§ 7.67.030 — Minimum project size
Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 7.67.030
Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/c24038c1-bf03-49e1-a7f5-5d975734191b
§ 7.67.030: Minimum project size.
In order to be eligible for a reimbursement agreement, the estimated cost of the proposed improvement must not be less than five thousand dollars. The estimated cost of the improvement shall be determined by the engineer, based upon a construction contract for the project, bids, engineering or architectural estimates or other information deemed by the engineer to be a reliable basis for estimating costs. The determination of the engineer shall be final.
( Ord. 2016-016 § 1 (part), 2016 )
Ask a question about Yakima law
Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.
