regulated facility into the environment. “Retail business use” means a use in which individually packaged products or quantities of hazardous substances are sold at retail to the general public and are intended for personal or household use. “Solid waste” means all putrescible and non-putrescible solid and semi-solid waste, including, but not limited to, garbage, rubbish, ashes, industrial waste, swill, sewage sludge, demolition and construction wastes, abandoned vehicles or parts thereof, contaminated soils and contaminated dredged material, and recyclable materials as defined in Chapter 173-350 WAC. “Stormwater” means that portion of precipitation, including snowmelt, that does not naturally percolate into the ground or evaporate, but flows via overland flow, interflow, pipes, and other features of a stormwater drainage system into a receiving water or stormwater facility. “Stormwater infiltration facility” means a component of the stormwater system designed to fully or partially infiltrate stormwater runoff into the native underlying soils. “Substantial modifications” means the construction of any additions to an existing facility, or restoration, refurbishment, or renovation which: 1. Increases or decreases the in-place storage capacity of the facility; 2. Alters the physical configuration; 3. Impairs or affects the physical integrity of the facility or its monitoring systems; or 4. Alters or changes the designated use of the facility. “Surface water” means water that flows across the land surface, in natural channels not considered a stormwater conveyance system, or is contained in depressions in the land surface, including but not limited to wetlands, ponds, lakes, rivers, and streams. “Tank” means a stationary device designed to contain an accumulation of hazardous substances, and which is constructed primarily of non-earthen materials (e.g. concrete, steel, plastic) to provide structural support as defined in Chapter 173-360A-0150 WAC. “Temporary closure” means to take a tank out of service for more than one month and less than one year. “TMC” means the Tacoma Municipal Code. “TPCHD” means the Tacoma-Pierce County Health Department. “Underground storage tank” means any one or a combination of tanks (including underground pipes connected thereto) which are used to contain or dispense an accumulation of hazardous substances, and the volume of which (including the volume of underground pipes connected thereto) is 10 percent or more beneath the surface of the ground as defined in Chapter 173-360 WAC. Specific exemptions to this definition are contained in Section 13.06.070D. “Violation” means an act or omission contrary to the requirement of the chapter, and includes conditions resulting from such an act or omission. “Wellhead protection area” is defined as the surface and subsurface area surrounding a water well or wellfield, supplying a public water system, through which contaminants are reasonably likely to move toward and reach such water well or wellfield. The Washington State Department of Health outlines that Wellhead Protection Areas are delineated into zones based on the time it takes for groundwater to travel to the well. These zones include 6-month, 1-year, 5-year, and 10-year time-of-travel (TOT) areas. Each zone represents the estimated time for a particle of water, or a potential contaminant, to reach the well from that boundary. E. Historic Special Review Overlay District. 1. Applicability. a. Map. [image] 2. Purpose. The purpose of this subsection is to: a. Preserve and protect historic resources, including both designated City landmarks and historic resources which are eligible for state, local, or national listing; b. Establish and maintain an open and public process for the designation and maintenance of City landmarks and other historic resources which represent the history of architecture and culture of the City and the nation, and to apply historic preservation standards and guidelines to individual projects fairly and equitably; c. Promote economic development in the City through the adaptive reuse of historic buildings, structures, and districts; d. Conserve and enhance the physical and natural beauty of Tacoma through the development of policies that protect historically compatible settings for such buildings, places, and districts; e. Comply with the state Environmental Policy Act by preserving important historic, cultural, and natural aspects of our national heritage; and f. To promote preservation compatible practices related to cultural, economic and environmental sustainability, including: conservation of resources through retention and enhancement of existing building stock, reduction of impacts to the waste stream resulting from construction activities, promotion of energy conservation, stimulation of job growth in rehabilitation industries, and promotion of Heritage Tourism; g. To contribute to a healthy population by encouraging human scale development and preservation activities, including walkable neighborhoods; and h. Integrate the historic preservation goals of the state Growth Management Act and the goals and objectives set forth in the City’s Comprehensive Plan and regulatory language. 