§ 12.06A.250 — Permit fees

Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 12.06A.250

Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/04a334ee-2e3a-4042-9a21-b48e5c9eb23a

§ 12.06A.250: Permit fees.

Current standard fees for connecting electrical services to the Tacoma Power system, as well as the Permit fees and any penalties previously assessed, must be paid before an Electrical Permit will be issued. The Permit applicant is responsible to arrange for payment. Permit applications for which insufficient or no payment has been received will not be issued. Unpaid Permit submittals will be discarded by Tacoma Power if payment has not been received within 10 business days of receipt of application. Unless otherwise noted, when multiple inspections are required, the Permit fee shall not be less than $77 per 1/2 hour of inspection time. No inspection will be performed until the Permit application process is completed. Current standard fees for Electrical Permits and inspections by Tacoma Power are as follows: A. Residential. 1. Table A. Single-family dwelling and mobile home services, service changes, and service upgrades, fees are set forth in Table A below, and include branch circuit wiring from the service(s) or feeder(s). All wiring by the same Permit Holder on single family dwellings of 400 amps/4000 sq. ft. or less is included under the fees from Table A unless otherwise noted below. TABLE A Service/Feeder Ampacity and Square Footage | Permit Fees Column 1 | Column 2 | Column 3 Overhead Service - up to 2 inspections | Underground to Pole and Underground Service with underground wiring - up to 4 inspections | Feeder Only up to 2 inspections 1-200A and up to 2500 sq. ft. | $153 | $306 | $125 Up to 400A or up to 4000 sq. ft. | $230 | $382 | $140 Over 400A or over 4000 sq. ft. | Use TABLE B 2. Branch circuit alterations and repairs. The fee for 1 to 4 new circuits, circuit extensions, or alterations where the service or feeder is not modified, increased, relocated, or replaced: $89. Use Table A if service or feeder work is included. Each additional circuit: $10. Fee includes two inspections. 3. Service alterations and repairs. Minor alterations and repairs to an electrical service or PV system, including, but not limited to, the repair or replacement of one of the following: service panel, service mast, service entrance conductors, weather head, service attachment bracket, meter socket, main breaker, or utility disconnect: $77. If more than one item listed above is altered or replaced: $153. Fee includes one inspection. 4. Hardwired low voltage. Single-family Dwellings—Fees for low voltage control panels and devices, such as fire alarm systems, data systems, intrusion alarms, HVAC systems, thermostats, and similar systems: $77. Fee includes one inspection. 5. Temporary services 1-200 amps single phase: $77. Fee includes one inspection. Temporary services over 200 amps or three phase and systems with feeders: Table B. Temporary services are permitted for use up to 90 days or the duration of a permitted construction project. 6. Residential swimming pool (In addition to any other fees listed): $230. Fee includes three inspections. 7. Generator transfer panel and equipment: $105. Fee includes one inspection. 8. PV systems: $153. Fee includes two inspections. B. Commercial and industrial. 1. Table B. The Permit fee for all commercial and industrial work, multifamily dwelling installations, and single family dwellings exceeding 400 amps or 4000 square feet shall be derived from Table B. Proof of electrical work value must be submitted at the time of application. Proof may be established by presenting a signed contract or a priced itemization of the work to be performed. The electrical work value shall be the reasonably documented value of all labor, material, fittings, apparatus, and the like, whether actually paid for or not, supplied by the Permit Holder and/or installed by the Permit Holder as a part of, or in connection with, a complete electrical system, but which does not include the cost of utilizing equipment connected to the electrical system. If a signed contract or other substantial proof of value is not submitted at the time of Permit application, the value may be established by Tacoma Power’s Electrical Inspection Office using modern construction cost-estimating techniques. If the reported work value is determined by Tacoma Power’s electrical inspection office to be significantly less than what was reported at the time the Permit was purchased, the Permit fee amount will be increased to reflect the corrected actual value and a charge for the time to determine such value will be assessed to the Permit fee. A fee adjustment shall be made for all change orders and field changes that increase the value. All fees must be paid before final electrical inspection approval of the project. TABLE B Value of Electrical Construction | Permit Fees $0 - $1,000 | $133 for the first $1,000 or fraction thereof. $1,001 - $5,000 | $133 for the first $1,000 plus $5.35 for each additional $100 or fraction thereof. $5,001 - $50,000 | $347 for the first $5,000 plus $2.70 for each additional $100 or fraction thereof. $50,001 - $100,000 | $1,562 for the first $50,000 plus $2 for each additional $100 or fraction thereof. $100,001 - $250,000 | $2,562 for the first $100,000 plus $12 for each additional $1,000 or fraction thereof. $250,001 - $500,000 | $4,362 for the first $250,000 plus $10.70 for each additional $1,000 or fraction thereof. $500,001 - $750,000 | $7,037 for the first $500,000 plus $9.40 for each additional $1,000 or fraction thereof. $750,001 - $1,000,000 | $9,387 for the first $750,000 plus $8 for each additional $1,000 or fraction thereof. $1,000,001 - $2,000,000 | $11,387 for the first $1,000,000 plus $7.35 for each additional $1,000 or fraction thereof. $2,000,001 - $3,000,000 | $18,737 for the first $2,000,000 plus $6.65 for each additional $1,000 or fraction thereof. $3,000,001 - $4,000,000 | $25,387 for the first $3,000,000 plus $6 for each additional $1,000 or fraction thereof. $4,000,001 - $5,000,000 | $31,387 for the first $4,000,000 plus $5.35 for each additional $1,000 or fraction thereof. $5,000,001 - $50,000,000 | $36,737 for the first $5,000,000 plus $4.65 for each additional $1,000 or fraction thereof. $50,000,001 - $100,000,000 | $245,987 for the first $50,000,000 plus $4 for each additional $1,000 or fraction thereof. $100,000,001 and up | $445,987 for the first $100,000,000 plus $3.35 for each additional $1,000 or fraction thereof. 2. Lighting retrofit projects limited to the exchange of fixtures and/or ballasts. Minimum fee per 5,000 sq. ft. of Building: $153. Each additional 1,000 sq. ft. or fraction of: $16. 3. Traffic signals. Traffic signal and street lighting service only. (If street lighting is inspected by authorized cities or WSDOT): $153. All others: Table B. 4. Signs. Each sign or first field installed neon transformer: $77. Each additional sign or field installed neon transformer: $28. Fee includes one inspection. 5. Carnival, circus, fair, trade shows, or similar events. First ten of rides, generators, concessions, gaming shows, displays, or booths: $181. Each additional: $10. C. Hardwired low voltage – Commercial/Industrial. Fees for low voltage control panels and devices, such as fire alarm systems, data systems, intrusion alarms, HVAC systems, thermostats, communication systems, emergency control systems, and similar systems are as follows: Minimum fee per 10,000 sq. ft. of Building: $153. Each additional 1,000 sq. ft. or fraction of: $16. D. Overtime. Overtime inspections including, but not limited to, call outs, weekend inspections, and after hours work must be scheduled with Tacoma Power’s Electrical Inspection Office a minimum of three business days in advance. In addition to the regular Permit fee, a fee for an overtime inspection is required as follows: 1. Unscheduled. Outside of an electrical inspector’s regular working hours, the minimum fee for an inspection shall be $660 for the first two hours, portal to portal, plus $220 for each hour thereafter. The fee must be paid the next business day. 2. Scheduled. Outside of an electrical inspector’s regular working hours, the minimum fee for an inspection shall be $440 for the first two hours, portal to portal, plus $220 for each hour thereafter. The fee of $440 must be paid 48 hours in advance of the scheduled inspection, and any remaining fee must be paid the next business day. 3. Requested inspections that extend beyond the electrical inspector’s regular working hours shall be at the minimum rate of $220 per hour, portal to portal. E. Annual permit. Pursuant to section 12.06A.350, annual Permits are available to commercial and industrial customers employing their own electrical maintenance staff. An annual Permit may be purchased in lieu of individual Permits for maintenance on each job performed. Annual Permits may be purchased by an electrical contractor to perform maintenance work at a commercial and industrial location if, at the time of application, a valid copy of the electrical contractor’s yearly maintenance contract with the customer is submitted to Tacoma Power and the term and nature of work under such contract is consistent, as determined in the sole discretion of Tacoma Power, with the term and purpose of the annual Permit. Applications for annual Permits submitted without proof of required employment status or a valid maintenance contract will not be accepted. Work performed under an annual Permit is limited to the installation of not more than two new feeders or circuits rated 100 amps or less, and the maintenance, repair, retrofit, or replacement of conductors and equipment. Annual Permits do not include the installation of new, exchanged, or upgraded service equipment, electrical work installed as part of new or added square footage, facility expansion, remodel, or where, except as noted above, load is increased. The annual Permit fee is calculated per Table C. TABLE C Number of one-hour Inspection units | Fee 12 | $1,833 13-24 | $3,666 25-36 | $5,499 37-52 | $7,942 F. Miscellaneous fees. 1. Wrong meter address or location. A Permit is required to correct or inspect incorrect meter addressing by the Owner or Owner’s agent: $77 per 1/2 hour. Overtime rates may apply. 2. Miscellaneous inspection (other): $77 per 1/2 hour. 3. Variance. A processing fee for granting an electrical installation as outlined in Section 12.06A.155 of this chapter: $177. 4. Required inspection on services off for one year or more: $77. Fee includes one inspection. An additional Permit, fees, and inspections may be required if electrical deficiencies exist on the Premises.

( Ord. 28443 Ex. A, 2017-08-01 ; Ord. 28689 Ex. A, 2020-09-01 ; Ord. 28846 Ex. A, 2022-11-22 ; Ord. 28995 Ex. B, 2024-12-03 ; Ord. 29026 Ex. A, 2025-03-25 )

Ask a question about Tacoma law

Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.