§ 15.27.605 — Compensatory mitigation
Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 15.27.605
Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/6702c559-2a03-49e4-8a91-2c31eb7e8e05
§ 15.27.605: Compensatory mitigation.
A. Mitigation Sequencing. Before impacting any wetland or its buffer, an applicant shall demonstrate that the following actions have been taken. Actions are listed in the order of preference: 1. Avoid the impact altogether by not taking a certain action or parts of an action. 2. Minimize impacts by limiting the degree or magnitude of the action and its implementation, by using appropriate technology, or by taking affirmative steps to avoid or reduce impacts. 3. Rectify the impact by repairing, rehabilitating, or restoring the affected environment. 4. Reduce or eliminate the impact over time by preservation and maintenance operations. 5. Compensate for the impact by replacing, enhancing, or providing substitute resources or environments. 6. Monitor the required compensation and take remedial or corrective measures when necessary. B. Requirements for Compensatory Mitigation. 1. Compensatory mitigation for alterations to wetlands shall be used only for impacts that cannot be avoided or minimized and shall achieve equivalent or greater biologic functions. Compensatory mitigation plans shall be consistent with Wetland Mitigation in Washington State—Part 2: Developing Mitigation Plans—Version 1, (Ecology Publication No. 06-06-011b, Olympia, WA, March 2006 or as revised), and Selecting Wetland Mitigation Sites Using a Watershed Approach (Eastern Washington) (Publication No. 10-06-07, November 2010). 2. Mitigation ratios may also be determined using the credit/debit tool described in Calculating Credits and Debits for Compensatory Mitigation in Wetlands of Eastern Washington: Final Report (Ecology Publication No. 11-06-045, August 2012), consistent with subsection H of this section. 3. Compensating for Lost or Affected Functions. Compensatory mitigation shall address the functions affected by the proposed project, with an intention to achieve functional equivalency or improvement of functions. The goal shall be for the compensatory mitigation to provide similar wetland functions as those lost, except when either: a. The lost wetland provides minimal functions, and the proposed compensatory mitigation action(s) will provide equal or greater functions or will provide functions shown to be limiting within a watershed through a formal Washington State watershed assessment plan or protocol; or b. Out-of-kind replacement of wetland type or functions will best meet watershed goals formally identified by the city, such as replacement of historically diminished wetland types. C. Approaches to Compensatory Mitigation. Mitigation for lost or diminished wetland and buffer functions shall rely on the approaches listed below. 1. Wetland Mitigation Banks. Credits from a certified wetland mitigation bank may be used to compensate for impacts located within the service area specified in the mitigation bank instrument. Use of credits from a wetland mitigation bank certified under Chapter 173-700 WAC is allowed if: a. The approval authority determines that it would provide appropriate compensation for the proposed impacts; and b. The impact site is located in the service area of the bank. c. The proposed use of credits is consistent with the terms and conditions of the certified mitigation bank instrument. d. Replacement ratios for projects using bank credits are consistent with replacement ratios specified in the certified mitigation bank instrument. 2. In-Lieu Fee Mitigation. Credits from an approved in-lieu-fee program may be used when all of the following apply: a. The approval authority determines that it would provide environmentally appropriate compensation for the proposed impacts. b. The proposed use of credits is consistent with the terms and conditions of the approved in-lieu-fee program instrument. c. Projects using in-lieu-fee credits shall have debits associated with the proposed impacts calculated by the applicant’s qualified wetland professional using the credit assessment method specified in the approved instrument for the in-lieu-fee program. d. The impacts are located within the service area specified in the approved in-lieu-fee instrument. 3. Permittee-Responsible Mitigation. In this situation, the permittee performs the mitigation after the permit is issued and is ultimately responsible for implementation and success of the mitigation. Permittee-responsible mitigation may occur at the site of the permitted impacts or at an off-site location within the same watershed. Permittee-responsible mitigation shall be used only if the applicant’s qualified wetland professional demonstrates to the approval authority’s satisfaction that the proposed approach is ecologically preferable to use of a bank or ILF program, consistent with the criteria in this section. D. Types of Compensatory Mitigation. Mitigation for lost or diminished wetland and buffer functions shall rely on a type listed below in order of preference. A lower-preference form of mitigation shall be used only if the applicant’s qualified wetland professional demonstrates to the approval authority’s satisfaction that all higher-ranked types of mitigation are not viable, consistent with the criteria in this section. 