§ 13.11.550 — FWHCA modification

Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 13.11.550

Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/5ebaf1a9-9c68-4afc-a277-d47657e6940f

§ 13.11.550: FWHCA modification.

A. All proposed modification in a FWHCA shall be in accordance with the standards of this Chapter, except where allowed through § 13.11.200 or § 13.11.210. B. Modification and mitigation will comply with applicable General Standards of TMC § 13.11.250 and mitigation requirements specified in § 13.11.270, including, but not limited to, mitigation sequencing, mitigation plan requirements, monitoring and bonding. C. Where a designated FWHCA geographically coincides with another Critical Area, modification and mitigation will comply with applicable requirements described within this chapter for each type of critical area and/or as recommended by state or federal agencies. D. Habitat Management Plan. If the critical area review process as described in this chapter (§ 13.11.190) determines that the proposed project will adversely impact a FWHCA, a Habitat Management Plan shall be prepared as part of a development proposal, the following standards shall apply. 1. The Habitat Management Plan shall be prepared in coordination with the WDFW or federal agencies where appropriate and by a qualified professional. The professional must have an education and professional work experience relevant to the species and habitat being evaluated (See TMC § 13.01.110 Qualified Professional). 2. The Habitat Management Plan may be included as part of a larger critical areas report and shall include all applicable requirements as listed in TMC § 13.11.230 and, at a minimum, the following: a. Analysis and discussion on the project’s effects on the FWHCA; b. An assessment and discussion on special management recommendations which have been developed for species or habitat located on the site by any federal or state agency; c. A discussion of mitigation sequencing and proposed mitigation measures which could avoid or minimize impacts; d. Assessment and evaluation of the effectiveness of mitigation measures proposed; and e. Assessment and evaluation of ongoing management practices which will protect the FWHCA after development of the project site, including proposed monitoring and maintenance programs. f. For Biodiversity Areas a detailed description of vegetation on and adjacent to the project area is required and may include a surveyed site plan with the specific location and species name of trees with a 12-inch or greater Diameter at Breast Height (DBH). E. The following shall apply for proposed modifications within or affecting Biodiversity Areas. 1. In determining which areas are least sensitive to development impacts, the following criteria shall apply: a. A minimum of 65% of the Biodiversity Area shall be left in an undisturbed natural vegetated state. The undisturbed area set aside shall contain all other Priority Habitats, Priority Species, and Critical Areas and Buffers that may be present, per applicable standards. (1) Legally created existing parcels 5,000 square feet in size or smaller must maintain an minimum of 40% of the Biodiversity Area in an undisturbed natural vegetated state. b. A contiguous Habitat Corridor with a width of 300 feet shall be retained connecting onsite and offsite Priority Habitats and Critical Areas including shorelines, as well as significant trees per the definition below. The minimum 300 feet shall be a contiguous area that enters and exits the property. (1) Where a legally created existing parcel cannot accommodate the 300-foot width corridor due to parcel size or configuration, then the maximum feasible width shall be provided in conjunction with maintaining the designated minimum undisturbed gross site area for the size of parcel. (2) Habitat corridor connections may be required to be wider when additional width is supported by the Best Available Science to support the function and values of species or habitat present. c. Retain exceptional trees, significant tree groves, and rare or uncommon plant species or habitat types as identified by the City or by state or federal agencies. (1) Significant tree groves. Significant tree groves means a group of 8 or more trees 12-inches diameter or greater that form a continuous canopy. Trees that are less than 12-inch in diameter that are part of a grove’s continuous canopy are also considered to be significant and cannot be removed if their removal may damage the health of the grove. Street trees shall not be included in determining whether a group of trees is a grove. (2) Retain exceptional trees. "Exceptional tree" means a tree or group of trees that because of its unique historical, ecological, or aesthetic value constitutes an important community resource, and is determined as such by the Director according to standards and procedures promulgated by the Department of Planning and Development. Conifers greater than 30 inches DBH, and Madrone greater than 12 inches DBH are considered exceptional trees. d. Development must be clustered and located in the least sensitive areas and must use Low Impact Development practices where feasible. 2. Proposals that meet the minimum standards in subsection E.1 above may be reviewed under a Minor Development permit. See TMC § 13.11.220B.2. Other proposals will require review under a Development Permit and must also demonstrate the following: a. The project cannot meet the minimum standards in 1 above due to site constraints such as parcel size or other physical conditions and the inability is not the result a self-created hardship. 3. In planning the development of the site, consideration shall also be given to ongoing and future management needs such as vegetation maintenance, generally favoring setting aside a large, connected, contiguous areas as feasible. 4. Buffer Averaging or reduction as described within TMC § 13.11.330 and TMC § 13.11.430 for wetlands and streams can be utilized to average or reduce portions of buffers to accommodate development. a. The standards for preservation of 65% of the gross site area and minimum 300-foot corridor width still apply. 5. Habitat Corridor width averaging. The width of the corridor may be averaged to allow for reasonable use of the property when the following are met: a. The averaged corridor width will not result in degradation of the Habitat Corridor or its ability to facilitate wildlife movement; b. The corridor width is increased adjacent to the high-functioning or more sensitive areas and decreased adjacent to lower-functioning or less sensitive portion; c. The corridor at its narrowest point is never less than ¾ of the required width; and d. The total area of the corridor is equal to the area required without averaging. F. For proposed modifications to Oregon White Oak Habitat, WDFW management recommendations shall apply. Alternative mitigation may be considered on a case-by-case basis only after it has been demonstrated that compliance with the best available science and applicable guidance issued by WDFW is infeasible. G. Innovative mitigation per TMC § 13.11.270L. When the project cannot meet the minimum standards of this section or the project proponent can demonstrate that a different method will achieve equivalent or better protections for the critical area, it will be reviewed per the standards in § 13.11.270L. H. Protection covenant such as a conservation easement shall be recorded with Pierce County Assessor’s Office for critical areas that are identified as part of the review process per § 13.11.280 (Conditions, Notice on Title, and Appeals). I. If mitigation is performed off site, a conservation easement or other legal document must be provided to the City to ensure that the party responsible for the maintenance and monitoring of the mitigation has access and the right to perform these activities.

( Ord. 27728 Ex. A, 2008-07-01 ; Ord. 28109 Ex. O, 2012-12-04 ; Ord. 28230 Ex. F, 2014-07-22 ; Ord. 28518 Ex. 5, 2018-06-26 ; Ord. 28906 Ex. D, 2023-08-15 ; Ord. 29114 , 2026-07-14 )