For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.09.040 — Wetlands

Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 17.09.040

Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/d2b9d9db-b0a8-44f9-97ae-f8e524316641

§ 17.09.040: Wetlands.

A. Purpose and Intent. The purpose and intent of the provisions protecting wetland critical areas is equivalent to the purpose and intent for YMC § 17.09.030. B. Designating and Mapping. 1. Wetlands shall be delineated using the procedure outlined in the approved federal wetland delineation manual and applicable regional supplements. 2. Wetlands are all areas meeting the definition for wetlands as defined in YMC § 17.01.090 and are hereby designated critical areas which are subject to this chapter, except the following: a. Irrigation systems that create artificial wetlands; and b. Areas where changes in irrigation practices have caused wetland areas to dry up. 3. The approximate location and extent of wetlands are shown on maps maintained by the city of Yakima. These maps may include information from the National Wetlands Inventory produced by the U.S. Fish and Wild-life Service and are to be used as a guide for the city of Yakima. C. Protection Approach. Wetlands will be protected using the protection approach for fish and wildlife habitat conservation areas found in YMC § 17.09.030(B). Wetlands and their functions will be protected using the standards found in this section and in YMC § 17.09.030. D. Wetland Functions and Rating. 1. Wetlands are unique landscape features that are the interface between the aquatic and terrestrial environments. Wetlands provide the following functions: a. Biogeochemical functions, which improve water quality in the watershed (such as nutrient retention and transformation, sediment retention, metals, and toxics retention and transformation). b. Hydrologic functions, which maintain the water regime in a watershed, such as: flood flow attenuation, decreasing erosion, and groundwater recharge. c. Food and habitat functions, which include habitat for invertebrates, amphibians, anadromous fish, resident fish, birds, and mammals. 2. Wetlands shall be rated based on categories that reflect the functions and values of each wetland and shall be based on the criteria provided in the Washington State Wetland Rating System for Eastern Washington, revised October 2014 (Ecology Publication No. 14-06-030, or as revised) which are summarized below. a. Category I wetlands are those that 1) represent a unique or rare wetland type; or 2) are more sensitive to disturbance than most wetlands; or 3) are relatively undisturbed and contain ecological attributes that are impossible to replace in a human lifetime; or 4) provide a high level of functions. Risk of any degradation to these wetlands must be avoided because their functions and values are too difficult to replace. Generally, these wetlands are not common and make up a small percentage of the wetlands in the region. b. Category II wetlands are difficult but not impossible to replace and provide high levels of some functions. These wetlands occur more commonly than Category 1 wetlands, but still need a relatively high level of protection. c. Category III wetlands are wetlands with a moderate level of functions and can often be adequately replaced with a well-planned mitigation project. These wetlands generally have been disturbed in some ways and are often less diverse or more isolated from other natural resources in the landscape than Category II wetlands. d. Category IV wetlands have the lowest levels of functions and are often heavily disturbed. These are wetlands that should be able to be replaced and, in some cases, improved. However, experience has shown that replacement cannot be guaranteed in any specific case. These wetlands may provide some important functions and also need to be protected. 3. Wetlands shall be rated as they exist on the day of project application submission. Information regarding the original condition of illegally modified wetlands that cannot be discerned from aerial photographs or other reliable information sources shall use the highest appropriate points value within each missing data field of the Washington State Wetland Rating System for Eastern Washington rating sheet to complete the rating. E. Wetland Buffers. 1. Buffer Requirements. The following buffer widths have been established in accordance with the most current, accurate and complete scientific and technical information. They are based on the category of wetland and the habitat score as determined by a qualified professional using the Washington State Wetland Rating System for Eastern Washington: 2014 Update (Ecology Publication No. 14-06-030, or as revised). The adjacent land use intensity is assumed to be high. a. For wetlands that score five points or more for habitat function, the buffers in Table 09.040-1 can be used if both of the following criteria are met: 1. A relatively undisturbed, vegetated corridor at least one hundred feet wide is protected between the wetland and any other priority habitats as defined by the Washington State Department of Fish and Wildlife (http://wdfw.wa.gov/hab/phshabs.htm). The corridor must be protected for the entire distance between the wetland and the priority habitat by some type of legal protection such as a conservation easement. Presence or absence of a nearby habitat must be confirmed by a qualified biologist. If no option for providing a corridor is available, Table 09.040-1 may be used with the required measures in Table 09.040-2 alone. 