For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7.67.060 — Engineer’s determination – Review by city manager

Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 7.67.060

Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/351cd53b-ab40-4ac4-b874-621751cc2b72

§ 7.67.060: Engineer’s determination – Review by city manager.

A. The engineer shall review all applications and shall approve the application if the following requirements are met: 1. The project satisfies the minimum size requirement; 2. The proposed improvements fall within the description of water or sewer facilities as those described in RCW Chapter 35.91; and 3. The proposed improvements are not constructed or currently under construction. B. In the event all of the above criteria are not satisfied, the engineer may condition approval as necessary in order for the application to conform to such criteria, or shall deny the application. The final determination of the engineer shall be in writing. The applicant may obtain a review of the final determination by filing a request there-for with the city clerk no later than ten days after the city has mailed a copy of the final determination to the applicant at the address listed on the application. C. In reviewing a final determination, the city manager shall apply the criteria set forth above, and shall uphold the decision of the engineer unless evidence presented by the applicant clearly demonstrates that the criteria have been satisfied.

( Ord. 2016-016 § 1 (part), 2016 )

Ask a question about Yakima law

Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.