3. District development standards. a. Refer to Tacoma Municipal Code Chapter 13.07 for standards and procedures. F. Joint Base Lewis McChord Airport Compatibility Overlay District (ACD). 1. Applicability. a. The Overlay District applies to an approximately 200-acre area located in South Tacoma corresponding with the JBLM APZ II. b. Proposed zoning changes and Conditional Use Permit (“CUP”) applications, or major modifications to previously approved rezones and CUPs, shall demonstrate consistency with the intent of the Joint Base Lewis McChord Airport Compatibility Overlay District (ACD). If approved, such applications shall be conditioned to record Notice on Title acknowledging the presence and restrictions of the Overlay District. c. For parcels located partially within the Overlay District, only that portion within the Overlay District shall be subject to these provisions. d. Map. [image] 2. Purpose. The purpose of the Joint Base Lewis McChord (“JBLM”) Airport Compatibility Overlay District (“Overlay District”) is to increase safety within the JBLM Accident Potential Zone II (“APZ II”), specifically as follows: a. Prevent development conditions that could interfere with aircraft operations or increase the likelihood of an accident. b. Reduce risk to life and property in the incidence of a crash, through the following strategies. (1) Limit increases in densities and congregations of people which are incompatible with the APZ II designation, which includes the density threshold goal of 50 people per acre maximum and strict limitation on any expansion of occupancy capacity of public assembly, including, but not limited to, assembly facilities, schools, religious assembly, theaters, carnivals, and cultural institutions. (2) Prevent development that presents a higher risk in the incidence of a crash due to explosive or flammable characteristics. c. Implement the City’s policies calling for collaboration and compatibility with JBLM Airfield. d. Increase knowledge of aircraft accident risks in order to inform public and private decision-making. e. Recognize existing uses and avoid undue impacts to residents, property owners, businesses, and institutions. 3. District use restrictions. a. The land use standards of the underlying zoning districts apply within the Overlay District, except that the following land uses are prohibited. PROHIBITED LAND USES WITHIN THE JBLM AIRPORT COMPATIBILITY OVERLAY DISTRICT (1) Residential uses: The following residential uses are prohibited: • | Special Needs Housing with more than six residents. • | Two-unit, three-unit, townhouse, group housing, multi-unit, mobile home, mixed-use, or other development incorporating more than one dwelling unit (excluding Accessory Dwelling Units). (2) Non-residential uses: The following non-residential uses are prohibited: • | Airports; • | Assembly facilities; • | Brewpubs; • | Carnivals; • | Commercial recreation and entertainment; • | Correctional facilities; • | Cultural institutions; • | Day care centers with more than 12 children; • | Detention facilities; • | Heliports; • | Hospitals; • | Hotels/motels; • | Industry, heavy; • | Parks, recreation and open space uses identified in TMC § 13.06.080L as requiring a Conditional Use Permit; • | Public assembly; • | Religious assembly; • | Schools; and • | Theaters. b. Existing residential uses. Lawfully existing residential uses (at the time of Overlay District adoption) which do not meet the provisions of the Overlay District are permitted, and may be modified or expanded, provided there is no increase in the number of dwellings. c. Existing non-residential uses. (1) Non-residential lawfully existing uses (at the time of Overlay District adoption) which are prohibited under the Overlay District are Non-conforming, and subject to the following limitations: (2) Minor modifications under TMC § 13.05.130 are allowed to existing discretionary land uses; however, major modifications must come into compliance with the Overlay District for approval. 