2. The measures in Table 09.040-2 are implemented, where applicable, to minimize the impacts of the adjacent land uses. b. For wetlands that score three to four habitat points, only the measures in Table 09.040-2 are required for the use of Table 09.040-1. c. If an applicant chooses not to apply the mitigation measures in Table 09.040-2, or is unable to provide a protected corridor where available, then Table 09.040-3 shall be used. d. The buffer widths in Tables 09.040-1 and 09.040-3 assume that the buffer is vegetated with a native plant community appropriate for the ecoregion. If the existing buffer is unvegetated, sparsely vegetated, or vegetated with invasive species that do not perform needed functions, the buffer should either be planted to create the appropriate plant community or the buffer should be widened to ensure that adequate functions of the buffer are provided. Table 09.040-1: Wetland Buffer Requirements if Table 09.040-2 Is Implemented and Corridor Provided Wetland Category | Buffer Width (feet) Based on Habitat Score 3—5 | 6—7 | 8—9 Category I: Based on total score | 75 | 110 | 150 Category I: Forested | 75 | 120 | 150 Category I: Bogs and wetlands of high conservation value | 190 Category I: Alkali | 150 Category II: Based on total score | 75 | 110 | 150 Category II: Vernal pool | 150 Category II: Forested | 75 | 110 | 150 Category III (all) | 60 | 110 | 150 Category IV (all) | 40 Table 09.040-2: Required Measures to Minimize Impacts to Wetlands Disturbance | Required Measures to Minimize Impacts Lights | • Direct lights away from wetland Noise | • Locate activity that generates noise away from wetland• If warranted, enhance existing buffer with native vegetation for plantings adjacent to noise source• For activities that generate relatively continuous, potentially disruptive noise, such as certain heavy industry or mining, establish an additional 10 feet heavily vegetated buffer strip immediately adjacent to the outer wetland buffer Toxic runoff | • Route all new, untreated runoff away from wetland while ensuring wetland is not dewatered• Establish covenants limiting use of pesticides within 150 feet of wetland• Apply integrated pest management Stormwater runoff | • Retrofit stormwater detention and treatment for roads and existing adjacent development• Prevent channelized flow from lawns that directly enters the buffer• Use low intensity development tech-niques Changes in water regime | • Infiltrate or treat, detain, and disperse into buffer new runoff from impervious surfaces and new lawns Pets and human disturbance | • Use privacy fencing OR plant dense vegetation to delineate buffer edge and to discourage disturbance using vegetation appropriate for the ecoregion• Place wetland and its buffer in a separate tract or protect with a conservation easement Dust | • Use best management practices to control dust Table 09.040-3: Wetland Buffer Requirements if Table 09.040-2 Is NOT Implemented and Corridor NOT Provided Wetland Category | Buffer Width (feet) Based on Habitat Score 3—5 | 6—7 | 8—9 Category I: Based on total score | 100 | 150 | 200 Category I: Forested | 100 | 150 | 200 Category I: Bogs and wetlands of high conservation value | 250 Category I: Alkali | 200 Category II: Based on total score | 100 | 150 | 200 Category II: Vernal pool | 200 Category II: Forested | 100 | 150 | 200 Category III (all) | 80 | 150 | 200 Category IV (all) | 50 e. Increased Wetland Buffer Area Width. Buffer widths shall be increased on a case-by-case basis as deter-mined by the administrative official when a larger buffer is necessary to protect wetland functions and values. This determination shall be supported by appropriate documentation showing that it is reasonably related to protection of the functions and values of the wetland. This documentation shall include, but not be limited to, the following criteria: i. The wetland is used by a state or federally listed plant or animal species, or has unusual nesting or resting sites such as heron rookeries or raptor nesting trees; or ii. The adjacent land is susceptible to severe erosion, and erosion-control measures will not effectively prevent adverse wetland impacts; or iii. The adjacent land has minimal vegetative cover or slopes greater than thirty percent. f. Buffer averaging to improve wetland protection may be permitted when all of the following conditions are met: i. The wetland has significant differences in characteristics that affect its habitat functions, such as a wetland with a forested component adjacent to a degraded emergent component or a “dual-rated” wetland with a Category I area adjacent to a lower-rated area. ii. The buffer is increased adjacent to the higher-functioning area of habitat or more sensitive portion of the wetland and decreased adjacent to the lower-functioning or less sensitive portion as demonstrated by a critical areas report from a qualified wetland professional. iii. The total area of the buffer after averaging is equal to the area required without averaging. iv. The buffer at its narrowest point is never less than either three-quarters of the required width or seventy-five feet for Categories I and II, fifty feet for Category III, and twenty-five feet for Category IV, whichever is greater. g. Averaging to allow reasonable use of a parcel may be permitted when all of the following are met: i. There are no feasible alternatives to the site design that could be accomplished without buffer averaging. ii. The averaged buffer will not result in degradation of the wetland’s functions and values as demonstrated by a critical areas report from a qualified wetland professional. iii. The total buffer area of the buffer after averaging is equal to the area without averaging. iv. The buffer at its narrowest point is never less than either three-quarters of the required width or seventy-five feet for Categories I and II, fifty feet for Category III, and twenty-five feet for Category IV, whichever is greater. 