For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.05.060 — Flood hazard reduction

Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 17.05.060

Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/306c32ad-d8dd-40ad-bf55-a6944998c389

§ 17.05.060: Flood hazard reduction.

A. Development in floodplains shall avoid significantly or cumulatively increasing flood hazards. Development shall be consistent with this SMP, as well as Part Four of Chapter 15.27 YMC, applicable guidelines of the Federal Emergency Management Agency and an approved comprehensive flood hazard management plan. B. The channel migration zone (CMZ) is considered to be that area of a stream channel which may erode as a result of normal and naturally occurring processes and has been mapped consistent with WAC guidelines. C. The following uses and activities may be authorized within the CMZ or floodway: 1. New development or redevelopment on or landward of existing legal structures, such as levees, that prevent active channel movement and flooding. 2. Development of new or expansion or redevelopment of existing bridges, public stormwater facilities and outfalls, and other public utility and transportation structures, including trails, where no other feasible (see definition in YMC § 17.01.090) alternative exists or the alternative would result in unreasonable and disproportionate costs (see definition in YMC § 17.01.090). The evaluation of cost differences between options within the CMZ or floodway and outside of the CMZ or floodway shall include the cost of design, permitting, construction and long-term maintenance or repair. Where such structures are allowed, mitigation shall address adversely impacted functions and processes in the affected shoreline. 3. Development of new or expansion or redevelopment of existing utility lines where no other feasible alternative exists or the alternative would result in unreasonable and disproportionate costs. The evaluation of cost differences between options within the CMZ or floodway and outside of the CMZ or floodway shall include the cost of design, permitting, construction and long-term maintenance or repair. Where such structures are allowed, mitigation shall address adversely impacted functions and processes in the affected shoreline. When the primary purpose of a utility transmission line is to transfer bulk products or energy through a floodway en route to another destination, as opposed to serving customers within a floodway, such transmission lines shall conform to the following: a. All utility transmission lines shall cross floodways by the most direct route feasible as opposed to paralleling floodways; b. Electric transmission lines shall span the floodway with support towers located in floodway fringe areas or beyond. Where floodway areas cannot be spanned due to excessive width, support towers shall be located to avoid high floodwater velocity and/or depth areas, and shall be adequately floodproofed; c. Buried utility transmission lines transporting hazardous and nonhazardous materials, including but not limited to crude and refined petroleum products and natural gas, shall be buried a minimum of four feet below the maximum established scour of the waterway, as calculated on the basis of hydrologic analyses. Such burial depth shall be maintained horizontally within the hydraulic floodway to the maximum extent of potential channel migration as determined by hydrologic analyses. In the event potential channel migration extends beyond the hydraulic floodway, conditions imposed upon floodway fringe and special flood hazard areas shall also govern placement. All hydrologic analyses are subject to acceptance by the city of Yakima, which shall assume the conditions of a one-hundred-year frequency flood as verified by the U.S. Army Corps of Engineers, and shall include on-site investigations and consideration of historical meander characteristics in addition to other pertinent facts and data. The use of riprap as a meander containment mechanism within the hydraulic floodway shall be consistent with this title; d. Beyond the maximum extent of potential channel migration, utility transmission lines transporting hazardous and nonhazardous materials shall be buried below existing natural and artificial drainage features; and e. Aboveground utility transmission lines, not including electric transmission lines, shall only be allowed for the transportation of nonhazardous materials where an existing or new bridge or other structure is available and capable of supporting the line. When located on existing or new bridges or other structures with elevations below the one-hundred-year flood level, the transmission line shall be placed on the downstream side and protected from flood debris. In such instances, site-specific conditions and flood damage potential shall dictate placement, design and protection throughout the floodway. Applicants must demonstrate that such aboveground lines will have no appreciable effect upon flood depth, velocity or passage, and shall be adequately protected from flood damage. If the transmission line is to be buried except at the water-way crossing, burial specifications shall be determined as in this subsection (C)(3). 4. New or redeveloped measures to reduce shoreline erosion; provided, that it is demonstrated that the erosion rate exceeds that which would normally occur in a natural condition, that the measures do not interfere with fluvial hydrological and geomorphological processes normally acting in natural conditions, and that the measures include appropriate mitigation of adverse impacts on ecological functions associated with the river or stream. 5. Actions that protect or restore the ecosystemwide processes or ecological functions or development with a primary purpose of protecting or restoring ecological functions and ecosystem-wide processes. 6. Water-dependent installations which by their very nature must be in the floodway. In all instances of locating utilities and other installations in floodway locations, project design must incorporate floodproofing (examples of water-dependent installations are: docks and boat launches; dams for domestic/industrial water supply; wastewater treatment and collection systems; flood control and/or hydroelectric production; water diversion structures and facilities for water supply; irrigation and/or fisheries enhancement; floodwater and drainage pumping plants and facilities; hydroelectric generating facilities and appurtenant structures; and nonstructural uses and practices; provided, that the applicant shall provide evidence that a floodway location is necessary in view of the objectives of the proposal; and provided further, that the proposal is consistent with other provisions of this chapter and title). 