§ 33.10 — Erosion Control Permits and Administration
Code of General Ordinances of the City of Kenosha, Wisconsin (Codified through Ordinance No. 33-26, adopted September 9, 2026. (Supp. No. 11, Update 2)) · Kenosha Code of General Ordinances § 33.10
Corpus is an independent public-information project, not the official City of Kenosha website. Stable reference: corpuslaw.us/code/d20ee2a7-a895-4acd-a511-b1d49b2d0cc5
33.10. - Erosion Control Permits and Administration.
A. Erosion Control Permits Required. No activity shall occur and no Building Permit may be issued until an Erosion Control Permit is issued by the Code Official. B. Permit Application. The applicant must provide the following when requesting a permit: 1. A completed application form signed by the landowner. If a landowner appoints an agent to submit an application, the landowner shall be bound by all of the requirements of this Chapter and the terms of any permit issued to the agent. 2. An Erosion Control Plan meeting all the standards of the Wisconsin Department of Natural Resources (WDNR) and the Wisconsin Department of Commerce. 3. Copies of permits or permit applications or approvals required by any other governmental entity. 4. A proposed timetable and schedule for completion and installation of all elements of approved Erosion Control Plans and a detailed schedule of completion of construction. 5. Projects of a smaller scale may be allowed relief from some permit application requirements at the discretion of the Code Official. C. Permit Approval. The Code Official shall verify that the permit application is complete. Upon approval, the Erosion Control Permit shall be issued after the applicant has met all other requirements of this Chapter. D. Permit Conditions. 1. Plan Implementation. The Erosion Control Plan shall be implemented prior to the start of any land-disturbing activity and shall be maintained over the duration of the project. 2. Permittee Responsibilities. The permittee is responsible for the successful completion of the Erosion Control Plan. The permittee shall be liable for all costs incurred, including environmental restoration costs, resulting from noncompliance with an approved plan. 3. Permission to Enter Property for Inspection. Application for a permit shall constitute express permission by the permittee and landowner for the Code Official to enter the property for purposes of inspection under Section 33.08.E. of this Chapter or for curative action. 4. Adjacent Public Thoroughfares to be Cleaned. All mudtracking off-site onto adjacent public and private thoroughfares shall be cleaned up and removed by the end of each working day or at the discretion of the Code Official using proper disposal methods. 5. Approved Permit and Erosion Control Plan Kept on Project Site. A copy of the approved permit and Erosion Control Plan shall be kept on the project site, or in a place readily accessible to contractors, engineers, inspection staff and other authorized personnel. 6. One- and Two-Family Erosion Control Permit Requirements. The landowner shall be responsible for construction site and erosion control maintenance and grading work at the project site, and for proper restoration in compliance with this Chapter. All items listed below shall be complied with: a. All required drainage structures and appurtenances shall meet City specifications and approved grading and drainage plans. b. All required ditches, swales, berms, drainage easements and waterways located within the boundary of the referenced site or within the adjacent road right-of-way and area lying adjacent to the site shall be graded to the proper gradient and side slope, and meet the approved elevations, and shall be seeded or sodded and stabilized. c. The finished or final yard elevation and slope around the perimeter of any new structure, along with the entire site area, shall be final graded and finished with topsoil and seeded or sodded to the required elevations as shown on the approved Building Permit Plat of Survey as submitted at the time of Building Permit issuance. If seeded, the parkway, a ten (10) foot perimeter along any public sidewalk or right-of-way, and any drainageway, including downspout channels, shall be protected by erosion control matting or other approved method. If a structure or project is completed between September 15 and May 1 of any given year, the site may be rough graded so as to prevent runoff, and erosion control measures are to be installed and maintained until the site can be final graded and stabilized, but in no case later than June 1 of the following year. d. All roof drainage and sump pump discharge shall be outletted to the street yard, natural drainageway or approved storm sewer system so as not to saturate, accumulate or damage the subject property or adjacent properties. e. Gutters and downspouts, or roof leaders and downspouts, shall be installed on all principal structures in order to direct water runoff away from the structures to the street yard, natural drainageway or approved storm sewer system. f. The site shall be cleared of rubbish, brush and any other debris. Construction materials, other unused materials, clay or fill piles shall be removed from the site. g. A Plat of Survey prepared by a Wisconsin registered land surveyor or Wisconsin licensed professional engineer shall be submitted showing proposed elevations as approved by the City, and actual final elevations in the following locations: (1) At the property corners and at all corners of the structures. (2) At twenty-five (25) foot intervals along each property line. E. Permit Duration. Permits issued under this Section shall be valid for a period of one hundred eighty (180) days from the date of issue, or for the pendency of the Building Permit or other construction authorizations, whichever