2. To facilitate long-range planning using a land-scape approach, the administrative official may identify and preassess wetlands using the rating system and establish appropriate wetland buffer widths for such wetlands. The administrative official will prepare maps of wetlands that have been preassessed in this manner. 3. Measurement of Wetland Buffers. All buffers shall be measured perpendicular from the wetland boundary as surveyed in the field. The buffer for a wetland created, restored, or enhanced as compensation for approved wetland alterations shall be the same as the buffer required for the category of the created, restored, or enhanced wetland. Buffers must be fully vegetated in order to be included in buffer area calculations. Lawns, walkways, driveways, and other mowed or paved areas will not be considered buffers or included in buffer area calculations. 4. Buffers on Mitigation Sites. All wetland mitigation sites shall have buffers consistent with the buffer requirements of this chapter. Buffers shall be based on the expected or target category of the proposed wetland mitigation site. 5. Buffer Maintenance. Except as otherwise specified or allowed in accordance with this chapter, wetland buffers shall be retained in an undisturbed or enhanced condition. In the case of compensatory mitigation sites, removal of invasive nonnative weeds is required for the duration of the mitigation bond, subsection (F)(10)(b)(i)(10) of this section. 6. Impacts to Buffers. Requirements for the compensation for impacts to buffers are outlined in subsection F of this section. 7. Overlapping Critical Areas Buffers. If buffers for two contiguous critical areas overlap (such as buffers for a stream and a wetland), the wider buffer applies. 8. Allowed Buffer Uses. The following uses may be allowed within a wetland buffer in accordance with the review procedures of this chapter, provided they are not prohibited by any other applicable law and they are conducted in a manner so as to minimize impacts to the buffer and adjacent wetland: a. Conservation and restoration activities. Conservation or restoration activities aimed at protecting the soil, water, vegetation, or wildlife. b. Passive recreation. Passive recreation facilities designed and in accordance with an approved critical areas report, including: 1. Walkways and trails; provided, that those pathways are limited to minor crossings having no adverse impact on water quality. They should be generally parallel to the perimeter of the wetland, located only in the outer twenty-five percent of the wetland buffer area, and located to avoid removal of significant trees. They should be limited to pervious surfaces no more than five feet in width for pedestrian use only. Raised boardwalks utilizing nontreated pilings may be acceptable. 2. Wildlife-viewing structures. c. Educational and scientific research activities. d. Normal and routine maintenance and repair of any existing public or private facilities within an existing right-of-way; provided, that the maintenance or repair does not increase the footprint or use of the facility or right-of-way. e. The harvesting of wild crops in a manner that is not injurious to natural reproduction of such crops, chemical applications, or alteration of the wetland by changing existing topography, water conditions, or water sources. f. Drilling for utilities/utility corridors under a buffer, with entrance/exit portals located completely outside of the wetland buffer boundary; provided, that the drilling does not interrupt the groundwater connection to the wetland or percolation of surface water down through the soil column. Specific studies by a hydrologist are necessary to determine whether the groundwater connection to the wetland or percolation of surface water down through the soil column is disturbed. g. Enhancement of a wetland buffer through the removal of nonnative invasive plant species. Removal of invasive plant species shall be restricted to hand removal. All removed plant material shall be taken away from the site and appropriately disposed of. Plants that appear on the Washington State Noxious Weed Control Board list of noxious weeds must be handled and disposed of according to a noxious weed control plan appropriate for that species. Revegetation with appropriate native species at natural densities is allowed in conjunction with removal of invasive plant species. h. Repair and maintenance of nonconforming uses or structures, where legally established within the buffer, provided they do not increase their degree of nonconformity. 9. Signs and Fencing of Wetlands and Buffers. a. Temporary Markers. The outer perimeter of the wetland buffer and the clearing limits identified by an approved permit or authorization shall be marked in the field with temporary “clearing limits” fencing in such a way as to ensure that no unauthorized intrusion will occur. The marking is subject to inspection by the administrative official prior to the commencement of permitted activities. This temporary marking shall be maintained throughout construction and shall not be removed until permanent signs, if required, are in place. b. Permanent Signs. As a condition of any permit or authorization issued pursuant to this chapter, the administrative official may require the applicant to install permanent signs along the boundary of a wetland or buffer. 