§ 17.06 — Final Plat
Code of General Ordinances of the City of Kenosha, Wisconsin (Codified through Ordinance No. 33-26, adopted September 9, 2026. (Supp. No. 11, Update 2)) · Kenosha Code of General Ordinances § 17.06
Corpus is an independent public-information project, not the official City of Kenosha website. Stable reference: corpuslaw.us/code/1fceaad5-c6c1-4c5c-8500-a5a454e99fd5
17.06. - Final Plat.
A. General. A Final Plat prepared by a registered land surveyor shall be required for all proposed Subdivisions. It shall comply in all respects with the requirements of Wis. Stats. § 236.20, and this Chapter. The sheet size for the Final Plat shall be twenty-two (22) inches by thirty (30) inches. B. Required Information. The Plat shall show correctly on its face, in addition to the information required by Wis. Stats. § 236.20, the following: 1. Exact length and bearing of the centerline of all streets. 2. Exact street width along the line of any obliquely intersecting street. 3. Railway rights-of-way within and abutting the Plat. 4. Utility and drainage easements. 5. All lands reserved for future public acquisition or reserved for the common use of property owners within the Plat. 6. A drainage plan for all lots in the Plat bearing a statement concerning the relationship and direction of flow of all drainage swales, ponds, or other facilities to each other. 7. Special restrictions required by the City Plan Commission relating to access control along Public Ways, to the provision of planting strips, to more restrictive yard requirements, or to special restrictions for environmentally significant lands, or to serve any other special needs of the City or Water Utility. 8. Plat shall include the entirety of all parcels involved in the proposed Subdivision. C. Survey Accuracy. The City Engineer shall examine all Final Plats within the City and may make, or cause to be made by a registered land surveyor under the supervision or direction of the City Engineer, such field checks as the City Engineer may deem necessary or desirable for the accuracy and closure of survey, the proper kind and location of monuments and the legibility and completeness of the drawing. D. State Plane Coordinate System. Where the Plat is located within a U.S. Public Land Survey quarter section, the corners of which have been relocated, monumented and placed on the State Plane Coordinate System by the City of Kenosha, Kenosha County or the Southeastern Wisconsin Regional Planning Commission, the Plat shall be tied directly to one or more of the section or quarter corners so relocated, monumented and coordinated. The exact grid bearing and distance of such tie shall be determined by field measurements, and the type of monument and Wisconsin State Plane Coordinates of the monument marking the relocated section or quarter corner to which the Plat is tied shall be indicated on the Plat. All distances and bearings shall be referenced to the Wisconsin Coordinate System, South Zone. E. Traffic Impact Study. The City Plan Commission may require the Subdivider to submit a Traffic Impact Study for the proposed Certified Survey Map if it is determined that the proposed Certified Survey Map could create significantly increased traffic on existing streets bordering or serving the proposed Subdivision. The study may be used as a basis to require the Subdivider to pay a fair, pro rata share of the costs of street improvements and traffic control signs and signals which serve the proposed Subdivision. F. Certificates. All Final Plats shall provide all certificates required by Wis. Stats. § 236.21; and, in addition, the surveyor shall certify compliance with all the provisions of this Chapter. Model certificates are provided by the Department of City Development. G. Recordation. The Final Plat shall only be recorded with the County Register of Deeds after the certificates of the Wisconsin Department of Administration, of the Common Council, of the surveyor, and those certificates required by Wis. Stats § 236.21, are placed on the face of the Plat and executed by all parties. Upon recordation of the Plat, Subdivider shall submit copies of the Plat and all engineering drawings to the Department of City Development in digital formats approved by said Department.
Ask a question about Kenosha law
Corpus searches the Kenosha sections it holds and shows the ones that match, with their citations. Free, no sign-in.