1. Restoration. The manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural or historic functions to a former or degraded wetland. For the purpose of tracking net gains in wetland acres, restoration is divided into: a. Reestablishment. The manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural or historic functions to a former wetland. Reestablishment results in a gain in wetland acres (and functions). Activities could include removing fill material, plugging ditches, or breaking drain tiles. b. Rehabilitation. The manipulation of the physical, chemical, or biological characteristics of a site with the goal of repairing natural or historic functions of a degraded wetland. Rehabilitation results in a gain in wetland function but does not result in a gain in wetland acres. Activities could involve breaching a dike to reconnect wetlands to a floodplain or return tidal influence to a wetland. 2. Establishment (Creation). The manipulation of the physical, chemical, or biological characteristics of a site to develop a wetland on an upland or deepwater site where a wetland did not previously exist. Establishment results in a gain in wetland acres. Activities typically involve excavation of upland soils to elevations that will produce a wetland hydroperiod, create hydric soils, and support the growth of hydrophytic plant species. If a site is not available for wetland restoration to compensate for expected wetland and/or buffer impacts, the approval authority may authorize creation of a wetland and buffer upon demonstration by the applicant’s qualified wetland professional that: a. The hydrology and soil conditions at the proposed mitigation site are conducive for sustaining the proposed wetland and that creation of a wetland at the site will not likely cause hydrologic problems elsewhere; b. Adjacent land uses and site conditions do not jeopardize the viability of the proposed wetland and buffer (e.g., due to the presence of invasive plants or noxious weeds, stormwater runoff, noise, light, or other impacts); and c. The proposed wetland and buffer will eventually be self-sustaining with little or no long-term maintenance. 3. Enhancement. The manipulation of the physical, chemical, or biological characteristics of a wetland site to heighten, intensify, or improve specific function(s) or to change the growth stage or composition of the vegetation present. Enhancement is undertaken for specified purposes such as water quality improvement, floodwater retention, or wildlife habitat. Enhancement results in a change in some wetland functions and can lead to a decline in other wetland functions, but does not result in a gain in wetland acres. Activities typically consist of planting vegetation, controlling nonnative or invasive species, modifying site elevations or the proportion of open water to influence hydroperiods, or some combination of these activities. Applicants proposing to enhance wetlands or associated buffers shall demonstrate how the proposed enhancement will increase the wetland’s/buffer’s functions, how this increase in function will adequately compensate for the impacts, and how existing wetland functions at the mitigation site will be protected. 4. Protection/Maintenance (Preservation). Removing a threat to, or preventing the decline of, wetland conditions by an action in or near a wetland. This includes the purchase of land or easements, or repairing water control structures or fences. This term also includes activities commonly associated with the term “preservation.” Preservation does not result in a gain of wetland acres. Permanent protection of a Category I or II wetland and associated buffer at risk of degradation can be used only if: a. The approval authority determines that the proposed preservation is the best mitigation option; b. The proposed preservation site is under threat of undesirable ecological change due to permitted, planned, or likely actions that will not be adequately mitigated under existing regulations; c. The area proposed for preservation is of high quality or critical for the health of the watershed or basin due to its location. Some of the following features may be indicative of high-quality sites: i. Category I or II wetland rating (using the wetland rating system for Eastern Washington); ii. Rare or irreplaceable wetland type (for example, bogs, mature forested wetlands, estuarine wetlands) or aquatic habitat that is rare or a limited resource in the area; iii. The presence of habitat for priority or locally important wildlife species; or also list has provides biological and/or