1. Permanent signs shall be made of an enamelcoated metal face and attached to a metal post or other nontreated material of equal durability. Signs must be posted at an interval of one every fifty feet, or one per lot if the lot is less than fifty feet wide, and must be maintained by the property owner in perpetuity. The signs shall be worded as follows or with alternative language approved by the administrative official: Protected Wetland Area Do Not Disturb Contact the City of Yakima Regarding Uses, Restrictions, and Opportunities for Stewardship 2. The provisions of subsection (E)(9)(a) of this section may be modified as necessary to assure protection of sensitive features or wildlife. c. Fencing. 1. The applicant shall be required to install a permanent fence around the wetland or buffer when domestic grazing animals are present or may be introduced on site. 2. Fencing installed as part of a proposed activity, or as required in this subsection, shall be designed so as not to interfere with species mitigation, including fish runs, and shall be constructed in a manner that minimizes impacts to the wetland and associated habitat. F. Compensatory Mitigation. 1. Mitigation Sequencing. Before impacting any wetland or its buffer, an applicant shall demonstrate that the following actions have been taken. Actions are listed in the order of preference: a. Avoid the impact altogether by not taking a certain action or parts of an action. b. Minimize impacts by limiting the degree or magnitude of the action and its implementation, by using appropriate technology, or by taking affirmative steps to avoid or reduce impacts. c. Rectify the impact by repairing, rehabilitating, or restoring the affected environment. d. Reduce or eliminate the impact over time by preservation and maintenance operations. e. Compensate for the impact by replacing, enhancing, or providing substitute resources or environments. f. Monitor the required compensation and take remedial or corrective measures when necessary. 2. Requirements for Compensatory Mitigation. a. Compensatory mitigation for alterations to wetlands shall be used only for impacts that cannot be avoided or minimized and shall achieve equivalent or greater biologic functions. Compensatory mitigation plans shall be consistent with Wetland Mitigation in Washington State—Part 2: Developing Mitigation Plans—Version 1 (Ecology Publication No. 06-06-011b, Olympia, WA, March 2006 or as revised), and Selecting Wetland Mitigation Sites Using a Watershed Approach (Eastern Washington) (Publication No. 10-06-07, November 2010). b. Compensation ratios may also be determined using the credit/debit tool described in “Calculating Credits and Debits for Compensatory Mitigation in Wetlands of Eastern Washington: Final Report” (Ecology Publication No. 11-06-015, August 2012), consistent with subsection (F)(9) of this section. 3. Compensating for Lost or Affected Functions. Compensatory mitigation shall address the functions affected by the proposed project, with an intention to achieve functional equivalency or improvement of functions. The goal shall be for the compensatory mitigation to provide similar wetland functions as those lost, except when either: a. The lost wetland provides minimal functions, and the proposed compensatory mitigation action(s) will provide equal or greater functions or will provide functions shown to be limiting within a watershed through a formal Washington State watershed assessment plan or protocol; or b. Out-of-kind replacement of wetland type or functions will best meet watershed goals formally identified by the city, such as replacement of historically diminished wetland types. 4. Approaches to Compensatory Mitigation. Mitigation for lost or diminished wetland and buffer functions shall rely on the approaches listed below. a. Wetland Mitigation Banks. Credits from a certified wetland mitigation bank may be used to compensate for impacts consistent with the terms of the certified mitigation bank instrument. Use of credits from a wetland mitigation bank certified under Chapter 173-700 WAC is allowed if: i. The shoreline administrator determines that it would provide appropriate compensation for the proposed impacts; ii. The impact site is located in the service area of the bank or, if approved by Ecology, the bank’s interagency bank review team, and the shoreline administrator, outside of the service area; iii. The proposed use of credits is consistent with the terms and conditions of the certified mitigation bank instrument; and iv. Compensation ratios for projects using bank credits is consistent with compensation ratios specified in the certified mitigation bank instrument. b. In-Lieu-Fee Mitigation. Credits from an approved in-lieu-fee program may be used when all of the following apply: i. The shoreline administrator determines that it would provide environmentally appropriate compensation for the proposed impacts. ii. The proposed use of credits is consistent with the terms and conditions of the approved in-lieu-fee program instrument. iii. Projects using in-lieu-fee credits shall have debits associated with the proposed impacts calculated by the applicant’s qualified wetland professional using the credit assessment method specified in the approved instrument for the in-lieu-fee program. iv. The impacts are located within the service area specified in the approved in-lieu-fee instrument. c. Permittee-Responsible Mitigation. In this situation, the permittee performs the mitigation after the permit is issued and is ultimately responsible for implementation and success of the mitigation. Permittee-responsible mitigation may occur at the site of the permitted impacts or at an off-site location within the same watershed. Permittee-responsible mitigation shall be used only if the applicant’s qualified wetland professional demonstrates to the approval authority’s satisfaction that the proposed approach is ecologically preferable to use of a bank or ILF program, consistent with the criteria in this section. 