§ 17.12 — Construction
Code of General Ordinances of the City of Kenosha, Wisconsin (Codified through Ordinance No. 33-26, adopted September 9, 2026. (Supp. No. 11, Update 2)) · Kenosha Code of General Ordinances § 17.12
Corpus is an independent public-information project, not the official City of Kenosha website. Stable reference: corpuslaw.us/code/864a9cc4-1e44-44a8-9913-abe711d76f66
17.12. - Construction.
A. Commencement. No construction or installation of improvements shall commence in a proposed Land Division until the Final Plat or Certified Survey Map and Development Agreement has been approved by the Common Council, the Development Agreement has been signed, all required assurances have been received and approved, and the Director of City Development has given written authorization to proceed. Inspection fees shall be required to be paid as specified in the Development Agreement. B. Plans. The following plans and construction specifications shall be provided by the Subdivider at the Subdivider's expense, and reviewed and approved by the City Engineer and the Kenosha Water Utility General Manager before authorization of construction or installation of improvements. 1. Street plans and profiles showing existing and proposed grades, elevations and cross-sections of required improvements. 2. Sanitary sewer plans and profiles showing the locations, grades, sizes, elevations and materials of required facilities. 3. Storm sewer and storm water detention/retention plans and profiles showing the locations, grades, sizes, cross-sections, elevations and materials of required facilities. 4. Water main plans and profiles showing the locations, sizes, elevations and materials of required facilities. 5. Erosion and sedimentation control plans showing those structures required to retard the rate of runoff water and those grading and excavating practices that will prevent erosion and sedimentation. The time span that soil will be exposed, and plans to protect existing vegetation (fences, tree wells, etc.) shall be prepared and such plans shall generally follow the guidelines and standards set forth in the Wisconsin Department of Natural Resources (DNR) publication Wisconsin Construction Site Best Management Practices Handbook, as amended from time to time. 6. Planting plans showing the locations, age, diameter size six (6) inches above grade, and species of any required grasses, vines, shrubs and trees. 7. Grading/drainage plans showing lot and street drainage. 8. Additional special plans or information as required by the Director of City Development. C. Building Permits. 1. No Building Permit shall be issued for a Residential Real Estate Development until the following conditions have all been met: a. The Land Division and Development Agreement have been approved, signed and recorded with the Kenosha County Register of Deeds. b. All required public improvements, including all retention/detention basins and outlet structures, must be installed and functional. c. The binder course of asphalt on streets and curb and gutter must be installed. d. The Land Division must be graded in accordance with the approved grading plan. e. As-built plans of all required improvements, including all retention/detention basins and outlet structures, in acceptable print and digital form must be submitted to the Department of City Development, the City Engineer, and the General Manager of the Kenosha Water Utility. 2. No Building Permit shall be issued for a Commercial Real Estate Development until the following conditions have all been met: a. The Land Division and Development Agreement has been approved, signed and recorded with the Kenosha County Register of Deeds. b. Access to the Land Division for all required inspections acceptable to the Department of City Development, the City Engineer and the General Manager of the Kenosha Water Utility must be provided. D. Temporary Certificate of Occupancy. No Temporary Certificate of Occupancy shall be issued for a Commercial Real Estate Development until the following conditions have all been met. 1. All required public improvements must be installed and functional. 2. The Land Division must be graded in accordance with the approved grading plan. 3. As-built plans of all required public improvements in acceptable print and digital form must be submitted to the Department of City Development, the City Engineer, and the General Manager of the Kenosha Water Utility. 4. All required storm water drainage facilities, including retention/detention basins and outlet structures must be installed and functional. 5. As-built plans of all required storm water drainage facilities, including retention/detention basins and outlet structures, in acceptable print and digital form must be submitted to the Department of City Development, the City Engineer, and the General Manager of the Kenosha Water Utility. E. Inspection. The Subdivider, prior to commencing any work within the Subdivision, shall notify the City Engineer and the Kenosha Water Utility General Manager of the proposed work and to make arrangements to provide for adequate inspection. The appropriate City and Water Utility officials shall inspect and approve all completed work prior to release of the assurances for the improvements installed by the Subdivider in accordance with a Development Agreement. The Subdivider is responsible for paying all the costs of inspection. F. As-Built Plans Required. Prior to completion and acceptance by the City and Kenosha Water Utility of all improvements, the Subdivider shall provide a copy of all of the improvement plans, as-built in print and in a digital format satisfactory to the City Engineer and Kenosha Water Utility General Manager.
Ask a question about Kenosha law
Corpus searches the Kenosha sections it holds and shows the ones that match, with their citations. Free, no sign-in.