§ 17.09.010 — General provisions
Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 17.09.010
Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/598e7cae-50b3-4fbb-a9f0-9f98668f0afd
§ 17.09.010: General provisions.
A. Purpose of Chapter. The purpose of this chapter is to establish a single, uniform system of procedures and standards for development within designated critical areas within the shoreline jurisdiction of the incorporated city of Yakima. B. Intent of Chapter. This chapter establishes policies, standards, and other provisions pertaining to development within designated critical areas regulated under the provisions of the Growth Management Act (Chapter 36.70A RCW) and development regulated under the National Flood Insurance Program. Flood hazard areas, fish and wildlife habitat conservation areas, wetlands, geologically hazardous areas, and areas with a critical recharging effect on aquifers used for potable water constitute the city of Yakima’s critical areas pursuant to WAC 365-190-030. These areas are of special concern to the people of the city of Yakima and the state of Washington because they are environmentally sensitive lands, or hazardous areas, which comprise an important part of the state’s natural resource base. The policies, standards, and procedures of this chapter are intended to: 1. Preserve development options within designated critical areas where such development will result in “no net loss” of the functions and values of the critical areas; 2. Where appropriate, avoid uses and development which are incompatible with critical areas; 3. Prevent further degradation of critical areas; 4. Conserve and protect essential or important natural resources; 5. Protect the public health, safety, and general welfare; 6. Further the goals and policies of the Yakima Comprehensive Plan 2040; 7. Implement the goals and requirements of the Washington Growth Management Act (Chapter 36.70A RCW), the Shoreline Management Act (Chapter 90.58 RCW), and the National Flood Insurance Program (CFR Title 42); 8. Recognize and protect private property rights; and 9. Provide development options for landowners of all existing lots to the greatest extent possible. C. The policies, standards and procedures of this chapter are not intended to: 1. Regulate the operation and maintenance of existing, legally established uses and structures, including but not limited to vegetative buffers on existing uses that have been reduced in width prior to the effective date of this chapter; 2. Result in an unconstitutional regulatory taking of private property; 3. Require the restoration of degraded critical areas for properties in a degraded condition prior to the effective date of this chapter unless improvement of the buffer is needed for new development proposed on the property; 4. Presume that regulatory tools are the only mechanism for protection; and 5. Prohibit the use of valid water rights. D. Applicability. The provisions of this chapter shall apply to any new development, construction, or use within the incorporated portion of the city of Yakima’s shoreline jurisdiction that is designated as a critical area. However, this chapter does not apply to the situations below: 1. Within designated critical areas, there may exist lots, structures, and/or uses which were lawfully established prior to the adoption of this chapter, as provided below, but which would be subsequently prohibited, regulated, or restricted under this chapter. Such existing lots, structures, and/or uses shall be classified as legally nonconforming uses. 2. It is the intent of this chapter to permit these preexisting legally nonconforming uses and structures to continue until such time as conformity is possible: a. Minor, temporary, or transient activities (including those of a recreational nature) that do not alter the environment or require a dedicated staging area, use area, or route (including temporary signs) are not subject to this chapter; b. Mining, as defined in YMC § 17.01.090, as carried out under a Washington Department of Natural Resources reclamation permit, is not subject to the geologically hazardous areas provisions of this chapter for erosion hazard areas, oversteepened slope hazard areas, landslide hazard areas and suspected geologic hazard areas. Other critical areas provisions continue to apply. E. Critical Areas Development Authorization Required. 1. No new development, construction or use shall occur within a designated critical area without obtaining a development authorization in accordance with the provisions of this chapter, except for those provided for in subsection H of this section or YMC § 17.13.050. 2. With respect to application and review procedures, it is the intent of this chapter to streamline and coordinate development authorization within a critical area and recognize other requirements by local, state and/or federal permits or authorizations. Development, construction or use occurring within a designated critical area shall be processed according to the provisions of this chapter, unless determined to be exempt. 