For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.27.315 — Supplemental report requirements for specific critical areas

Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 15.27.315

Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/73725d2a-27cf-464f-85b6-0941d3bdf0e6

§ 15.27.315: Supplemental report requirements for specific critical areas.

A. Fish and Wildlife Habitat Conservation Areas. When a critical areas report is required for a fish and wildlife habitat conservation area, it shall include the following: 1. A habitat and native vegetation conservation strategy that addresses methods to protect the functional properties listed in YMC § 15.27.504; 2. Where proposed construction lies within an immediate zone of potential channel migration, a hydrologic analysis report may be required. The report shall assume the conditions of the one-hundred-year flood, include on-site investigative findings, and consider historical meander characteristics in addition to other pertinent facts and data; and 3. A discussion of any federal, state or local management recommendations which have been developed for the species or habitats in the area, and how they will be incorporated into the project. B. Wetlands. When a critical areas report is required for wetlands, it shall include the following: 1. The exact location of a wetland’s boundary and wetland rating as determined through the performance of a field investigation by a qualified wetland professional applying the approved federal wetland delineation manual and applicable regional supplements as required by RCW 36.70A.175 and the most recent version of the Washington State Wetland Rating System for Eastern Washington; 2. All delineated wetlands and required buffers within two hundred feet of the project area shall be shown on the site plan. Available information should include, but not be limited to, aerial photos, land-based photos, soils maps, or topographic maps; 3. An analysis of the wetlands including the following site-related information: a. A statement specifying the accuracy of the report and all assumptions made and relied upon; b. Documentation of fieldwork performed on the site, including field data sheets for delineations, wetland rating forms, baseline hydrologic data, etc.; c. A description of the methodologies used to conduct the wetland delineations or impact analyses, including references; d. Wetland category, including vegetative, faunal, and hydrologic characteristics; and 4. For projects that will affect the wetland or buffer, provide the following: a. A habitat and native vegetation conservation strategy that addresses methods to protect or enhance on-site habitat and wetland functions and values listed in YMC §§ 15.27.504 and 15.27.603(A); and b. Mitigation sequencing, pursuant to YMC § 15.27.307, to avoid, minimize, and mitigate impacts shall result in “no net loss” of acreage or functional values of wetlands and shall follow the guidance provided in YMC § 15.27.604. C. Geologically Hazardous Areas. When a critical areas report is required for a geologically hazardous area, it shall include the following: 1. A description of the site features, including surface and subsurface geology; 2. A description of the geologic processes and hazards affecting the property, including a determination of the actual hazard types for any suspected and risk unknown hazards identified in the affirmative determination of hazard; 3. A description of the vulnerability of the site to seismic and other geologic processes and hazards; and 4. A description of any potential hazards that could be created or exacerbated as a result of site development; 5. For developments in or affecting landslide hazard areas the report shall also include: a. Assessments and conclusions regarding slope stability including the potential types of landslide failure mechanisms (e.g., debris flow, rotational slump, translational slip, etc.) that may affect the site. The stability evaluation shall also consider dynamic earthquake loading and shall use a minimum horizontal acceleration as established by the current version of YMC Title 11 (Buildings); b. An analysis of slope recession rate shall be presented in those cases where stability is impacted by stream meandering or other forces acting on the toe of the slope; and c. Description of the run-out hazard of landslide debris to the proposed development that starts up-slope and/or the impacts of landslide run-out on down-slope properties and critical areas. D. Flood Hazards. Prior to authorization of any construction within a floodplain, which can be anticipated to displace floodwaters or alter the depth or velocity of floodwaters during the base flood, an engineering report shall be prepared by a licensed engineer in the state of Washington that establishes any new flood elevations that would result for the one-hundred-year flood frequency if the project were implemented. E. Critical Aquifer Recharge Areas. The approach of the city critical area regulations is to require a level of study and analysis commensurate with potential risks to wellhead protection zones associated with particular sites and particular