§ 6B.60.060 — Exemptions from certificate requirements

Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 6B.60.060

Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/a2e1efa7-792e-4445-8df5-42c04abb2b0a

§ 6B.60.060: Exemptions from certificate requirements.

The following installations shall not require a certified operator: A. | Any boiler or steam engine subject to federal regulations; B. | Heating boilers in Group R, Division 1 occupancies of less than six units; Group R, Division 3 occupancies; and Group M occupancies, as defined in the Building Code, as now or hereafter amended; C. | Low-pressure hot water, low-pressure steam, and hot water supply boiler plants having inputs of less than 2,500,000 Btu per hour; D. | Any boiler having an input of less than 100,000 Btu per hour and a maximum pressure of 100 psi or less; E. | Potable water heaters; F. | Any boiler not subject to reinspection by the Washington State Boiler Code; and G. | Any wastewater treatment plant low-pressure hot water heating boiler maintained and operated as directed by a person with a Wastewater Operator Certificate Group II or above. Boiler operator certificates shall not be required for any person in charge of, or operating, the following: A. | Any boiler or steam engine subject to federal regulations; B. | Any boiler not subject to reinspection by the Washington State Boiler Code; C. | Low-pressure hot water, low-pressure steam, and hot water supply boiler plants having inputs of less than 2,500,000 Btu per hour; D. | Any boiler having an input of less than 100,000 Btu per hour and a maximum pressure of 100 psi or less; E. | Potable water heaters; F. | Any boiler plant exceeding an aggregate of 500 million Btu per hour input, when the following are also in place: 1. | The facility has a boiler operator training program commensurate with the size of its operation; 2. | Degreed engineers supervise the maintenance and operation of the boiler plant; and 3. | An independent authorized inspector, such as a Factory Mutual Global Insurance Company, regularly inspects boiler plant maintenance and operation.

( Ord. 27297 § 1, 2004-11-23 ; Ord. 28220 Ex. A, 2014-05-06 )