3. Approval of a development authorization under this chapter shall be in addition to and not a substitute for any other development permit or authorization required by the city of Yakima. Approval of a development authorization under this chapter shall not be interpreted as an approval of any other permit or authorization required of a development, construction or use. 4. Development authorizations shall be issued in accordance with this chapter, the Shoreline Management Act, and permit procedures of Chapter 173-27 WAC. 5. Coordination With Other Jurisdictions. a. Where all or a portion of a standard development project site is within a designated critical area and the project is subject to another local, state or federal development permit or authorization, the shoreline administrator shall determine whether the provisions of this chapter can be processed in conjunction with a local, state or federal development permit or authorization. The decision of the shoreline administrator shall be based upon the following criteria: i. The nature and scope of the project and the critical area features involved or potentially impacted; ii. The purpose or objective of the permit or authorization and its relationship to protection of the critical area; iii. The feasibility of coordinating the critical areas development authorization with other permitting agency; iv. The timing of the permit or authorization. b. If a determination has been made that provisions of this chapter can be handled in conjunction with another applicable development permit or authorization process, the shoreline administrator will not accept the development authorization and/or permits in place of a shoreline permit or critical areas development authorization. Project proponents may be required to provide additional site plans, data and other information necessary as part of that process to ensure compliance with this chapter. The shoreline administrator’s decision on the critical areas development authorization shall be coordinated to coincide with other permits and authorizations. INQUIRY AND EARLY ASSISTANCE F. Critical Areas Identification Form and Critical Areas Report Requirements. 1. Prior to the review of any applicable proposed development, construction or use, the applicant shall provide the city with a critical areas identification form and site plan and any other information the city may require to determine if a critical area is present. 2. Upon receipt of a critical areas identification form and site plan, the shoreline administrator or designee may conduct a site examination to review critical areas conditions. The shoreline administrator or designee shall notify the property owner of the site examination prior to the site visit. Reasonable access to the site shall be provided by the property owner. 3. The shoreline administrator or designee shall review the available information pertaining to the proposal and make a determination whether any critical areas may be affected. If so, a more detailed critical areas report shall be submitted in conformance with subsections P and Q of this section, except as provided below: a. No Critical Areas Present. If the shoreline administrator or designee is able to sufficiently determine a critical area does not exist within or adjacent to the project area and/or a critical areas report is not required. b. Critical Areas Present, but No Impact. If the shoreline administrator or designee is able to determine the existence, location and type of critical area and the project area is not within the critical area and/or the project will not have an indirect impact on the function of an adjacent wetland. c. Critical Areas May Be Affected by a Proposal. The shoreline administrator or designee may waive the requirement for a critical areas report utilizing the technical expertise of other reviewing agencies if: i. The shoreline administrator is sufficiently able to determine the existence, location and type of the critical area; ii. The project scale or nature is such that a specialist is not necessary to identify impacts and mitigation; and iii. The applicant agrees to provide mitigation the shoreline administrator deems adequate to mitigate for anticipated impacts. 4. Reports will generally fall into the following groups: a. Determining the absence of a critical area; b. Determining the existence, location and type of a critical area; c. Determining impacts of an encroachment on a critical area and general mitigation measures; and d. Developing a compensatory mitigation plan. G. Preapplication Conference. Any new development or use falling under the provisions of this chapter may be subject to a preapplication conference. Prior to the preapplication conference, the project proponent must submit a critical areas identification form and preliminary site plan. The preapplication conference is intended to allow the shoreline administrator or designee to: 1. Establish the scope of the project and identify potential concerns that may arise; 2. Identify permits, exemptions, and authorizations, which the project proponent may need to obtain; 3. Determine whether the project will be processed through the development procedures of this chapter or coordinated with the review procedures of another development permit or authorization; 