5. Types of Compensatory Mitigation. Mitigation for lost or diminished wetland and buffer functions shall rely on a type listed below in order of preference. A lower-preference form of mitigation shall be used only if the applicant’s qualified wetland professional demonstrates to the approval authority’s satisfaction that all higher-ranked types of mitigation are not viable, consistent with the criteria in this section. a. Restoration. The manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural or historic functions to a former or degraded wetland. For the purpose of tracking net gains in wetland acres, restoration is divided into: i. Reestablishment. The manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural or historic functions to a former wetland. Reestablishment results in a gain in wetland acres (and functions). Activities could include removing fill material, plugging ditches, or breaking drain tiles. ii. Rehabilitation. The manipulation of the physical, chemical, or biological characteristics of a site with the goal of repairing natural or historic functions of a degraded wetland. Rehabilitation results in a gain in wetland function but does not result in a gain in wetland acres. Activities could involve breaching a dike to reconnect wetlands to a floodplain or return tidal influence to a wetland. b. Establishment (Creation). The manipulation of the physical, chemical, or biological characteristics of a site to develop a wetland on an upland or deepwater site where a wetland did not previously exist. Establishment results in a gain in wetland acres. Activities typically involve excavation of upland soils to elevations that will produce a wetland hydroperiod, create hydric soils, and support the growth of hydrophytic plant species. i. If a site is not available for wetland restoration to compensate for expected wetland and/or buffer impacts, the approval authority may authorize creation of a wetland and buffer upon demonstration by the applicant’s qualified wetland professional that: 1. The hydrology and soil conditions at the proposed mitigation site are conducive for sustaining the proposed wetland and that creation of a wetland at the site will not likely cause hydrologic problems elsewhere; 2. Adjacent land uses and site conditions do not jeopardize the viability of the proposed wetland and buffer (e.g., due to the presence of invasive plants or noxious weeds, stormwater runoff, noise, light, or other impacts); and 3. The proposed wetland and buffer will eventually be self-sustaining with little or no long-term maintenance. c. Protection/Maintenance (Preservation). Removing a threat to, or preventing the decline of, wetland conditions by an action in or near a wetland. This includes the purchase of land or easements, or repairing water control structures or fences. This term also includes activities commonly associated with the term “preservation.” Preservation does not result in a gain of wetland acres. Preserving at-risk, high-quality wetlands as part of a compensatory mitigation plan may be allowed when all of the following numbered criteria are met: i. The approval authority determines that the proposed preservation is the best mitigation option; ii. The proposed preservation site is under demonstrable threat of destruction, adverse modification, or substantive degradation due to permitted, planned, or likely actions on or off site that will not be adequately mitigated under existing regulations; iii. The area proposed for preservation is of high quality or critical for the health and ecological sustainability of the watershed or basin. Some of the following features may be indicative of high-quality sites: 1. Category I or II wetland rating (using the current version of the Washington State Wetland Rating System for Eastern Washington). This includes Wetlands of High Conservation Value as identified by Washington Department of Natural Resources’ Natural Heritage Program; 2. Rare or irreplaceable wetland type (for example, peatlands, mature forested wetlands, vernal pools, alkali wetlands) or aquatic habitat that is a rare or a limited resource in the area; 3. Habitat for threatened or endangered species (state and federal); 4. Provides biological and/or hydrological connectivity; 5. Of regional or watershed importance (e.g., listed as priority site in a watershed, salmon recovery, or basin plan); 6. Large size with high species diversity (plants, animals, or both), high abundance of native species, or both; or 7. A site that is continuous with the head of a watershed, or with a lake or pond in an upper watershed that significantly contributes to hydrologic processes and water quality; iv. Permanent protection of the wetland and buffer will be provided through a conservation easement or tract held by an appropriate natural land resource manager, such as a land trust. The approval authority may approve other legal and administrative mechanisms in lieu of a conservation easement if it determines they are adequate to protect the site; v. The site has adequate buffers to ensure that the preserved wetland will not be degraded over time. The buffer width and vegetative condition must be sufficient to protect the wetland and its functions from encroachment and degradation. Existing and potential future land uses (based on current zoning designations) dictate the width necessary for a buffer that is adequate to protect the wetland and its functions; see buffer widths in Chapter 6C in Wetland Mitigation in Washington State—Part 1: Agency Policies and Guidance (Version 2), Ecology Publication No. 21-06-003, as revised. d. Enhancement. The