Sec. 10-23. - Masonry precautions.
All masonry shall be protected against freezing for not less than 48 hours after installation and shall not be constructed below 28 degrees Fahrenheit on rising temperatures or below 36 degrees Fahrenheit on falling temperatures without temporary heated enclosures or without heating materials or other approved precautions necessary to prevent freezing. No frozen materials shall be used or shall frozen materials be built upon. In warm weather, all clay or shale units of high absorption characteristics shall be thoroughly wet before laying in the wall. All other masonry units, except gypsum units, laid in other than lime mortar, shall be wetted before laying in the wall if the absorption resulting from partial immersion in one-eighth inch of water for one minute is less than one percent. All masonry construction shall be adequately braced and supported to ensure its stability during construction.
(Code 1976, § 15.01.245)
Ask a question about Janesville law
Corpus searches the Janesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.