7. Modifications or additions to an existing nonagricultural legal use; provided, that channel migration is not further limited and that the modified or expanded development includes appropriate protection of ecological functions. 8. Repair and maintenance of existing legally established use and developments; provided, that channel migration is not further limited, flood hazards to other uses are not increased, and significant adverse ecological impacts are avoided. 9. Existing and ongoing agricultural activities; provided, that no new restrictions to channel movement are proposed. D. Existing structural flood hazard reduction measures, such as levees, may be repaired and maintained as necessary to protect legal uses on the landward side of such structures. Increases in height of an existing levee, with any associated increase in width, that may be needed to prevent a reduction in the authorized level of protection of existing legal structures and uses shall be considered an element of repair and maintenance. E. Flood hazard reduction measures shall not result in channelization of normal stream flows, interfere with natural hydraulic processes such as channel migration, or undermine existing structures or downstream banks. F. New development in shoreline jurisdiction, including the subdivision of land, shall not be permitted if it is reasonably foreseeable that the development or use would require structural flood hazard reduction measures within the channel migration zone or floodway. G. New public and private structural flood hazard reduction measures: 1. Shall be approved when a scientific and engineering analysis demonstrates the following: a. That they are necessary to protect existing development; b. That nonstructural measures, such as setbacks, land use controls, wetland restoration, dike removal, use or structure removal or relocation, biotechnical measures, and stormwater management programs, are not feasible; c. That adverse effects upon adjacent properties will not result relative to increased floodwater depths and velocities during the base flood or other more frequent flood occurrences; d. That the ability of natural drainage ways to adequately drain floodwaters after a flooding event is not impaired; e. That the proposal has been coordinated through the appropriate diking district where applicable, and that potential adverse effects upon other affected diking districts have been documented; and f. That adverse impacts on ecological functions and priority species and habitats can be successfully mitigated so as to assure no net loss. 2. Shall be consistent with an approved comprehensive flood hazard management plan. 3. Shall be placed landward of associated wetlands and designated shoreline buffers, except for actions that increase ecological functions, such as wetland restoration, or when no other alternative location to reduce flood hazard to existing development is feasible as determined by the shoreline administrator. H. All new flood control projects shall define maintenance responsibilities and a funding source for operations, maintenance, and repairs for the life of the project. I. New public structural flood hazard reduction measures, such as levees, shall dedicate and improve public access pathways unless public access improvements would cause unavoidable health or safety hazards to the public, inherent and unavoidable security problems, unacceptable and unmitigable significant adverse ecological impacts, unavoidable conflict with the proposed use, or a cost that is disproportionate and unreasonable to the total long-term cost of the development. Setbacks of existing levees are not considered “new” structural flood hazard reduction measures for purposes of this regulation. J. In those instances where management of vegetation as required by this SMP conflicts with vegetation provisions included in state, federal or other flood hazard agency documents governing city-authorized, legal flood hazard reduction measures, the vegetation requirements of this SMP will not apply. However, the applicant shall submit documentation of these conflicting provisions with any shoreline permit applications, and shall comply with all other provisions of this section and this SMP that are not strictly prohibited by the approving flood hazard agency. K. The removal of gravel or other riverbed material for flood management purposes shall be consistent with YMC § 17.07.050, Dredging and dredge material disposal, and be allowed only after a biological and geomorphological study shows that extraction has a long-term benefit to flood hazard reduction, does not result in a net loss of ecological functions, and is part of a comprehensive flood management solution. L. Roads shall be located outside the floodway, except necessary crossings which shall be placed perpendicular to the water body as much as is physically feasible. New transportation facilities shall be designed so that the effective base flood storage volume of the floodplain is not reduced. The applicant shall provide all necessary studies, reports and engineering analyses which shall be subject to review and modification by the city. If proposed transportation facilities effectively provide flood control, they shall comply with policies and regulations of this section. M. In recognition of the significant benefits of levee setbacks, maximum flexibility of this title, including Chapter 17.09 YMC, Critical Areas in Shoreline Jurisdiction, should be granted when existing structural flood hazard reduction measures are proposed for relocation landward of the existing flood hazard reduction measure. Existing public access or recreation facilities that need to be relocated to accommodate the relocated flood hazard reduction measure shall be allowed to be reconstructed in the floodway or channel migration zone provided they do not further limit channel migration or increase flood hazards.

( Ord. 2015-002 § 1 (Exh. A), 2015 ; Ord. 2017-017 § 2 (Exh. B), 2017 ; Ord. 2021-015 § 2 (Exh. A), 2021 )

Ask a question about Yakima law

Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.