4. Provide the proponent with resources and technical assistance (such as maps, scientific information, other source materials, etc.); and 5. Determine whether there is a need for a preliminary site assessment. ABBREVIATED REVIEW ALTERNATIVES H. Minor Activities Allowed Without a Critical Areas Permit. The project may require a shoreline permit or shoreline exemption under other provisions of this title. This chapter shall be inapplicable to the following actions: 1. Maintenance of existing, lawfully established areas of crop vegetation, landscaping, paths, and trails or gardens within a regulated critical area or its buffer. Examples include: mowing lawns, weeding, garden crops, pruning, and planting of noninvasive ornamental vegetation or indigenous native species to maintain the general condition and extent of such areas; 2. Minor maintenance and/or repair of structures that do not involve additional construction, earthwork or clearing. Examples include painting, trim or facing replacement, reroofing, etc. Cleaning, operation and maintenance of canals, ditches, drains, waste ways, etc., is not considered additional earthwork, as long as the cleared materials are placed outside the stream corridor, wetlands, and buffers; 3. Low impact activities such as hiking, canoeing, viewing, nature study, photography, hunting, fishing, education or scientific research; 4. Creation of private trails that do not cross streams or wetlands that are less than two feet wide and do not involve placement of fill or grubbing of vegetation; 5. Maintenance and normal work of the Greenway pathway and grounds; 6. Planting of native vegetation; 7. Noxious weed control outside vegetative buffers identified in YMC § 17.09.030(O) and 17.09.040(E); and 8. Noxious weed control within vegetative buffers, if the criteria listed below are met. Control methods not meeting these criteria may still apply for a restoration exemption, or other authorization as applicable: a. Hand removal/spraying of individual plants or other acceptable method approved by the administrative official; b. No area-wide vegetation removal/grubbing. I. Mitigation Requirements. 1. All mitigation shall be sufficient to maintain the functions and values of the critical area; 2. All development shall demonstrate that reasonable efforts have been examined to avoid and minimize impacts to critical areas; 3. When an alteration to a critical area is proposed, it shall be avoided, minimized, or mitigated for as specified in YMC § 17.05.020(D); 4. If an alteration to a critical area is unavoidable, all adverse impacts to that critical area and its buffers shall be mitigated for in accordance with an approved mitigation plan and mitigation for wetland impacts shall be mitigated in accordance with the Washington State Department of Ecology Wetland Mitigation in Washington State, Parts 1 and 2 (April 2021 and March 2006 or as updated); and 5. Mitigation shall be in kind and on site, whenever possible, and may be out of kind and/or off site when deemed appropriate by the shoreline administrator or designee. REVIEW PROCESS J. Application Submittal. 1. Applications for development authorizations under this chapter shall be made on forms provided by the department. Application submittals shall include a site plan drawn to an engineering scale of 1:20 showing: a. Dimensions of all sides of the parcel; b. Size and location of existing and proposed structures; c. Excavation, fill, drainage facilities, impervious surfaces, topography, slope; d. Other information as needed to determine the nature and scope of the proposed development; and e. Location of all critical areas. 2. The submittal shall also include all required critical areas reports prepared in conformance with subsections P and Q of this section. 3. To be complete, a critical areas development authorization application must include all maps, drawings and other information or data specified by this chapter or requested on the basis of the preapplication conference (subsection G of this section). K. Determination of Review Process. 1. The shoreline administrator or designee shall determine from the application submittal and other available information what type of permit(s) and/or review(s) will be required under this chapter. 2. Specific information of permit type, review and process can be found in subsequent sections of this chapter and in Chapter 17.13 YMC. L. Development Authorization—Review Procedure. Upon submittal and acceptance of a completed development authorization application, the shoreline administrator or designee shall process and review the application as follows: 1. Development authorizations shall be processed in accordance with statutory noticing requirements in YMC § 17.13.030 and with specific requirements provided in Chapter 17.13 YMC, including but not limited to: a. Submittals; b. Completeness review; c. Notices; d. Hearings; e. Decisions; and f. Appeals. 2. In circumstances where a critical area is proposed to be altered, but the development otherwise requires only a shoreline exemption, the development must be reviewed and processed as a shoreline substantial development permit or a shoreline variance. 