hydrological connectivity; iv. Provides biological and/or hydrological connectivity; v. Priority sites in an adopted watershed plan. d. Permanent preservation of the wetland and buffer will be provided through a conservation easement or tract held by an appropriate natural land resource manager, such as a land trust. e. The approval authority may approve other legal and administrative mechanisms in lieu of a conservation easement if it determines they are adequate to protect the site. f. Ratios for preservation in combination with other forms of mitigation generally range from ten-to-one to twenty-to-one, as determined on a case-by-case basis, depending on the quality of the wetlands being impacted and the quality of the wetlands being preserved. Ratios for preservation as the sole means of mitigation generally start at twenty-to-one. E. Location of Compensatory Mitigation. Compensatory mitigation actions shall generally be conducted within the same subdrainage basin and on the site of the alteration except when the applicant can demonstrate that off-site mitigation is ecologically preferable. The following criteria will be evaluated when determining whether the proposal is ecologically preferable. When considering off-site mitigation, preference should be given to using alternative mitigation, such as a mitigation bank, an in-lieu-fee program, or advance mitigation. 1. There are no reasonable opportunities on site or within the sub-drainage basin (e.g., on-site options would require elimination of high-functioning upland habitat), or opportunities on site or within the subdrainage basin do not have a high likelihood of success based on a determination of the capacity of the site to compensate for the impacts. Considerations should include: anticipated replacement ratios for wetland mitigation, buffer conditions and proposed widths, available water to maintain anticipated hydrogeomorphic classes of wetlands when restored, proposed flood storage capacity, and potential to mitigate riparian fish and wildlife impacts (such as connectivity). 2. On-site mitigation would require elimination of high-quality upland habitat. 3. Off-site mitigation has a greater likelihood of providing equal or improved wetland functions than the altered wetland. 4. Off-site locations shall be in the same subdrainage basin unless: a. Established watershed goals for water quality, flood storage or conveyance, habitat, or other wetland functions have been established by the city and strongly justify location of mitigation at another site; or b. Credits from a state-certified wetland mitigation bank are used as compensation, and the use of credits is consistent with the terms of the certified bank instrument; c. Fees are paid to an approved in-lieu-fee program to compensate for the impacts. d. The design for the compensatory mitigation project needs to be appropriate for its location (i.e., position in the landscape). Therefore, compensatory mitigation should not result in the creation, restoration, or enhancement of an atypical wetland. F. Timing of Compensatory Mitigation. 1. It is preferred that compensatory mitigation projects be completed prior to activities that will disturb wetlands. At the least, compensatory mitigation shall be completed immediately following disturbance and prior to use or occupancy of the action or development. Construction of mitigation projects shall be timed to reduce impacts to existing fisheries, wildlife, and flora. 2. The administrator may authorize a one-time temporary delay in completing construction or installation of the compensatory mitigation when the applicant provides a written explanation from a qualified wetland professional as to the rationale for the delay. An appropriate rationale would include identification of the environmental conditions that could produce a high probability of failure or significant construction difficulties (e.g., project delay lapses past a fisheries window, or installing plants should be delayed until the dormant season to ensure greater survival of installed materials). The delay shall not create or perpetuate hazardous conditions or environmental damage or degradation, and the delay shall not be injurious to the health, safety, or general welfare of the public. The request for the temporary delay must include a written justification that documents the environmental constraints that preclude implementation of the compensatory mitigation plan. The justification must be verified and approved by the city. G. Wetland Mitigation Ratios. Category and Type of Wetland | Creation or Reestablishment | Rehabilitation | Enhancement Category I: Bog, natural heritage site | Not considered possible | Case by case | Case by case Category I: Mature forested | 6:1 | 12:1 | 24:1 Category I: Based on functions | 4:1 | 8:1 | 16:1 Category II | 3:1 | 6:1 | 12:1 Category III | 2:1 | 4:1 | 8:1 Category IV | 1.5:1 | 3:1 | 6:1 Ratios for rehabilitation and enhancement may be reduced when