manipulation of the physical, chemical, or biological characteristics of a wetland site to heighten, intensify, or improve specific function(s) or to change the growth stage or composition of the vegetation present. Enhancement is undertaken for specified purposes such as water quality improvement, floodwater retention, or wildlife habitat. Enhancement results in a change in some wetland functions and can lead to a decline in other wetland functions, but does not result in a gain in wetland acres. Activities typically consist of planting vegetation, controlling nonnative or invasive species, modifying site elevations or the proportion of open water to influence hydroperiods, or some combination of these activities. Applicants proposing to enhance wetlands or associated buffers shall demonstrate how the proposed enhancement will increase the wetland’s/buffer’s functions, how this increase in function will adequately compensate for the impacts, and how existing wetland functions at the mitigation site will be protected. 6. Location of Compensatory Mitigation. Compensatory mitigation actions shall generally be conducted within the same subdrainage basin and on the site of the alteration except when the applicant can demonstrate that off-site mitigation is ecologically preferable. The following criteria will be evaluated when determining whether the proposal is ecologically preferable. When considering off-site mitigation, preference should be given to using alternative mitigation, such as a mitigation bank, an in-lieu-fee program, or advance mitigation. a. There are no reasonable opportunities on site or within the subdrainage basin (e.g., on-site options would require elimination of high-functioning upland habitat), or opportunities on site or within the subdrainage basin do not have a high likelihood of success based on a determination of the capacity of the site to compensate for the impacts. Considerations should include: anticipated replacement ratios for wetland mitigation, buffer conditions and proposed widths, available water to maintain anticipated hydrogeomorphic classes of wetlands when restored, proposed flood storage capacity, and potential to mitigate riparian fish and wildlife impacts (such as connectivity). b. On-site mitigation would require elimination of high-quality upland habitat. c. Off-site mitigation has a greater likelihood of providing equal or improved wetland functions than the altered wetland. d. Off-site locations shall be in the same subdrainage basin unless: i. Established watershed goals for water quality, flood storage or conveyance, habitat, or other wetland functions have been established by the city and strongly justify location of mitigation at another site; or ii. Credits from a state-certified wetland mitigation bank are used as compensation, and the use of credits is consistent with the terms of the certified bank instrument; iii. Fees are paid to an approved in-lieu-fee program to compensate for the impacts. e. The design for the compensatory mitigation project needs to be appropriate for its location (i.e., position in the landscape). Therefore, compensatory mitigation should not result in the creation, restoration, or enhancement of an atypical wetland. 7. Timing of Compensatory Mitigation. It is preferred that compensatory mitigation projects be completed prior to activities that will disturb wetlands. At the least, compensatory mitigation shall be completed immediately following disturbance and prior to use or occupancy of the action or development. Construction of mitigation projects shall be timed to reduce impacts to existing fisheries, wildlife, and flora. a. The administrator may authorize a one-time temporary delay in completing construction or installation of the compensatory mitigation when the applicant provides a written explanation from a qualified wetland professional as to the rationale for the delay. An appropriate rationale would include identification of the environmental conditions that could produce a high probability of failure or significant construction difficulties (e.g., project delay lapses past a fisheries window, or installing plants should be delayed until the dormant season to ensure greater survival of installed materials). The delay shall not create or perpetuate hazardous conditions or environmental damage or degradation, and the delay shall not be injurious to the health, safety, or general welfare of the public. The request for the temporary delay must include a written justification that documents the environmental constraints that preclude implementation of the compensatory mitigation plan. The justification must be verified and approved by the city. 8. Wetland Compensation Ratios. a. The following ratios in Table 09.040-4 shall apply to permittee-responsible compensation that is in kind, is the same or higher category as the impacted wetland, is the same hydrogeomorphic class as the impacted wetland, is timed concurrent with alteration, and has a high probability of success. b. These ratios do not apply to remedial actions resulting from unauthorized alterations; greater ratios shall apply in those cases. c. These ratios do not apply to the use of credits from a state-certified wetland mitigation bank, use of an ILF program, or advance mitigation implemented by the permittee. When credits from a certified bank or ILF program are used, compensation ratios should be consistent with the requirements of the bank’s or program’s certification. Ratios applicable to advance mitigation shall be determined on a case-by-case basis in consultation with state and/or federal agencies. d. The first number specifies the acreage of compensatory mitigation replacement wetlands and the