3. Development authorizations shall be reviewed in conformance with the applicable development standards of subsection R of this section and with YMC § 17.09.030 through 17.09.060. 4. Decisions on a development authorization shall be consistent with subsections M and N of this section, and with any specific decision criteria provided under the section for each relevant permit type, as provided in Chapter 17.13 YMC and subsection R of this section. M. Authorization Decisions—Basis for Action. 1. In addition to meeting the shoreline permit-specific criteria in Chapter 17.13 YMC, the action on any development authorization under this chapter shall also be based upon the following criteria: a. Impact of the project to critical area features on and abutting the property; b. Danger to life or property that would likely occur as a result of the project; c. Compatibility of the project with the critical area features; d. Conformance with applicable development standards; e. Adequacy of the information provided by the applicant or available to the department. 2. Based upon the project evaluation, the shoreline administrator shall take one of the following actions: a. Grant the development authorization; b. Grant the development authorization with conditions, as provided in subsection N of this section, to mitigate impacts to the critical area feature(s); or c. Deny the development authorization. 3. The decision by the shoreline administrator or designee shall include written findings and conclusions. N. Conditional Approval of Development Authorization. In granting any development authorization, the shoreline administrator or designee may impose conditions to: 1. Accomplish the purpose and intent of this chapter; 2. Eliminate or mitigate any identified negative impacts of the project; and 3. Protect critical areas from damaging and incompatible development. O. Fees and Charges. The Yakima city council shall establish the schedule of fees and charges listed in Chapter 15.26 YMC (Land Development Fees) for development authorizations, variances, appeals and other matters pertaining to this chapter. CRITICAL AREAS REPORTS P. Critical Areas Report Requirements. 1. The shoreline administrator or designee may require a critical areas report, paid for by the applicant, when it is determined necessary. 2. A qualified professional shall prepare the report consistent with most current, accurate, and complete scientific and technical information available that is applicable to the issues of concern. The intent of these provisions is to require a reasonable level of technical study and analysis sufficient to protect critical areas. The analysis shall be appropriate to the value or sensitivity of a particular critical area and relative to the scale and potential impacts of the proposed activity. 3. The critical areas report shall: a. Demonstrate the proposal is consistent with the purposes and standards of this chapter; b. Describe all potential risks to critical areas, and assess impacts on the critical area from the activities and uses proposed; and c. Identify mitigation and protective measures. 4. The critical areas report shall include information addressing the supplemental report requirements (see subsection Q of this section). 5. The shoreline administrator or designee shall review the critical areas report for completeness and accuracy and shall consider the recommendations and conclusions to assist in making decisions on development authorizations, appropriate mitigation, and protective measures. 6. Critical areas reports shall be valid for a period of five years, unless it can be demonstrated that a previous report is adequate for current analysis. Reports prepared for adjacent properties may be utilized for current analysis only when it can be shown through a supplemental report or site investigation that conditions on site are unchanged. 7. The shoreline administrator or designee may require the preparation of a new critical areas assessment or a supplemental report if the initial assessment is in error. 8. The shoreline administrator or designee may reject or request revision of the critical areas report when it can be demonstrated that the assessment is inaccurate, incomplete or does not fully address the critical areas impacts involved. 9. Applicants shall provide reports and maps to the city in both electronic and paper formats. In addition, all critical areas delineations/maps shall be provided to the city by means of a GPS projected coordinate system data set as specified by the city of Yakima engineer. The city may waive this requirement for single-family developments. Applicants are encouraged to coordinate with the shoreline administrator or designee regarding electronic submittal guidelines. 