§ 17.05.020 — Environmental protection
Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 17.05.020
Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/09001ae1-6c25-400f-a22c-526dfc8fc9ca
§ 17.05.020: Environmental protection.
A. Ecological Functions. Uses and developments on city of Yakima shorelines must be designed, located, sized, constructed and maintained to achieve no net loss of shoreline ecological functions necessary to sustain shoreline natural resources. Uses and developments must not have an unmitigated significant adverse impact on other shoreline functions fostered by this SMP. B. Protection of Critical Areas and Critical Areas Buffers. Critical areas, critical areas buffers, and shoreline buffers must be protected in accordance with the provisions of Chapter 17.09 YMC, Critical Areas in Shoreline Jurisdiction. C. Mitigation Requirement. If a proposed shoreline development, use or modification is entirely addressed by specific, objective standards (such as setback distances, pier dimensions, or materials requirements) contained in this SMP, only then is a mitigation sequencing analysis described in subsection D of this section not required. In the following circumstances, the applicant must provide the mitigation sequencing analysis described in subsection D of this section: 1. If a proposed shoreline use or modification is addressed in any part by discretionary standards (such as standards requiring a particular action if feasible or requiring the minimization of development size) contained in this chapter, then the mitigation sequencing analysis is required for the discretionary standard(s); or 2. When an action requires a shoreline conditional use permit or shoreline variance permit; or 3. When specifically required by regulations contained in this chapter and Chapters 17.07 and 17.09 YMC. D. Mitigation Sequence. In order to ensure that development activities contribute to meeting the no net loss of ecological functions provisions by avoiding, minimizing, and mitigating for adverse impacts to ecological functions or ecosystem-wide processes, an applicant required to complete a mitigation analysis pursuant to subsection C of this section must describe how the proposal will follow the sequence of mitigation as defined below: 1. Avoid the impact altogether by not taking a certain action or parts of an action; 2. Minimize the impacts by limiting the degree or magnitude of the action and its implementation by using appropriate technology, or by taking affirmative steps to avoid or reduce impacts; 3. Rectify the impact by repairing, rehabilitating, or restoring the affected environment to the conditions existing at the time of the initiation of the project or activity; 4. Reduce or eliminate the impact over time by preservation and maintenance operations during the life of the action; 5. Compensate for the impact by replacing, enhancing, or providing substitute resources or environments; and 6. Monitor the impact and the compensation projects and take appropriate corrective measures. E. Mitigation Plan. All proposed alterations to shoreline jurisdiction that will have adverse effects on ecological functions require mitigation sufficient to provide for and maintain the functions and values of the shoreline area or to prevent risk from a critical areas hazard. The applicant must develop and implement a mitigation plan prepared by a qualified professional. Mitigation in excess of that necessary to ensure that development will result in no net loss of ecological functions will not be required by the city of Yakima, but may be voluntarily performed by an applicant. In addition to any requirements found in Chapter 17.09 YMC, Critical Areas in Shoreline Jurisdiction, a mitigation plan must include: 1. An inventory and assessment of the existing shoreline environment including relevant physical, chemical and biological elements; 2. A discussion of any federal, state, or local management recommendations which have been developed for critical areas or other species or habitats located on the site; 3. A discussion of proposed measures which mitigate the adverse impacts of the project to ensure no net loss of shoreline ecological functions; 4. A discussion of proposed management practices which will protect fish and wildlife habitat both during construction and after the project site has been fully developed; 5. Scaled drawings of existing and proposed conditions, materials specifications, and a minimum three-year maintenance and monitoring plan, including performance standards; 6. A contingency plan if mitigation fails to meet established success criteria; and 7. Any additional information necessary to determine the adverse impacts of a proposal and mitigation of the impacts. F. Alternative Mitigation. To provide for flexibility in the administration of the ecological protection provisions of this SMP, alternative mitigation approaches may be approved within shoreline jurisdiction where such approaches provide increased protection of shoreline ecological functions and processes over the standard provisions of this SMP and are scientifically supported.
( Ord. 2015-002 § 1 (Exh. A), 2015 ; Ord. 2017-017 § 2 (Exh. B), 2017 ; Ord. 2021-015 § 2 (Exh. A), 2021 )
Ask a question about Yakima law
Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.