second specifies the acreage of wetlands altered. e. When combining mitigation methods, compensation ratios may be adjusted consistent with Section 6B.4.2 in Wetland Mitigation in Washington State—Part 1: Agency Policies and Guidance—Version 2 (Ecology Publication No. 21-06-003, Olympia, WA, April 2021 or as revised). See also subsection (F)(5)(c) of this section for more information on using preservation as compensation. f. Increased Compensation Ratios. The shoreline administrator may increase the ratios under the following circumstances: i. Uncertainty exists as to the probable success of the proposed restoration or creation; ii. A significant period of time will elapse between adverse impact and replication of wetland functions; iii. Proposed compensatory mitigation will result in a lower category wetland or reduced functions relative to the wetland being adversely impacted; or iv. The impact was an unauthorized impact. Table 09.040-4: Standard Compensation Ratios Category and Type of Wetland | Creation or Reestablishment | Rehabilitation | Preservation1, 2 | Enhancement2 Category I | 4:1 | 8:1 | 16:1 | 16:1 Category II | 3:1 | 6:1 | 12:1 | 12:1 Category III | 2:1 | 4:1 | 8:1 | 8:1 Category IV | 1.5:1 | 3:1 | 6:1 | 6:1 Notes: 1 | All proposed preservation sites shall meet the preservation criteria listed in subsection (I)(3) of this section. To the maximum extent practicable, preservation should be done in conjunction with wetland creation and reestablishment. 2 | Applicants proposing preservation only or enhancement only should provide a complete credit-debit analysis using Calculating Credits and Debits for Compensatory Mitigation in Wetlands of Eastern Washington: Final Report (Ecology Publication No. 11-06-015, August 2012, or as revised). The ratios in the table above only apply when the credit-debit tool is not applicable. 9. Credit/Debit Method. To more fully protect functions and values, and as an alternative to the compensation ratios found in subsection (F)(8) of this section and Wetland Mitigation in Washington State—Part 1 (Ecology Publication No. 21-06-003, Olympia, WA, April 2021, or as revised), the administrator may allow mitigation based on the “credit/debit” method developed by the Department of Ecology in Calculating Credits and Debits for Compensatory Mitigation in Wetlands of Eastern Washington: Final Report (Ecology Publication No. 11-06-015, August 2012, or as revised). 10. Compensatory Mitigation Plan. When a project involves wetland and/or buffer impacts, a compensatory mitigation plan prepared by a qualified professional shall be required, meeting the following minimum standards: a. Wetland Critical Areas Report. A critical areas report for wetlands must accompany or be included in the compensatory mitigation plan and include the minimum parameters described in YMC § 17.09.010(P) and (Q)(2). b. Compensatory Mitigation Report. The report must include a written report and plan sheets that must contain, at a minimum, the following elements. Full guidance can be found in Wetland Mitigation in Washington State—Part 2: Developing Mitigation Plans (Version 1) (Ecology Publication No. 06-06-011b, Olympia, WA, March 2006, or as revised). i. The written report must contain, at a minimum: 1. The name and contact information of the applicant; the name, qualifications, and contact information for the primary author(s) of the compensatory mitigation report; a description of the proposal; a summary of the impacts and proposed compensation concept; identification of all the local, state, and/or federal wetland-related permit(s) required for the project; and a vicinity map for the project. 2. Description of how the project design has been modified to avoid, minimize, or reduce adverse impacts to wetlands. 3. Description of the existing wetland and buffer areas proposed to be impacted. Include acreage (or square footage), water regime, vegetation, soils, landscape position, surrounding lands uses, and functions. Also describe impacts in terms of acreage by Cowardin classification, hydrogeomorphic classification, and wetland rating, based on wetland ratings, subsection D of this section. 4. Description of the compensatory mitigation site, including location and rationale for selection. Include an assessment of existing conditions: acreage (or square footage) of wetlands and uplands, water regime, sources of water, vegetation, soils, landscape position, surrounding land uses, and functions. Estimate future conditions in this location if the compensation actions are not undertaken (i.e., how would this site progress through natural succession?). 5. Surface and subsurface hydrologic conditions, including an analysis of existing and proposed hydrologic regimes for enhanced, created, or restored compensatory mitigation areas. Include illustrations of how data for existing hydrologic conditions were used to determine the estimates of future hydrologic conditions. 6. A description of the proposed actions for compensation of wetland and upland areas affected by the project. Include overall goals of the proposed mitigation, including a description of the targeted functions, hydrogeomorphic classification, and categories of wetlands. 7. A description of the proposed mitigation construction activities and timing of activities. 8. Performance standards (measurable standards for years post-installation) for upland and wetland communities, a monitoring schedule, and a maintenance schedule and actions proposed by year. 9. A discussion of ongoing management practices that will protect wetlands after the development project has been implemented, including proposed monitoring and maintenance programs (for remaining wetlands and compensatory mitigation wetlands). 