10. At a minimum, a critical areas report shall include the following information: a. A site plan showing the proposed development footprint and clearing limits, and all relevant critical areas and buffers; b. A written summary of the critical areas, including their size, type, classification or rating, condition, disturbance history, and functions and values. For projects on or adjacent to geologically hazardous areas or areas subject to high floodwater depth or velocity the description shall identify the type and characteristics of the hazard; c. An analysis of potential adverse impacts and how they will be mitigated or avoided. Geologically hazardous areas are additionally required to assess the risks posed by the development to critical areas, public and private properties, and both associated and unassociated nearby facilities and uses; d. When impacts cannot be avoided, the report shall include a plan describing mitigation to replace critical area functions and values. For projects on or adjacent to geologically hazardous areas or areas subject to high floodwater depth or velocity, the mitigation shall additionally address the site, and other public and private properties, and both associated and unassociated nearby facilities and uses potentially affected; e. The dates, names, and qualifications of the persons preparing the report and documentation of analysis methods including any fieldwork performed on the site; and f. Additional reasonable information requested by the shoreline administrator or designee. 11. A critical areas report may be supplemented by or composed, in whole or in part, of any reports or studies required by other laws and regulations or previously prepared for and applicable to the development proposal site. 12. The shoreline administrator or designee may limit the geographic area of the critical areas report as appropriate. 13. Compensatory Mitigation Plans. When compensatory mitigation, as described in subsection I of this section, is proposed for wetland areas or stream channels, the applicant shall submit a mitigation plan as part of the critical areas report, which includes: a. A written report identifying environmental goals and objectives of the proposed compensation including a description of: i. The anticipated impacts to the critical areas; ii. The mitigating actions proposed; iii. The purpose of the compensation measures, including site selection criteria; iv. The compensation goals and objectives; v. The desired resource functions; vi. Construction activities start and completion dates; and vii. Analysis of anticipated success of the compensation project; b. A review of the most current, accurate, and complete scientific and technical information available that is applicable to the issues of concern supporting the proposed mitigation; c. A description of the report and the author’s experience to date in restoring or creating the type of critical areas report Proposed; d. Performance standards. The mitigation plan shall include measurable specific criteria for evaluating the goals and objectives to ensure the mitigation project has been successfully attained; e. Detailed construction documents. The mitigation documents shall include written specifications and plans describing the mitigation proposed, such as: i. The proposed construction sequence, timing, and duration; ii. Grading and excavation details; iii. Erosion and sediment control features; iv. A planting plan specifying plant species, quantities, locations, size, spacing, and density; v. Measures to protect and maintain plants until established; and vi. Documents should include scale drawings showing necessary information to convey both existing and proposed topographic data, slope, elevations, plants and project limits; f. Monitoring program. The mitigation plan shall include: i. A program for monitoring both construction of the compensatory project and its completion and survivability; ii. A plan which details how the monitoring data will be evaluated to determine if the performance standards are being met; iii. Reports as needed to document milestones, successes, problems, and contingency actions of the compensation project; and iv. Monitoring for a period necessary to establish that performance standards have been met, but not for a period less than five years; g. Contingency plan. Identification of the potential courses of action, and any corrective measures to be taken if monitoring or evaluation indicates project performance standards are not being met; h. Financial guarantees. A financial guarantee ensuring fulfillment of the compensation project, monitoring program, and any contingency measures shall be posted in accordance with subsection (R)(1) of this section. 14. Innovative Mitigation. a. Advanced mitigation or mitigation banking are examples of alternative mitigation projects allowed under the provisions of this section. One or more applicants, or an organization with demonstrated capability, may undertake a mitigation project together if it is demonstrated that all of the following circumstances exist: i. Creation or enhancement of a larger system of critical areas and open space is preferable to the preservation of many individual habitat areas; ii. The applicant demonstrates the organizational and fiscal capability to act cooperatively; iii. The applicant demonstrates that long-term management of the habitat area will be provided; iv. There is a clear potential for success of the proposed mitigation at the identified site; v. There is a clear likelihood for success of the proposed plan based on supporting scientific information and