§ 33.11 — Erosion and Sediment Control Plan, Statement and Amendments

Code of General Ordinances of the City of Kenosha, Wisconsin (Codified through Ordinance No. 33-26, adopted September 9, 2026. (Supp. No. 11, Update 2)) · Kenosha Code of General Ordinances § 33.11

Corpus is an independent public-information project, not the official City of Kenosha website. Stable reference: corpuslaw.us/code/dc43315c-9210-4be6-b39f-c3741252f1cf

33.11. - Erosion and Sediment Control Plan, Statement and Amendments.

A. Erosion and Sediment Control Plan. 1. An Erosion and Sediment Control Plan shall be prepared and submitted to the Code Official. 2. The Erosion and Sediment Control Plan shall be designed to meet the performance standards in Section 33.09 and other requirements of this Chapter. 3. The Erosion and Sediment Control Plan shall address pollution caused by soil erosion and sedimentation during construction and up to final stabilization of the site. The Erosion and Sediment Control Plan shall include, at a minimum, the following items: a. The name(s) and address(es) of the owner or developer of the site, and of any consulting firm retained by the applicant, together with the name of the applicant's principal contact at such firm. The application shall also include start and end dates for construction. b. Description of the site and the nature of the construction activity, including representation of the limits of land disturbance on a United State Geological Service 7.5 minute series topographic map. c. A sequence of construction of the development site, including stripping and clearing; rough grading; construction of utilities, infrastructure, and buildings; and final grading and landscaping. Sequencing shall identify the expected date on which clearing will begin, the estimated duration of exposure of cleared areas, areas of clearing, installation of temporary erosion and sediment control measures, and establishment of permanent vegetation. d. Estimates of the total area of the site and the total area of the site that is expected to be disturbed by construction activities. e. Estimates, including calculations, if any, of the runoff coefficient of the site before and after construction activities are completed. f. Calculations to show the expected percent reduction in the average annual sediment load carried in runoff as compared to no sediment or erosion controls. g. Existing data describing the surface soil as well as subsoils. h. Depth to groundwater, as indicated by Natural Resources Conservation Service soil information, where available. i. Name of the immediate named receiving water from the United States Geological Service 7.5 minute series topographic maps. j. For building construction sites, the following shall also be required: (1) Property lines, lot dimensions and limits of disturbed areas. (2) Limits of impervious area, including buildings. Include all public and private roads, interior roads, driveways and parking lots, and indicate the type of paving and surfacing material. (3) Cross-sections of and profiles of channels, swales and road ditches. (4) Culvert sizes, if applicable. (5) Direction of flow of runoff. (6) Design discharge for ditches and structural measures. (7) Runoff velocities. (8) Fertilizer and seeding rates and recommendations, if applicable. (9) Time schedules for stabilization of ditches and slopes. (10) Description of methods by which sites are to be developed and a detailed land disturbance schedule, including time schedules for stabilization of ditches and slopes. (11) Provision for sequential steps mitigating erosive effect of land disturbing activities to be followed in appropriate order and in a manner consistent with accepted erosion control methodology suitable to proposed sites and amenable to prompt revegetation, including runoff calculations as appropriate. (12) Provisions to prevent mudtracking off-site onto public thoroughfares during the construction period. (13) Provisions to disconnect impervious surfaces, where feasible. (14) Provisions to prevent sediment delivery to and accumulation in any proposed or existing stormwater conveyance systems. (15) Copies of permits or permit applications required by any other unit of government or agency. (16) Existing and proposed elevations, and existing and proposed contours in the area, where deemed necessary. (17) Any other information necessary to reasonably determine the location, nature and condition of any physical or environmental features of the site. (18) Soil storage piles and length of time to be left undisturbed. (19) Basin and retention area stabilization details. 4. Plan Checklists shall be reviewed by the Code Official for completeness and accuracy. 5. All Best Management Practices (BMPs) shall be designed to meet the criteria identified by or developed by the Wisconsin Department of Natural Resources as set forth in Chapters NR 151, Commerce 20-21 and Commerce 60-65, Wisconsin Administrative Code. In addition, the Wisconsin Department of Transportation Erosion Control Product Acceptability List (WIS DOT PAL) may be used as a reference. 6. The Erosion and Sediment Control Plan shall include a site map. The site map shall include the following items and shall be at a scale not greater than two hundred (200) feet per inch and at a contour interval not to exceed five (5) feet. a. Existing topography, vegetative cover, natural and engineered drainage systems, roads and surface waters. Lakes, streams, wetlands, channels, ditches and other watercourses on and immediately adjacent to the site shall be shown. Any identified one hundred (100) year flood plains, flood fringes and floodways shall also be shown. b. Boundaries of the construction site. c. Drainage patterns and approximate slopes anticipated after major grading activities. d. Areas of soil disturbance. e. Location of major structural and non-structural controls identified in the plan. f. Location of areas where stabilization practices will be employed. g. Areas which will be vegetated following construction. h. Areal extent of wetland acreage on the site and locations where stormwater is discharged to a surface water or wetland. i. Locations of all surface waters and wetlands within one (1) mile of the construction site. j. An alphanumeric or equivalent grid overlying the entire construction site map. 7. Each Erosion and Sediment Control Plan shall include a description of appropriate controls and measures that will be performed at the site to prevent pollutants from reaching the waters of the State. The plan shall clearly describe the appropriate control measures for each major activity and the timing during the construction process that the measures will be implemented. The description of erosion controls shall include, when appropriate, the following minimum requirements: a. Description of interim and permanent stabilization practices, including a practice implementation schedule. Site plans shall ensure that existing vegetation is preserved where attainable and that disturbed portions of the site are stabilized. b. Description of structural practices to divert flow away from exposed soils, store flows or otherwise limit runoff and the discharge of pollutants from the site. Unless otherwise specifically approved in writing by the Code Official, structural measures shall be installed on upland controls. c. Management of overland flow at all sites, unless otherwise controlled by outfall controls. d. Trapping of sediment in channelized flow. e. Staging construction to limit bare areas subject to erosion. f. Protection of downslope drainage inlets where they occur. g. Minimization of tracking at all sites. h. Cleanup of off-site sediment deposits. i. Proper disposal of building and waste materials at all sites. j. Stabilization of drainageways. k. Control of soil erosion from dirt stockpiles. l. Installation of permanent stabilization practices as soon as possible after final grading. m. Minimization of dust to the maximum extent practicable. 8. The Erosion and Sediment Control Plan shall require that velocity dissipation devices be placed at discharge locations and along the length of any outfall channel, as necessary, to provide non-erosive flow from the structure to a watercourse so that the natural physical and biological characteristics and functions are maintained and protected. B. Erosion and Sediment Control Plan Statement. For each construction site identified under Section 33.04, an Erosion and Sediment Control Plan statement shall be prepared. This statement shall be submitted to the Code Official. The control plan statement shall briefly described the site, including a site map. Further, it shall also include the best management practices that will be used to meet the requirements of the Chapter, including the site development scheduled. C. Amendments. The applicant shall amend the plan if any of the following occur: 1. There is a change in design, construction, operation or maintenance at the site which has the reasonable potential for the discharge of pollutants to waters of the State and which has not otherwise been addressed in the plan. 2. The actions required by the plan fail to reduce the impacts of pollutants carried by the construction site runoff. 3. The Code Official notifies the applicant of changes needed in the plan.