§ 7.65.080 — Slugload or accidental discharges
Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 7.65.080
Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/4c39e9c2-fa73-4a06-95c4-2bca7db5379b
§ 7.65.080: Slugload or accidental discharges.
A. Each discharger shall provide protection from a slugload or accidental discharge of prohibited or regulated materials or substances established by this chapter. Where the city deems it necessary, a discharger shall provide and maintain, at the discharger’s own cost and expense, facilities and operating procedures to prevent a slugload or accidental discharge of prohibited materials. When requested to do so, the discharger shall submit to the wastewater manager for review a “slugload control/spill prevention, control and countermeasure plan” (SC/SPCC plan) showing facilities and operating procedures to provide this protection. The wastewater manager shall evaluate, at least once every two years and within one year of a user’s initial designation as a significant industrial discharger, whether each significant industrial user needs an SC/SPCC plan. The SC/SPCC plan shall contain at a minimum the following elements: 1. Description of discharge practices for batch and continuous processes, including nonroutine and routine batch discharges; 2. Description of stored hazardous substances, including quantity maintained for each listed material and a map showing their location; 3. Procedures for immediately notifying the city and any other authorities of any accidental or slugload discharges, with procedures for follow-up written notification within five days; and 4. Procedures to prevent adverse impact from any accidental or slugload discharge, including, but not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants (including solvents), and/or measures and equipment for emergency response. Where applicable, the SC/SPCC plan shall also conform to guidelines found in 40 CFR, Part 112 and to Ecology’s “Guidelines to Prevent, Control, and Contain Spills from the Bulk Storage of Petroleum Products” (WDOE 83-8), as now or as they may be amended. Each discharger shall complete its SC/SPCC plan and submit it to the wastewater manager within one hundred twenty days of being notified by the manager to do so. The wastewater manager will review the SC/SPCC plan before construction of any prevention facility. No discharger who discharges to the POTW after the aforesaid date shall be permitted to introduce pollutants into the system until such SC/SPCC plan has been reviewed by the wastewater manager. Review of such plan by the wastewater manager shall not relieve the discharger from the responsibility to modify its facility as necessary to meet the requirements of this chapter. B. A discharger who has prepared an SC/SPCC plan shall review and evaluate such plan at least every two years from the date of submittal. As a result of this review and evaluation, the discharger shall amend the SC/SPCC plan within six months of the review to include more effective prevention and control technology if: (1) such technology will significantly reduce the likelihood of a spill event from the facility, and (2) if such technology has been field-proven at the time of the review. The plan shall be maintained on the plant site and readily available to facility personnel. C. Dischargers shall verbally notify the wastewater manager immediately upon the occurrence of a slugload or accidental discharge of substances prohibited by this chapter and take immediate action to correct the situation. Within five days after the occurrence of the slugload or accidental discharge, the discharger shall follow up with a written notification to the wastewater division. The notifications shall include location of discharge, date and time thereof, type of waste, concentration and volume, and corrective actions taken or to be taken. Any discharger who discharges a slugload of prohibited materials shall be liable for any expense, loss or damage to the POTW, in addition to any other liabilities established by this chapter or other city ordinance and the amount of any fines, penalties, damages or costs assessed against the city by any state or federal agency, court of law or private individual, as a result of the slugload or accidental discharge. D. Signs shall be permanently posted in conspicuous places on discharger’s premises, advising employees whom to call in the event of a slug or accidental discharge. Employers shall instruct all employees who may cause or discover such a discharge with respect to emergency notification procedures. E. Significant industrial users shall verbally notify the wastewater manager immediately of any changes in its facility or operating procedures that will affect its potential for slug discharges. Within five days of its verbal notification, the discharger shall follow up with a written notification to the wastewater division. Changes that will affect a facility’s potential for slug discharges include, but are not limited to, significant changes to the hazardous substances stored at the facility and changes to the discharge practices associated with the facility’s operating procedures.
( Ord. 2003-74 § 1 (part), 2003 ; Ord. 2007-26 § 1 (part), 2007 )
Ask a question about Yakima law
Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.