demonstrated experience in implementing similar plans; vi. The proposed project results in equal or greater protection and conservation of critical areas than would be achieved using parcel-by-parcel regulations and/or traditional mitigation approaches; vii. The plan is consistent with the general purpose and intent of this section; viii. The plan shall contain relevant management strategies which are within the scope of this section; and ix. The plan shall contain clear and measurable standards for achieving compliance with the purposes of this section, a description of how such standards will be monitored and measured over the life of the plan, and a fully funded contingency plan if any element of the plan does not meet standards for compliance. b. Conducting mitigation as part of a cooperative process does not reduce or eliminate the required wetland replacement ratios. c. Projects that propose compensatory wetland mitigation shall also use the standards in YMC § 17.09.040(E). For those situations where a mitigation bank may provide an opportunity for mitigation, the requirements in YMC § 17.09.040(F) shall apply. Q. Supplemental Report Requirements for Specific Critical Areas. 1. Fish and Wildlife Habitat Conservation Areas. When a critical areas report is required for a fish and wildlife habitat conservation area, it shall include the following: a. A habitat and native vegetation conservation strategy that addresses methods to protect the functional properties listed in YMC § 17.09.030(E); b. Where proposed construction lies within an immediate zone of potential channel migration, a hydrologic analysis report may be required. The report shall assume the conditions of the one-hundred-year flood, include on-site investigative findings, and consider historical meander characteristics in addition to other pertinent facts and data; and c. A discussion of any federal, state or local management recommendations which have been developed for the species or habitats in the area, and how they will be incorporated into the project. 2. Wetlands. When a critical areas report is required for wetlands, it shall include the following: a. The exact location of a wetland’s boundary and wetland rating as determined through the performance of a field investigation by a qualified wetland professional applying the approved federal wetland delineation manual and applicable regional supplements and the Washington State Wetland Rating System for Eastern Washington, revised October 2014 (Ecology Publication No. 14-06-030, or as revised); b. All delineated wetlands and required buffers within two hundred feet of the project area shall be shown on the site plan. Available information should include, but not be limited to, aerial photos, land based photos, soils maps, or topographic maps; c. An analysis of the wetlands including the following site related information: i. A statement specifying the accuracy of the report and all assumptions made and relied upon; ii. Documentation of fieldwork performed on the site, including field data sheets for delineations, wetland rating forms, baseline hydrologic data, etc.; iii. A description of the methodologies used to conduct the wetland delineations, or impact analyses including references; and iv. Wetland category, including vegetative, faunal, and hydrologic characteristics; d. For projects that will affect the wetland or buffer, provide the following: i. A habitat and native vegetation conservation strategy that addresses methods to protect or enhance on-site habitat and wetland functions and values listed in YMC § 17.09.030(E) and 17.09.040(D)(1); and ii. Mitigation sequencing, pursuant to YMC § 17.05.020(D) to avoid, minimize, and mitigate impacts shall result in “no net loss” of acreage or functional values of wetlands and shall follow the guidance provided in YMC § 17.09.040(E). 3. Geologically Hazardous Areas. When a critical areas report is required for a geologically hazardous area, it shall include the following: a. A description of the site features, including surface and subsurface geology; b. A description of the geologic processes and hazards affecting the property, including a determination of the actual hazard types for any suspected and risk unknown hazards identified in the affirmative determination of hazard; c. A description of the vulnerability of the site to seismic and other geologic processes and hazards; and d. A description of any potential hazards that could be created or exacerbated as a result of site development; e. For developments in or affecting landslide hazard areas the report shall also include: i. Assessments and conclusions regarding slope stability including the potential types of landslide failure mechanisms (e.g., debris flow, rotational slump, translational slip, etc.) that may affect the site. The stability evaluation shall also consider dynamic earthquake loading and shall use a minimum horizontal acceleration as established by the current version of YMC Title 11 (Buildings); ii. An analysis of slope recession rate shall be presented in those cases where stability is impacted by stream meandering or other forces acting on the toe of the slope; and iii. Description of the run-out hazard of landslide debris to the proposed development that starts upslope and/or the impacts of landslide run-out on downslope properties and critical areas. 