combined with one-to-one replacement through creation or reestablishment. See Table 1b, Wetland Mitigation in Washington State—Part 1: Agency Policies and Guidance—Version 1, (Ecology Publication No. 06-06-011a, Olympia, WA, March 2006 or as revised). See also subsection (D)(4) of this section for more information on using preservation as compensation. H. Credit/Debit Method. To more fully protect functions and values, and as an alternative to the mitigation ratios found in the joint guidance Wetland Mitigation in Washington State Parts I and II (Ecology Publication No. 06-06-011a-b, Olympia, WA, March, 2006), the administrator may allow mitigation based on the “credit/debit” method developed by the Department of Ecology in Calculating Credits and Debits for Compensatory Mitigation in Wetlands of Eastern Washington: Final Report (Ecology Publication No. 11-06-015, August 2012, or as revised). I. Compensatory Mitigation Plan. When a project involves wetland and/or buffer impacts, a compensatory mitigation plan prepared by a qualified professional shall be required, meeting the following minimum standards: 1. Wetland Critical Area Report. A critical area report for wetlands must accompany or be included in the compensatory mitigation plan and include the minimum parameters identified in YMC §§ 15.27.314 and 15.27.315(B). 2. Compensatory Mitigation Report. The report must include a written report and plan sheets that must contain, at a minimum, the following elements. Full guidance can be found in Wetland Mitigation in Washington State—Part 2: Developing Mitigation Plans (Version 1) (Ecology Publication No. 06-06-011b, Olympia, WA, March 2006 or as revised). a. The written report must contain, at a minimum: i. The name and contact information of the applicant; the name, qualifications, and contact information for the primary author(s) of the compensatory mitigation report; a description of the proposal; a summary of the impacts and proposed compensation concept; identification of all the local, state, and/or federal wetland-related permit(s) required for the project; and a vicinity map for the project. ii. Description of how the project design has been modified to avoid, minimize, or reduce adverse impacts to wetlands. iii. Description of the existing wetland and buffer areas proposed to be impacted. Include acreage (or square footage), water regime, vegetation, soils, landscape position, surrounding lands uses, and functions. Also describe impacts in terms of acreage by Cowardin classification, hydrogeomorphic classification, and wetland rating, based on YMC § 15.27.603, Wetland functions and rating. iv. Description of the compensatory mitigation site, including location and rationale for selection. Include an assessment of existing conditions: acreage (or square footage) of wetlands and uplands, water regime, sources of water, vegetation, soils, landscape position, surrounding land uses, and functions. Estimate future conditions in this location if the compensation actions are not undertaken (i.e., how would this site progress through natural succession?). v. Surface and subsurface hydrologic conditions, including an analysis of existing and proposed hydrologic regimes for enhanced, created, or restored compensatory mitigation areas. Include illustrations of how data for existing hydrologic conditions were used to determine the estimates of future hydrologic conditions. vi. A description of the proposed actions for compensation of wetland and upland areas affected by the project. Include overall goals of the proposed mitigation, including a description of the targeted functions, hydrogeomorphic classification, and categories of wetlands. vii. A description of the proposed mitigation construction activities and timing of activities. viii. Performance standards (measurable standards for years post-installation) for upland and wetland communities, a monitoring schedule, and a maintenance schedule and actions proposed by year. ix. A discussion of ongoing management practices that will protect wetlands after the development project has been implemented, including proposed monitoring and maintenance programs (for remaining wetlands and compensatory mitigation wetlands). x. A bond estimate for the entire compensatory mitigation project, including the following elements: site preparation, plant materials, construction materials, installation oversight, maintenance twice per year for up to five years, annual monitoring field work and reporting, and contingency actions for a maximum of the total required number of years for monitoring. xi. Proof of establishment of notice on title for the wetlands and buffers on the project site, including the compensatory mitigation areas. b. The scaled plan sheets for the compensatory mitigation must contain, at a minimum: i. Surveyed edges of the existing wetland and buffers, proposed areas of wetland and/or buffer impacts, location of proposed wetland and/or buffer compensation