For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 44-1658 — Code compliance

Municipal Code, City of Green Bay, Wisconsin (Supp. 10: codified through Ordinance No. 11-26, enacted July 21, 2026 (online updated October 12, 2026)) · Green Bay Municipal Code § 44-1658

Corpus is an independent public-information project, not the official City of Green Bay website. Stable reference: corpuslaw.us/code/efa105e8-9ee8-4808-8c40-171d2722b355

Sec. 44-1658. - Code compliance.

(a) A solar energy system shall comply with all applicable state and local construction, electrical and plumbing codes, where applicable. (b) Solar energy systems that connect to the electric utility shall comply with Wis. Admin. Code Ch. PSC 119, Rules for Interconnecting Distributed Generation Facilities. (c) The design of the solar energy system shall conform to applicable industry standards. (d) No grid-intertie photovoltaic system shall be installed until evidence has been given to the Green Bay Building Inspection Department that the owner has submitted the required PSC6027 or PSC6028 to Wisconsin Public Service. Off-grid systems are exempt from this requirement.

(Code 1984, § 13.1611(d); Ord. No. 9-12; Ord. No. 13-14)

Ask a question about Green Bay law

Corpus searches the Green Bay sections it holds and shows the ones that match, with their citations. Free, no sign-in.