4. Critical Aquifer Recharge Areas. The approach of the city of Yakima critical areas regulations is to require a level of study and analysis commensurate with potential risks to wellhead protection zones associated with particular sites and particular proposals. At a minimum, all applicants shall review the history of the site and conduct a surface reconnaissance. The purpose of a critical aquifer recharge area report is to evaluate the actual geologic conditions and determine the site’s proximity to or location within a wellhead protection zone; evaluate the safety and appropriateness of proposed activities; and recommend appropriate construction practices, monitoring programs, and other mitigation measures required to ensure achievement of the purpose and intent of these regulations. The information required by this report should be coordinated with the study and reporting requirements for any other critical areas located on the site. A critical aquifer recharge area report shall be prepared by a qualified professional who is a hydrogeologist, geologist, or engineer who is licensed in the state of Washington and who has experience in preparing hydrogeologic assessments. a. Level One Hydrological Assessment. At sites located within Wellhead Protection Zones 1 through 3, defined in YMC § 17.09.060(C)(1), a critical aquifer recharge area report shall contain a level one hydrological assessment which includes the following site- and proposal-related information at a minimum: i. Information regarding geologic and hydrogeologic characteristics of the site, including the surface location of all critical aquifer recharge areas located on site or immediately adjacent to the site, and permeability of the unsaturated zone based on existing data. ii. Groundwater depth, flow direction, and gradient based on available information. iii. Currently available data on wells and springs within one thousand three hundred feet of the project area. iv. Location of other critical areas, including surface waters, within one thousand three hundred feet of the project site. v. Available historic water quality data for the area to be affected by the proposed activity. vi. BMPs proposed to be utilized. b. Level Two Hydrogeologic Assessment. i. A level two hydrogeologic assessment shall be required for any of the following proposed activities at sites located within Wellhead Protection Zones 1 through 3: (a) Activities that result in five thousand square feet or more impervious site area. (b) Activities that divert, alter, or reduce the flow of surface or groundwaters, including dewatering or otherwise reduce the recharging of the aquifer. (c) The storage, handling, treatment, use, production, recycling, or disposal of deleterious substances or hazardous materials, other than household chemicals used according to the directions specified on the packaging for domestic applications. (d) The use of injection wells, including on-site septic systems, except those domestic septic systems releasing less than fourteen thousand five hundred gallons of effluent per day and that are limited to a maximum density of one system per one acre. (e) Any other activity determined by the director of community development likely to have an adverse impact on groundwater quality or quantity, or on the recharge of the aquifer. ii. A level two hydrogeologic assessment shall include the following site- and proposal-related information at a minimum, in addition to the requirements for a level one hydrogeological assessment: (a) Historic water quality and elevation data for the area to be affected by the proposed activity compiled for at least the previous five-year period. (b) Groundwater monitoring plan provisions. (c) Discussion of the effects of the proposed project on the groundwater quality and quantity, including: (a) Predictive evaluation of groundwater withdrawal effects on nearby wells and surface water features. (b) Predictive evaluation of contaminant transport based on potential releases to groundwater. (d) Identification of the type and quantities of any deleterious substances or hazardous materials that will be stored, handled, treated, used, produced, recycled, or disposed of on the site, including but not limited to materials, such as elevator lift/hydraulic fluid, hazardous materials used during construction, materials used by the building occupants, proposed storage and manufacturing uses, etc. (e) Proposed methods of storing any of the above substances, including containment methods to be used during construction and/or use of the proposed facility. (f) Proposed plan for implementing YMC § 17.09.060(C)(3)(d)(vi), Protection Standards During Construction. (g) A spill plan that identifies equipment and/or structures that could fail, resulting in an impact. Spill plans shall include provisions for regular inspection, repair, and replacement of structures and equipment that could fail. (h) A complete discussion of past environmental investigations, sampling, spills, or incidents that may have resulted in or contributed to contaminated soil or groundwater at the site. Attach copies of all historical and current reports, and sampling results. R. General Critical Areas Protective Measures. The standards below apply to all permits and reviews performed under this chapter. 