§ 13.11.730: General standards.
The standards in this section apply only to geologically hazardous areas. The following definitions apply to this section: A. Standard buffers. 1. Determining erosion hazard area and landslide hazard area buffer widths: a. The buffer width shall be measured on a horizontal plane from a perpendicular line established at the edge of the erosion or landslide hazard area limits (from the top and toe of slope). b. An undisturbed buffer of existing vegetation shall be required for a hazard area to protect existing native vegetation. The required buffer width is either the greater amount of the following two distances, or the minimum distance recommended by the geotechnical professional measured from the edge of the hazard area. In the case of a buffer reduced below these two distances, the standards of the buffer modification section shall apply: (1) 50 feet from all edges of the erosion hazard area limits; or (2) A distance of one-third the height of the slope if the regulated activity is at the top of the slope and a distance of one-half the height if the regulated activity is at the bottom of the slope. 2. Buffer modification. a. Modifications to the erosion and/or landslide hazard area buffer consistent with TMC § 13.11.730C, as applicable, may be considered at the approval by the Director if the modification is found to meet TMC § 13.11.730I. b. A minimum 10-foot buffer shall be maintained and the proposed development shall not decrease the factor of safety for landslide occurrences below the limits of 1.5 for static conditions and 1.2 for dynamic conditions. Analysis of dynamic conditions shall be based on a minimum horizontal acceleration as established by the current version of the International Building Code. c. All uses and development must meet the standards in TMC § 13.11.730D. B. Small project waiver. 1. The Director may approve new accessory structures which are not designed for human occupancy, such as storage or utility space, or additions to existing principal structures in a landslide hazard or erosion hazard buffer without submittal of a geotechnical report if no construction occurs over or within any other critical area or buffer, and if the applicant demonstrates that the proposal meets the following criteria: a. The new accessory structure or addition to an existing principal structure is on a lot that has been in existence as a legal building site prior to October 31, 1992; b. The development is consistent with TMC § 13.11.145; c. The new accessory structure is less than 1,000 square feet of floor area for existing residences; d. Addition to existing residences, including decks have a maximum 250 square feet footprint of building, deck or roof area and are not closer to the top or toe of the slope than the existing residence; e. The installation of fences where they do not impede emergency access; f. Removal of noxious or invasive weeds, provided such areas are protected from erosion with either native vegetation or other approved erosion protection; g. It is not practicable to build the accessory structure or addition to an existing principal structure for the intended purpose outside of the landslide or erosion hazard area buffer; h. The location of the accessory structure or addition to an existing principal structure minimizes the impact on the steep slope erosion hazard area and/or buffer; and i. In landslide hazard areas the Director may require a soils report prepared by a qualified geotechnical engineer or geologist licensed by the State of Washington demonstrates that it is safe to construct the new accessory structure or the addition to an existing structure. 2. Director's decision. a. The Director shall require the use of fencing with a durable and visible protective barrier during the construction to protect the remainder of the hazard area and buffer. b. The Director shall require additional measures to protect the remainder of the hazard area and buffer from the impacts of approving new accessory structures or additions to existing principal structures. C. General regulations. 1. The following regulations apply to all geologically hazardous areas: a. New development, modification to existing structures, or the creation of new lots that would cause foreseeable risk from geological conditions to people or improvements during the life of the development shall be prohibited. b. New development, modification to existing structures, or the creation of new lots that would require structural stabilization over the life of the development shall be prohibited, except where: (1) Stabilization is necessary to protect a permitted use; and (2) No alternative location is available; and (3) No net loss of ecological functions will result; and (4) Stabilization measures shall conform to all provisions included in TMC § 2.19.050 through § 2.19.070. c. All developments shall be required to comply with the building code requirements of the TMC. d. All proposed modifications to any geological hazard area or buffer shall remain subject to mitigation sequencing and any unmitigated impacts resulting from a modification are required to be compensated for consistent with TMC § 13.11.230B.4, TMC § 13.11.270F, and TMC § 13.11.290. e. Mitigation sequencing shall not apply where staff has determined through a site-specific evaluation that there is not a significant geologic hazard risk and no other critical area exists. f. Any alteration shall not adversely impact other critical areas. g. Stabilization structures or measures to protect existing primary residential structures may be permitted where no alternatives, including relocation or reconstruction of existing structures, are found to be feasible, and less expensive than the proposed stabilization measure provided they are designed and constructed consistent with the provisions of TMC § 2.19.050 through § 2.19.070. h. Any development, encroachment, filling, clearing, or grading, timber harvest, building structures, impervious surfaces, and vegetation removal within geologically hazardous areas and associated buffers shall be prohibited except as specified in TMC § 13.11.730D through I. D. Erosion and Landslide Hazard areas — Standards. 