proposals. At a minimum, all applicants shall review the history of the site and conduct a surface reconnaissance. The purpose of a critical aquifer recharge area report is to evaluate the actual geologic conditions and determine the site’s proximity to or location within a wellhead protection zone; evaluate the safety and appropriateness of proposed activities; and recommend appropriate construction practices, monitoring programs, and other mitigation measures required to ensure achievement of the purpose and intent of these regulations. The information required by this report should be coordinated with the study and reporting requirements for any other critical areas located on the site. A critical aquifer recharge area report shall be prepared by a qualified professional who is a hydrogeologist, geologist, or engineer who is licensed in the state of Washington and who has experience in preparing hydrogeologic assessments. 1. Level One Hydrological Assessment. At sites located within Wellhead Protection Zones 1 through 3, defined in Section 15.27.820(A)(1), a critical aquifer recharge areas report shall contain a level one hydrological assessment which includes the following site- and proposal-related information at a minimum: a. Information regarding geologic and hydrogeologic characteristics of the site, including the surface location of all critical aquifer recharge areas located on site or immediately adjacent to the site, and permeability of the unsaturated zone based on existing data. b. Groundwater depth, flow direction, and gradient based on available information. c. Currently available data on wells and springs within one thousand three hundred feet of the project area. d. Location of other critical areas, including surface waters, within one thousand three hundred feet of the project site. e. Available historic water quality data for the area to be affected by the proposed activity. f. BMPs proposed to be utilized. 2. Level Two Hydrogeologic Assessment. a. A level two hydrogeologic assessment shall be required for any of the following proposed activities at sites located within Wellhead Protection Zones 1 through 3: i. Activities that result in five thousand square feet or more impervious site area. ii. Activities that divert, alter, or reduce the flow of surface or groundwaters, including dewatering or otherwise reduce the recharging of the aquifer. iii. The storage, handling, treatment, use, production, recycling, or disposal of deleterious substances or hazardous materials, other than household chemicals used according to the directions specified on the packaging for domestic applications. iv. The use of injection wells, including on-site septic systems, except those domestic septic systems releasing less than fourteen thousand five hundred gallons of effluent per day and that are limited to a maximum density of one system per one acre. v. Any other activity determined by the director of community development likely to have an adverse impact on groundwater quality or quantity, or on the recharge of the aquifer. b. A level two hydrogeologic assessment shall include the following site- and proposal-related information at a minimum, in addition to the requirements for a level one hydrogeological assessment: i. Historic water quality and elevation data for the area to be affected by the proposed activity compiled for at least the previous five-year period. ii. Groundwater monitoring plan provisions. iii. Discussion of the effects of the proposed project on the groundwater quality and quantity, including: (a) Predictive evaluation of groundwater withdrawal effects on nearby wells and surface water features. (b) Predictive evaluation of contaminant transport based on potential releases to groundwater. iv. Identification of the type and quantities of any deleterious substances or hazardous materials that will be stored, handled, treated, used, produced, recycled, or disposed of on the site, including but not limited to materials, such as elevator lift/hydraulic fluid, hazardous materials used during construction, materials used by the building occupants, proposed storage and manufacturing uses, etc. v. Proposed methods of storing any of the above substances, including containment methods to be used during construction and/or use of the proposed facility. vi. Proposed plan for implementing YMC § 15.27.820(C)(4)(f), Protection Standards During Construction. vii. A spill plan that identifies equipment and/or structures that could fail, resulting in an impact. Spill plans shall include provisions for regular inspection, repair, and replacement of structures and equipment that could fail. viii. A complete discussion of past environmental investigations, sampling, spills, or incidents that may have resulted in or contributed to contaminated soil or groundwater at the site. Attach copies of all historical and current reports, and sampling results.

( Ord. 2008-46 § 1 (part), 2008 ; Ord. 2016-029 § 1 (Exh. A) (part), 2016 ; Ord. 2017-017 § 2 (Exh. B) (part), 2017 ; Ord. 2021-021 § 2 (Exh. A), 2021 )

Ask a question about Yakima law

Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.