4. District development standards. a. The following characteristics, when proposed as part of any development, are not allowed in the Overlay District: (1) Generation of air pollution, electronic interference, or glare that could negatively affect pilots or aircraft. (2) Structures taller than permitted outright in the base zoning districts (i.e., no height variances). (3) Manufacturing or processing of apparel, chemicals, petroleum, rubber, or plastic. b. The following standards apply to residential development within the Overlay District: (1) Density, maximum units per site area, is limited to one dwelling unit per 5,000 square feet of lot area, regardless of zoning district. For purposes of this provision, accessory dwelling units are not counted toward this density limit. G. Port of Tacoma Transition Overlay District (PTD). 1. Applicability. a. The Port of Tacoma Transition Overlay District applies to all residential platting, subdivision, and land uses within the district boundaries established herein: [image] b. Standards established through the overlay district are in addition to the requirements of the underlying zone. In all cases, where the overlay district imposes more restrictive standards than the underlying zone, these shall apply. Unless specifically noted otherwise, all of the standards herein apply within both Parts A (PTD-A) and B (PTD-B) of the overlay district, as identified on the map above. 2. Purpose. The purpose of the Port of Tacoma Transition Overlay District is to maintain an appropriate separation between port/industrial activity in the Port of Tacoma Manufacturing and Industrial Center and residential neighborhoods, to avoid and minimize off-site impacts on residential areas, and to minimize disruption to port operations and associated industrial activity resulting from residential encroachment, consistent with the Container Port Element of the One Tacoma Plan and the Growth Management Act. 3. District development standards. a. Prohibited uses. Multi-unit dwellings, duplex, triplex, cottage housing, townhouse, houseplexes with more than one unit (except an ADU), rowhouses, courtyard housing, and multiplexes are prohibited as stand-alone primary uses or as part of a mixed-use development. b. Maximum density. Subdivision of existing lots shall average no more than one unit per acre. This maximum density shall not apply within Part B of the Port of Tacoma Transition Overlay District, as shown on the map above. c. Use and maximum density exception. A Planned Residential Development (PRD) for a lot that abuts the northern edge of the overlay district and has access from the top of the slope may utilize the dwelling type allowances and density bonuses provided in TMC § 13.06.070C. In this Overlay District the base density used for PRD density bonus calculations will be one unit per acre. d. Location. Residential development shall be located the greatest distance from the boundaries of the Port of Tacoma Manufacturing and Industrial Center as is feasible. e. Site development standards. Residential development shall be designed to minimize disruptions to Port/industrial operations, including minimizing clearing and grading, driveways, and vegetation/tree canopy removal. f. Building design standards. Residential buildings shall incorporate design elements to reduce, to the greatest extent practicable, impacts on occupants from noise and light impacts from nearby port/industrial activity. g. Accessory uses and structures. Uses and structures accessory to a single dwelling unit are permitted in the Overlay district consistent with established development standards for accessory uses in the underlying zone. h. Notice on title. As a condition of subdivision approval or residential building permit issuance for properties within the Overlay District, the Applicant shall record a notice on title which attests that (1) the property is located within the Port of Tacoma Manufacturing and Industrial Center Overlay District, (2) Port of Tacoma industrial activities, including container terminal facilities, are operating and will continue to operate and may expand in the future. The Notice on Title shall include the specific distance of the property from the closest boundary of the Port of Tacoma Manufacturing and Industrial Center.

(Previously codified as 13.06.140, 13.06.555, 13.06.585, and 13.07.020, and Chapter 13.09, relocated to § 13.06.070 by Ord. 28613 Ex. G, 2019-09-24 ; Ord. 28724 Exs. A and B, 2020-12-08 ; Ord. 28725 Exs. A and F, 2020-12-08 ; Ord. 28786 Ex. A, 2021-11-16 ; Ord. 28821 Ex. H, 2022-06-28 ; Ord. 28872 Ex. A, 2023-03-07 ; Ord. 28906 Ex. C, 2023-08-15 ; Ord. 28958 § 2, 2024-03-05 ; Ord. 28977 , 2024-08-27 ; Ord. 28986 Ex. D, 2024-11-19 ; Ord. 29020 , 2025-02-25 ; Ord. 29042 Ex. A, 2025-06-24 ; Subst. Ord. 29051 Ex. A, 2025-09-09 ; Subst. Ord. 29108 , 2026-06-16 )

Ask a question about Tacoma law

Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.