10. A bond estimate for the entire compensatory mitigation project, including the following elements: site preparation, plant materials, construction materials, installation oversight, maintenance twice per year for up to five years, annual monitoring field work and reporting, and contingency actions for a maximum of the total required number of years for monitoring. 11. Proof of establishment of notice on title for the wetlands and buffers on the project site, including the compensatory mitigation areas. ii. The scaled plan sheets for the compensatory mitigation must contain, at a minimum: 1. Surveyed edges of the existing wetland and buffers, proposed areas of wetland and/or buffer impacts, location of proposed wetland and/or buffer compensation actions. 2. Existing topography, ground-proofed, at two-foot contour intervals in the zone of the proposed compensation actions if any grading activity is proposed to create the compensation area(s). Also existing cross-sections of on-site wetland areas that are proposed to be impacted, and cross-section(s) (estimated one-foot intervals) for the proposed areas of wetland or buffer compensation. 3. Conditions expected from the proposed actions on site, including future hydrogeomorphic types, vegetation community types by dominant species (wetland and upland), and future water regimes. 4. Required wetland buffers for existing wetlands and proposed compensation areas. Also, identify any zones where buffers are proposed to be reduced or enlarged outside of the standards identified in this chapter. 5. A planting plan for the compensation area, including all species by proposed community type and water regime, size and type of plant material to be installed, spacing of plants, typical clustering patterns, total number of each species by community type, and timing of installation. 11. Buffer Compensation Ratios. Impacts to buffers shall be mitigated at a minimum one-to-one ratio. Compensatory buffer mitigation shall replace those buffer functions lost from development. 12. Protection of the Mitigation Site. The area where the mitigation occurred and any associated buffer shall be located in a critical area tract or a conservation easement consistent with this section. 13. Monitoring. Mitigation monitoring shall be required for a period necessary to establish that performance standards have been met, but not for a period less than five years. If a scrub-shrub or forested vegetation community is proposed, monitoring may be required for ten years or more. The project mitigation plan shall include monitoring elements that ensure certainty of success for the project’s natural resource values and functions. If the mitigation goals are not obtained within the initial five-year period, the applicant remains responsible for restoration of the natural resource values and functions until the mitigation goals agreed to in the mitigation plan are achieved. 14. Advance Mitigation. Mitigation for projects with preidentified impacts to wetlands may be constructed in advance of the impacts if the mitigation is implemented according to federal rules, state policy on advance mitigation, and state water quality regulations consistent with Interagency Regulatory Guide: Advance Permittee-Responsible Mitigation (Ecology Publication No. 12-06-015, Olympia, WA, December 2012). 15. Alternative Mitigation Plans. The administrator may approve alternative wetland mitigation plans that are based on the most current, accurate and complete scientific and technical information, such as priority restoration plans that achieve restoration goals identified in the SMP. Alternative mitigation proposals must provide an equivalent or better level of protection of wetland functions and values than would be provided by the strict application of this chapter. The administrative official shall consider the following for approval of an alternative mitigation proposal: a. The proposal uses a watershed approach consistent with Selecting Wetland Mitigation Sites Using a Watershed Approach (Eastern Washington) (Ecology Publication No. 10-06-07, November 2010). b. Creation or enhancement of a larger system of natural areas and open space is preferable to the preservation of many individual habitat areas. c. Mitigation according to subsection (F)(5) of this section is not feasible due to site constraints such as parcel size, stream type, wetland category, or geologic hazards. d. There is clear potential for success of the proposed mitigation at the proposed mitigation site. e. The plan shall contain clear and measurable standards for achieving compliance with the specific provisions of the plan. A monitoring plan shall, at a minimum, meet the provisions in subsection (F)(10) of this section. f. The plan shall be reviewed and approved as part of overall approval of the proposed use. g. A wetland of a different type may be justified based on regional needs or functions and values; the replacement ratios may not be reduced or eliminated unless the reduction results in a preferred environmental alternative. h. Mitigation guarantees shall meet the minimum requirements as outlined in subsection (F)(10)(b)(i)(8) of this section. i. Qualified professionals in each of the critical areas addressed shall prepare the plan. j. The city may consult with agencies with expertise and jurisdiction over the critical areas during the review to assist with analysis and identification of appropriate performance measures that adequately safeguard critical areas.

( Ord. 2015-002 § 1 (Exh. A), 2015 ; Ord. 2017-017 § 2 (Exh. B), 2017 ; Ord. 2021-015 § 2 (Exh. A), 2021 )

Ask a question about Yakima law

Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.