1. In addition to the general regulations set forth in subsection C above, development and activities within an erosion or landslide hazard critical area or their associated buffers shall incorporate the following additional standards in design of the proposal as applicable. The requirement for long-term slope stability shall exclude designs that require regular and periodic maintenance to maintain their level of function. a. Structures and improvements shall minimize alterations to the natural contour of the slope, and foundations shall be tiered where possible to conform to existing topography. Terracing of the land, however, shall be kept to a minimum to preserve natural topography where possible; b. Structures and improvements shall be located to preserve the most critical portion of the site and its natural landforms and vegetation; c. The proposed development shall not result in greater risk or a need for increased buffers on neighboring properties; d. The use of retaining walls that allow the maintenance of existing natural slope area is preferred over graded artificial slopes where graded slopes would result in increased disturbance as compared to use of retaining walls; e. Development shall be designed to minimize impervious surfaces within the critical area and critical area buffer; f. Where change in grade outside the building footprint is necessary the site retention system should be stepped and regrading should be designed to minimize topographic modification. On slopes in excess of 40 percent, grading for yard area may be disallowed where inconsistent with these criteria; g. Building foundation walls shall be utilized as retaining walls rather than rockeries or retaining structures built separately and away from the building wherever feasible. Freestanding retaining structures that are designed to the same life and performance criteria as the adjacent structure; h. On slopes in excess of 40 percent, use of pole-type construction which conforms to the existing topography is required where feasible. If pole-type construction is not technically feasible, the structure must be tiered to conform to the existing topography and to minimize topographic modification; i. On slopes in excess of 40 percent, piled deck support structures are required where technically feasible for parking or garages over fill-based construction types; and j. Areas of new permanent disturbance and all areas of temporary disturbance shall be mitigated and/or restored pursuant to a mitigation and restoration plan meeting the requirements of this Program. 2. The development shall not increase surface water discharge or sedimentation onsite or to adjacent properties beyond pre-development conditions. Note that point discharges onto adjacent properties is not permitted without approved easements. Dispersed flows meeting pre-developed flows will be permitted provided other development standards can be met. 3. Development shall be designed to minimize impervious lot coverage. All development shall be designed to minimize impervious lot coverage and should incorporate understructure parking and multi-level structures within the existing height limit. 4. Roads, walkways, and parking areas should be designed parallel to topographic contours with consideration given to maintaining consolidated areas of natural topography and vegetation. 5. Removal of vegetation shall be minimized and only that which is needed to accommodate a permitted structure. Any replanting that occurs shall consist of trees, shrubs, and ground cover that is compatible with the existing surrounding vegetation, meets the objectives of erosion prevention and site stabilization, and does not require permanent irrigation for long-term survival. 6. The proposed development shall not result in greater risk or need for increased buffers on neighboring properties. 7. Structures and improvements shall be clustered where possible. Driveways and utility corridors shall be minimized through the use of common access drives and corridors where feasible. Access shall be in the least sensitive area of the site. 8. Active Landslide Hazard — Standards. a. Any new development, encroachment, filling, clearing or grading, impervious surfaces, and vegetation removal is prohibited within an Active Landslide Hazard Area and buffers except as specified in the following specific instances: (1) Stormwater conveyance. Stormwater conveyance shall be allowed when it is conveyed through a high-density polyethylene stormwater pipe with fused joints and when no other stormwater conveyance alternative is available. The pipes shall be located on the surface of the ground and be properly anchored so that it will continue to function in the event of an underlying slide. (2) Utility lines. Utility lines will be permitted when no other conveyance alternative is available. The line shall be located above ground and properly anchored and/or designed so that it will continue to function in the event of an underlying slide. Utility lines may be permitted when it can be show that no other route alternative is available. (3) Trails. Trails shall be allowed when all of the following conditions have been met: (a) The removal or disturbance of vegetation, clearing or grading shall be prohibited during the wet season (November 1 through May 1); (b) The proposed trail shall not decrease the existing factor of safety within the active landslide hazard area, or any required buffer; (c) The proposed trail cannot be located outside of the active landslide hazard area or its associated buffer due to topographic or site constraints; (d) The proposed trail is for non-vehicular use only, and is no wider than four feet; (e) Trails shall not be sited within active landslide hazards or their associated buffers when there is such a high risk of landslide activity that use of the trail would be hazardous; (f) Trails shall be designed and constructed using an engineered drainage system or other methods to prevent the trail from channeling water. b. No small projects waivers as described in TMC § 13.11.730B are allowed in active landslide hazard areas and their buffers. E. Seismic Hazard Areas — Standards. 