actions. ii. Existing topography, ground-proofed, at two-foot contour intervals in the zone of the proposed compensation actions if any grading activity is proposed to create the compensation area(s). Also existing cross-sections of on-site wetland areas that are proposed to be impacted, and cross-section(s) (estimated one-foot intervals) for the proposed areas of wetland or buffer compensation. iii. Conditions expected from the proposed actions on site, including future hydrogeomorphic types, vegetation community types by dominant species (wetland and upland), and future water regimes. iv. Required wetland buffers for existing wetlands and proposed compensation areas. Also, identify any zones where buffers are proposed to be reduced or enlarged outside of the standards identified in this chapter. v. A planting plan for the compensation area, including all species by proposed community type and water regime, size and type of plant material to be installed, spacing of plants, typical clustering patterns, total number of each species by community type, and timing of installation. 3. Buffer Mitigation Ratios. Impacts to buffers shall be mitigated at a minimum one-to-one ratio. Compensatory buffer mitigation shall replace those buffer functions lost from development. 4. Protection of the Mitigation Site. The area where the mitigation occurred and any associated buffer shall be located in a critical area tract or a conservation easement consistent with Part Six of this chapter. 5. Monitoring. Mitigation monitoring shall be required for a period necessary to establish that performance standards have been met, but not for a period less than five years. If a scrub-shrub or forested vegetation community is proposed, monitoring may be required for ten years or more. The project mitigation plan shall include monitoring elements that ensure certainty of success for the project’s natural resource values and functions. If the mitigation goals are not obtained within the initial five-year period, the applicant remains responsible for restoration of the natural resource values and functions until the mitigation goals agreed to in the mitigation plan are achieved. 6. Advance Mitigation. Mitigation for projects with preidentified impacts to wetlands may be constructed in advance of the impacts if the mitigation is implemented according to federal rules, state policy on advance mitigation, and state water quality regulations consistent with Interagency Regulatory Guide: Advance Permittee—Responsible Mitigation (Ecology Publication No. 12-06-015, Olympia, WA, December 2012). 7. Alternative Mitigation Plans. The administrative official or designee may approve alternative wetland mitigation plans that are based on best available science, such as priority restoration plans that achieve restoration goals identified in the SMP. Alternative mitigation proposals must provide an equivalent or better level of protection of wetland functions and values than would be provided by the strict application of this chapter. The administrative official or designee shall consider the following for approval of an alternative mitigation proposal: a. The proposal uses a watershed approach consistent with Selecting Wetland Mitigation Sites Using a Watershed Approach (Eastern Washington) (Ecology Publication No. 10-06-07, November 2010). b. Creation or enhancement of a larger system of natural areas and open space is preferable to the preservation of many individual habitat areas. c. Mitigation according to subsection D of this section is not feasible due to site constraints such as parcel size, stream type, wetland category, or geologic hazards. d. There is clear potential for success of the proposed mitigation at the proposed mitigation site. e. The plan shall contain clear and measurable standards for achieving compliance with the specific provisions of the plan. A monitoring plan shall, at a minimum, meet the provisions in this subsection I. f. The plan shall be reviewed and approved as part of overall approval of the proposed use. g. A wetland of a different type may be justified based on regional needs or functions and values; the replacement ratios may not be reduced or eliminated unless the reduction results in a preferred environmental alternative. h. Mitigation guarantees shall meet the minimum requirements as outlined in subsection (I)(2)(a)(viii) of this section. i. Qualified professionals in each of the critical areas addressed shall prepare the plan. j. The city may consult with agencies with expertise and jurisdiction over the critical areas during the review to assist with analysis and identification of appropriate performance measures that adequately safeguard critical areas.
( Ord. 2008-46 § 1 (part), 2008. Formerly 15.27.604 ; Ord. 2016-029 § 1 (Exh. A) (part), 2016 ; Ord. 2017-017 § 2 (Exh. B) (part), 2017 ; Ord. 2021-021 § 2 (Exh. A), 2021 )
Ask a question about Yakima law
Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.
