For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 44-1659 — Site plan review and building plan and permit requirements

Municipal Code, City of Green Bay, Wisconsin (Supp. 10: codified through Ordinance No. 11-26, enacted July 21, 2026 (online updated October 12, 2026)) · Green Bay Municipal Code § 44-1659

Corpus is an independent public-information project, not the official City of Green Bay website. Stable reference: corpuslaw.us/code/3de04c9b-2ed9-420c-8e67-7732599110a4

Sec. 44-1659. - Site plan review and building plan and permit requirements.

(a) All applications for permits shall comply with the requirements of Article XIX of this chapter, Site Plan Review, building plans and a building permit shall be required for the installation of a solar energy system. (b) The site plan application shall include but not be limited to the following: (1) Property lines and physical dimensions of the property. (2) Location, dimensions, and types of existing major structures on the property. (3) Location of the proposed solar energy system and any overhead utility lines. (4) The right-of-way of any public road that is contiguous with the property. (5) Solar energy system mounting plan and details of any support or structural components. (6) A written description of solar panel tracking mechanism and a detailed layout of orientation limits.

(Code 1984, § 13.1611(e); Ord. No. 9-12; Ord. No. 13-14)

Ask a question about Green Bay law

Corpus searches the Green Bay sections it holds and shows the ones that match, with their citations. Free, no sign-in.