1. A geotechnical report consistent with the requirements of TMC § 13.11.730J shall be prepared for structures and improvements in a seismic hazard area. All developments shall be required to comply with the requirements of the most recently adopted edition of the International Building Code. The following types of projects will not require a geotechnical report; a. Construction of new buildings with less than 1,000 square feet footprint of floor or roof area, whichever is greater, and which are not designed for human occupancy, such as storage or utility spaces, and are not residential structures or spaces used as places of employment or public assembly. b. Additions to existing residences, including decks that have a maximum 250 square feet footprint of building, deck or roof area, whichever is greater. c. Installation of fences where they do not impede emergency access. 2. The exceptions above may not apply to areas that are also landslide hazard areas. F. Volcanic Hazard Areas — Standards. 1. New developments in volcanic hazard areas shall be required to submit an evacuation and emergency management plan, with the exception of the following: a. Construction of new buildings with less than 1,000 square feet of floor area or roof area, whichever is greater, and which are not designed for human occupancy, such as storage or utility spaces, and are not residential structures or used as places of employment or public assembly; b. Additions to existing residences, including decks that have a maximum 250 square feet footprint of bilding, deck or roof area, whichever is greater; and c. Installation of fences where they do not impede emergency egress. G. Mine Hazard Areas — Standards. Essential facilities, as defined by the currently adopted version of International Building Code, are not permitted in the area of the former railroad tunnel. Other development within 50 feet of the mapped location of the former railroad tunnel shall be required to perform a hazard analysis that includes the information specified in § 13.11.730J. Mine hazards discovered and others not identified here may be required to perform a hazard analysis. H. Tsunami Hazard Areas — Standards. Development in tsunami and seiche hazard areas shall comply with the zoning and Building Code requirements of the TMC. There are no other specific development standards for tsunami hazard or seiche hazard areas. I. Approval of geologic hazard area modification. Modifications to geologic hazard critical areas and their associated buffers shall only be approved if the Director determines that the modification: 1. Will not increase the threat of the geological hazard to adjacent properties over conditions that would exist if the provision of this part were not modified; 2. Will not adversely impact other critical areas; 3. Shall not decrease the factor of safety for landslide occurrences below the limits of 1.5 for static conditions and 1.2 for dynamic conditions. Analysis of dynamic conditions shall be based on a minimum horizontal acceleration as established by the current version of the International Building Code; 4. Has been evaluated to meet life safety standards under anticipated conditions by a qualified geotechnical engineer or geologist, licensed in the State of Washington; 5. The applicant provides a geotechnical report prepared by a qualified professional demonstrating that modification of the critical area or critical area buffer will have no adverse impacts on stability of any adjacent slopes, and will not impact stability of any existing structures. Geotechnical reporting standards shall comply with the requirements of TMC § 13.11.730J; 6. Any modification complies with recommendations of the geotechnical report with respect to best management practices, construction techniques or other recommendations; 7. The proposed modification to the geologic hazard area or its associated buffer with any associated mitigation does not significantly impact habitat associated with species of local importance, or such habitat that could reasonably be expected to exist during the anticipated life of the development proposal if the area were regulated under this part. J. Geologic hazard assessment and geotechnical report requirements. 1. The following are general requirements for a geologic hazard assessment and geotechnical report. Depending on the scope and scale of the project, additional information may be required. It is the responsibility of the qualified geotechnical professional to address all factors, which in their opinion, are relevant to the site. a. Project information and report purpose: (1) Site address; (2) Vicinity Map; and (3) Purpose (e.g., feasibility, permit application, final design). b. Site and project description: (1) Site plan showing existing and proposed structures and site improvements, property lines, and existing contour lines based upon the best available data; (2) Site plan shall show crest (top) and toe of slope, limit of recommended buffer, and recommended setback limits as determined by a geotechnical engineer; (3) Surface conditions, including adjacent properties, structures, and rights-of-way; (4) Description of existing and/or proposed sewer drainage facilities (sanitary and stormwater) on or adjacent to site when these facilities affect or are affected by the proposed work; (5) Description of proposed structural and site improvements; (6) Floor and foundation grades; and (7) Anticipated excavation depths. c. Geology and geologic hazards: (1) Review of available literature, geologic maps; (2) Preliminary geologic hazard assessment (e.g., landslide-prone areas, peat settlement prone areas, liquefaction hazard areas); and (3) Landslide history, including review of GeoMap NW, DNR landslide inventory maps or City files. d. Field explorations and laboratory testing: (1) Exploration logs; (2) Field and laboratory testing results. e. Subsurface description: (1) Subsurface conditions; (2) Geologic profile and site development cross-sections; and (3) Groundwater evaluation and levels. f. Analyses: (1) Include soil properties, layering, and geometry; (2) Describe assumptions analysis methods, results and interpretation. g. Conclusions and recommendations: (1) Conceptual siting of structures and general recommendations; (2) Earthquake engineering; (3) Slope stability assessment including (a) existing conditions, construction phase, and post-construction phase, and (b) areas affected beyond the site as appropriate; (4) Foundation support recommendations (e.g., type, allowable bearing pressures, deep foundation capacities, settlement estimates); (5) Temporary excavation and/or shoring recommendations, impacts on adjacent properties including utilities and ROW; (6) Lateral earth pressure and resistance recommendations; (7) Grading and earthwork including site preparation, compaction requirements, fill specifications, sequencing of earthwork operations, wet weather considerations; (8) Temporary and permanent surface and subsurface drainage requirements, temporary and permanent dewatering, off-site effects; (9) Temporary and permanent erosion control; and (10) Other recommendations as needed. h. Plan review and minimum risk standards: (1) In landslide-prone critical areas, the following will be required with all permit applications: (a) A statement that the most recent plans and specifications submitted to the City have been reviewed and conform to the recommendations of the analysis and report and, provided that those conditions and recommendations are satisfied during the construction and use, the areas disturbed by construction or activity will be stabilized and remain stable and will not increase the potential for soil movement; and the risk of damage to the proposed development and from the development to adjacent properties from soil instability will be minimal. (2) In other areas designated by the Director as having high risk potential, the following shall be submitted: (a) A statement that the most recent plans and specifications submitted to the City have been reviewed and conform to the recommendations of the analysis and report, and provided that the conditions and recommendations are satisfied, the construction and development or activity will not increase the potential for soil movement; and the risk of damage to the proposed development and from the development to adjacent properties from soil instability will be minimal. 2. Additional reporting requirements in erosion or landslide hazard areas. The following are additional submittal requirements to those listed in subsection J.1.a, above, for a site located within an erosion or landslide hazard area. a. An evaluation of the erosion potential on the site during and after construction shall be submitted. It shall include recommendations for mitigation including retention of vegetation buffers and revegetation. The geotechnical engineer shall provide a statement identifying buffer areas at the top or toe of a slope based on geotechnical site constraints and the impacts of proposed construction methods on the stability of the slope, consistent with the minimum buffer requirements of this Program. b. The geotechnical engineer shall submit a statement in the soils report that the geotechnical elements of seismic design have been evaluated in accordance with the criteria and ground motions prescribed by the current version of the International Building Code for new structures or ASCE-31/41 for existing buildings. Slope stability analyses for erosion or landslide hazard areas shall be evaluated in accordance with the most current version of the International Building Code. The plan set for the project shall be reviewed by the geotechnical engineer for consistency with these design criteria. c. The geotechnical engineer shall make a recommendation as to which portion of the site is the most stable and the preferred location of the structure. The limits of the area of grading activity shall be identified in the recommendations. d. In general, no excavation will be permitted in erosion or landslide hazard areas during the typically wet winter months. When dirt disturbing activities, such as excavation or grading, is proposed, including the maintenance of open temporary slopes during the wet season as defined in TMC Chapter 2.19 or the City's Stormwater Management Manual, technical analysis shall be provided to assure that no environmental harm or safety issues would result. The technical analysis shall be submitted for approval by the Director and shall, at a minimum, consist of plans showing mitigation techniques and a letter from the geotechnical engineer. K. In addition to the information provided pursuant to the requirements of this Program, the Director may require third-party review if the professional opinions of an applicant's representative and the Department's reviewers cannot be reconciled. Third-party review requires the applicant's geotechnical and/or additional technical studies to be reviewed by an independent third party, selected by the Director and paid for by the applicant. The third-party review shall be conducted by a qualified professional geotechnical engineer.
( Ord. 27294 § 2, 2004-11-16 ; Ord. 27431 § 53, 2005-11-15 ; Ord. 28518 Ex. 5, 2018-06-26 ; Ord. 29114 , 2026-07-14 )
Ask a question about Tacoma law
Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.