is longer. F. Extensions of Time to Complete Work. Any applicant who obtains a permit and fails to complete the work in the time specified in Subsection 33.10.E., may apply to the Code Official for a time extension not to exceed one (1) year. Extensions may be granted if the work commenced has proceeded in a professional and workmanlike manner which exhibits reasonably progress. Extended permits shall not impose new conditions unless required by this Chapter, or any other State or local law, rule or regulation. In the event that the Code Official denies the request for extension, such denial may be appealed to the Stormwater Utility Committee. Such appeal must be filed in the office of the City Clerk/Treasurer within thirty (30) days of the denial. There is no fee for this appeal. Upon a violation of Subsection 33.10.E., no new work may commence without the issuance of an approved extension or a new permit. G. Cash Assurance. At the time a preliminary grading or mass grading Erosion Control Permit is issued to any project involving one (1) or more acres of land-disturbing construction activity, the landowner shall submit a payment of five thousand dollars ($5,000.00) to guarantee that the conditions of the Erosion Control Permit and this Chapter are being followed as they relate to maintaining the public right-of-way and storm sewer system. The cash assurance shall be used if the City determines that the landowner or his/her contractor have not kept the rights-of-way clean from mudtracking, if there is damage to the stormwater drainage improvements, or if erosion and sediment controls are not being maintained. If the cash assurance is depleted prior to completion of the project, the landowner shall post another cash assurance in the same amount. The cash assurance shall be refunded to the landowner once the project is completed and it is determined that the property is in compliance with this Chapter. H. Soil Stockpiles. 1. Review and Approval Required. Soil stockpiles are permitted only when reviewed and approved as part of an Erosion Control Permit for site mass grading or new building construction, or other approved land-disturbing activities. 2. Location. Soil stockpiles shall not be located in close proximity to any public street or alley, and in all cases shall be located as indicated on the approved plan. Requested changes of location shall require a revised plan and approval of the Code Official. 3. Removal. All soil stockpiles shall be removed from the site or graded to meet the approved drainage plan at the time the permit expires, or at the time a Temporary Occupancy Permit is issued to any project connected with that particular site, whichever occurs sooner. I. Project Site Maintenance. 1. Responsibility of Landowner. It shall be the responsibility of the landowner to maintain the project site and adjoining right-of-way in conformance with the following: a. Free from debris, rubbish, unused building materials, scraps, etc. All such materials shall be collected in a covered dumpster or other approved container. b. Grass, weeds and vegetation shall not exceed a height of eight (8) inches. 2. Failure to Comply with Order(s). In the event that the responsible party fails to comply with an order to clean the site or to cut grass, weeds or vegetation, the Code Official may have the work done, and shall recover the cost through special assessments levied against the property. A one hundred dollar ($100.00) Administrative Fee for processing and administering the special assessment shall be added to the special assessment against the property. J. Inspections. 1. Implied Consent. Application for a permit shall constitute permission by the applicant and landowner for the Code Official, or his/her designee, to enter upon the property and inspect during the construction phase prior to the inspections, as may be deemed necessary to confirm compliance with the requirements of this Chapter. 2. Number of Inspections. The site of any regulated land disturbing activity shall be inspected once every thirty (30) days, or more frequently as determined by the Code Official during the construction phase. 3. Compliance Verification. Within ten (10) days after installation of all practices in an approved Erosion Control Plan and achievement of soil stabilization, the permittee shall notify the Code Official. The Code Official shall inspect the property to verify compliance with the Erosion Control Plan within ten (10) days of notification of soil stabilization. 4. Maintenance. Maintenance, as outlined in Commerce 21.125 and Commerce 60.20, Wisconsin Administrative Code, is the responsibility of the owner, and facilities are subject to inspection and orders for repair. K. Permit Transfers. 1. Approval. When a permittee and landowner act to transfer an interest in property subject to an approved plan prior to the completion of the proposed steps to attain soil stabilization, the permittee must secure approval from the Code Official. 2. Responsibility to Comply with Minimum Standards. When a permittee and landowner transfer ownership, possession or control of real estate subject to either or both an uncompleted Erosion Control Plan, the successor in interest to any portion of the real estate shall be responsible to control soil erosion and runoff and shall comply with the minimum standards provided in this Chapter. L. Plan or Permit Amendments. Any proposed modifications to approved plans, construction schedules or alterations to accepted sequencing of land disturbing site activities shall be approved by the Code Official in consultation with the plan review agency prior to implementation of said changes.
Ask a question about Kenosha law
Corpus searches the Kenosha sections it holds and shows the ones that match, with their citations. Free, no sign-in.