§ 15.27.314 — Critical areas report requirements

Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 15.27.314

Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/57e3aa9d-d31b-4b44-b46a-2d2e563b55bb

§ 15.27.314: Critical areas report requirements.

A. The administrative official or designee may require a critical areas report, paid for by the applicant, when it is determined necessary. B. A qualified professional shall prepare the report consistent with best available science. The intent of these provisions is to require a reasonable level of technical study and analysis sufficient to protect critical areas. The analysis shall be appropriate to the value or sensitivity of a particular critical area and relative to the scale and potential impacts of the proposed activity. C. The critical area report shall: 1. Demonstrate the proposal is consistent with the purposes and standards of this chapter; 2. Describe all potential risks to critical areas, and assess impacts on the critical area from the activities and uses proposed; and 3. Identify mitigation and protective measures. D. The critical areas report shall include information addressing the supplemental report requirements (see YMC § 15.27.315). E. The administrative official or designee shall review the critical areas report for completeness and accuracy and shall consider the recommendations and conclusions to assist in making decisions on development authorizations, appropriate mitigation, and protective measures. F. Critical areas reports shall be valid for a period of five years, unless it can be demonstrated that a previous report is adequate for current analysis. Reports prepared for adjacent properties may be utilized for current analysis only when it can be shown through a supplemental report or site investigation that conditions on site are unchanged. G. The administrative official or designee may require the preparation of a new critical area assessment or a supplemental report if the initial assessment is in error. H. The administrative official or designee may reject or request revision of the critical areas report when it can be demonstrated that the assessment is inaccurate, incomplete or does not fully address the critical areas impacts involved. I. Applicants shall provide reports and maps to the city in both electronic and paper formats. In addition, all critical area delineations/maps shall be provided to the city by means of a GPS projected coordinate system data set, such as NAD 27 or NAD 83. The city may waive this requirement for single-family developments. Applicants are encouraged to coordinate with the administrative official or designee regarding electronic submittal guidelines. J. At a minimum, a critical areas report shall include the following information: 1. A site plan showing the proposed development footprint and clearing limits, and all relevant critical areas and buffers; 2. A written summary of the critical areas, including their size, type, classification or rating, condition, disturbance history, and functions and values. For projects on or adjacent to geologically hazardous areas or areas subject to high floodwater depth or velocity, the description shall identity the type and characteristics of the hazard; 3. An analysis of potential adverse impacts and how they will be mitigated or avoided. Geologically hazardous areas are additionally required to assess the risks posed by the development to critical areas, public and private properties, and both associated and unassociated nearby facilities and uses; 4. When impacts cannot be avoided, the report shall include a plan describing mitigation to replace critical area functions and values. For projects on or adjacent to geologically hazardous areas or areas subject to high floodwater depth or velocity, the mitigation shall additionally address the site, other public and private properties, and both associated and unassociated nearby facilities and uses potentially affected; 5. The dates, names, and qualifications of the persons preparing the report and documentation of analysis methods including any fieldwork performed on the site; and 6. Additional reasonable information requested by the administrative official or designee. K. A critical area report may be supplemented by or composed, in whole or in part, of any reports or studies required by other laws and regulations or previously prepared for and applicable to the development proposal site. L. The administrative official or designee may limit the geographic area of the critical area report as appropriate. M. Compensatory Mitigation Plans. When compensatory mitigation, as described in YMC § 15.27.307, is proposed for wetlands or fish and wildlife habitat conservation areas, the applicant shall submit a mitigation plan as part of the critical area report, which includes: 1. A written report identifying environmental goals and objectives of the proposed compensation including a description of: a. The anticipated impacts to the critical areas; b. The mitigating actions proposed; c. The purpose of the compensation measures, including site selection criteria; d. The compensation goals and objectives; e. The desired resource functions; f. Construction activities’ start and completion dates; and g. Analysis of anticipated success of the compensation project; 2. A review of the best available science supporting the proposed mitigation; 3. A description of the report and the author’s experience to date in restoring or creating the type of critical area report proposed; 4. Performance Standards. The mitigation plan shall include measurable specific criteria for evaluating the goals and objectives to ensure the mitigation project has been successfully attained; 5. Detailed Construction Documents. The mitigation documents shall include written specifications and plans describing the mitigation proposed, such as: a. The proposed construction sequence, timing, and duration; b. Grading and excavation details; c. Erosion and sediment control features; d. A planting plan specifying plant species, quantities, locations, sizes, spacing, and density; e. Measures to protect and maintain plants until established; and f. Documents should include scale drawings showing necessary information to convey both existing and proposed topographic data, slope, elevations, plants and project limits; 6. Monitoring Program. The mitigation plan shall include: a. A program for monitoring both construction of the compensatory project and its completion and survivability; b. A plan which details how the monitoring data will be evaluated to determine if the performance standards are being met; c. Reports as needed to document milestones, successes, problems, and contingency actions of the compensation project; and d. Monitoring for a period necessary to establish that performance standards have been met, but not for a period less than five years; 7. Contingency Plan. Identification of the potential courses of action, and any corrective measures to be taken if monitoring or evaluation indicates project performance standards are not being met; 8. Financial Guarantees. A financial guarantee ensuring fulfillment of the compensation project, monitoring program, and any contingency measures shall be posted in accordance with YMC § 15.27.321(A). N. Innovative Mitigation. 1. Advanced mitigation or mitigation banking are examples of alternative mitigation projects allowed under the provisions of this section. One or more applicants or an organization with demonstrated capability may undertake a mitigation project together if it is demonstrated that all of the following circumstances exist: a. Creation or enhancement of a larger system of critical areas and open space is preferable to the preservation of many individual habitat areas; b. The applicant demonstrates the organizational and fiscal capability to act cooperatively; c. The applicant demonstrates that long-term management of the habitat area will be provided; d. There is a clear potential for success of the proposed mitigation at the identified site; e. There is a clear likelihood for success of the proposed plan based on supporting scientific information and demonstrated experience in implementing similar plans; f. The proposed project results in equal or greater protection and conservation of critical areas than would be achieved using parcel-by-parcel regulations and/or traditional mitigation approaches; g. The plan is consistent with the general purpose and intent of this section; h. The plan shall contain relevant management strategies which are within the scope of this section; and i. The plan shall contain clear and measurable standards for achieving compliance with the purposes of this section, a description of how such standards will be monitored and measured over the life of the plan, and a fully funded contingency plan if any element of the plan does not meet standards for compliance. 2. Conducting mitigation as part of a cooperative process does not reduce or eliminate the required wetland replacement ratios. 3. Projects that propose compensatory wetland mitigation shall also use the standards in YMC § 15.27.604. For those situations where a mitigation bank may provide an opportunity for mitigation, the requirements in YMC § 15.27.605 shall apply.

( Ord. 2008-46 § 1 (part), 2008 ; Ord. 2016-029 § 1 (Exh. A) (part), 2016 ; Ord. 2017-017 § 2 (Exh. B) (part), 2017 ; Ord. 2021-021 § 2 (Exh. A), 2021 )

Ask a question about Yakima law

Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.