1. Financial Guarantees. Financial guarantees may be required to ensure mitigation, maintenance, and monitoring: a. When required mitigation pursuant to a development proposal is not completed prior to the city of Yakima’s final permit approval, the shoreline administrator or designee may require the applicant to post a financial guarantee to ensure that the work will be completed. b. If a development proposal is subject to compensatory mitigation, the applicant must post a financial guarantee to ensure mitigation is fully functional. c. All financial guarantees shall be in the amount of one hundred twenty-five percent of the estimated cost of the uncompleted actions and/or the estimated cost of restoring the functions and values of the critical areas that are at risk. d. The financial guarantee may be in the form of a surety bond, performance bond, assignment of savings account, irrevocable letter of credit guaranteed by an acceptable financial institution, or other form acceptable to the shoreline administrator or designee, with terms and conditions acceptable to the city of Yakima attorney. e. The financial guarantee shall remain in effect until the shoreline administrator or designee determines that the standards bonded for have been met. Financial guarantees for wetland or stream compensatory mitigation shall be held for a minimum of five years after completion of the work to ensure that the required mitigation has been fully implemented and demonstrated to function. f. If public funds have previously been committed for mitigation, maintenance, monitoring, or restoration, a financial guarantee will not be required. g. Failure to satisfy critical areas requirements shall constitute a default, and the shoreline administrator and his or her designee may demand payment of any financial guarantee. h. Any funds recovered pursuant to this section shall be used to complete the required mitigation. Such funds shall be deposited in a separate account. The city of Yakima will use such funds to arrange for completion of the project or mitigation, and follow-up corrective actions. i. Depletion, failure, or collection of financial guarantees shall not discharge the obligation of an applicant or violator to complete required mitigation, maintenance, monitoring, or restoration. 2. Subdivision Standards. The following standards apply to all permits or reviews under the subdivision ordinance (YMC Title 14) that contain critical areas: a. All subdivisions that contain critical areas shall be eligible for density bonuses or other development incentives, as provided in the subdivision ordinance (YMC Title 14) and zoning ordinance (YMC Title 15); b. Critical areas shall be actively protected through the following: i. Roads and utilities for the subdivision shall avoid critical areas and their buffers, as much as possible; ii. When geologically hazardous areas (excluding erosion, oversteepened slopes of intermediate risk, stream undercutting, and earthquake hazards), FEMA floodway, channel migration zone (CMZ), streams, wetlands and/or vegetative buffers fall within the boundary of a subdivision; (A) Said critical areas shall be protected by placing them entirely within a separate critical area tract or by including them entirely within one of the developable parcels. Other options, such as conservation easements and building envelopes, may be deemed appropriate by the shoreline administrator as meeting this provision when special circumstances obstruct the viability of this provision; (B) For those new lots that do contain said critical areas, usable building envelopes (five thousand square feet or more for residential uses) shall be provided on the plat that lies outside said critical areas; iii. New lots partially within the floodplain shall provide a usable building envelope (five thousand square feet or more for residential uses) outside the floodplain; iv. New lots entirely within the floodplain shall be at least one acre in area; v. For new lots containing streams, wetlands, and/or vegetative buffers, outdoor use envelopes shall be provided on the plat that lies outside said critical areas; vi. Degraded vegetative buffers shall be restored or provided with protection measures that will allow them to recover; vii. Floodplains and critical areas shall be depicted on preliminary subdivision plats and relevant information about them disclosed on the final plat; viii. Lots or parcels that lie entirely within geologically hazardous areas (excluding erosion, oversteepened slopes of intermediate risk, stream undercutting, and earthquake hazards), FEMA floodway, channel migration zone (CMZ), stream, wetland, and/or vegetative buffers may not be further divided.
( Ord. 2015-002 § 1 (Exh. A), 2015 ; Ord. 2017-017 § 2 (Exh. B), 2017 ; Ord. 2021-015 § 2 (Exh. A), 2021 )
Ask a question about Yakima law
Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.
