For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 105-29 — Erosion and sediment control plan, statement and amendment

Municipal Code of the City of La Crosse, Wisconsin (Codified through Ordinance No. 5384, enacted August 13, 2026. (Supp. No. 43)) · La Crosse Municipal Code § 105-29

Corpus is an independent public-information project, not the official City of La Crosse website. Stable reference: corpuslaw.us/code/946fda67-26da-40a5-8db8-8802185b799e

Sec. 105-29. - Erosion and sediment control plan, statement and amendment.

(a) Erosion and sediment control plan statement. (1) For each construction site an erosion and sediment control plan statement shall be prepared by the applicant. This statement shall be submitted to Community Risk Management. The erosion and sediment control plan statement shall briefly describe the site, the development schedule, and the BMPs that will be used to meet the requirements of the ordinance. A site map shall also accompany the erosion and sediment control plan statement. (2) If the proposed land-disturbing activity involves less than one-half acre of land, instead of the requirements of subsection (a)(1), the permit applicant may submit a simplified erosion and sediment control checklist plan on forms available from Community Risk Management. An approved erosion and sediment control checklist plan, specifying those control devices and practices necessary to control erosion and signed by the permit applicant and the Chief Inspector, shall constitute the approved control plan. (b) Erosion and sediment control plan requirements. (1) An erosion and sediment control plan shall be prepared and submitted to Community Risk Management. (2) The erosion and sediment control plan shall be designed to meet the performance standards in section 105-30 and other requirements of this article. (3) The erosion and sediment control plan shall address pollution caused by soil erosion and sedimentation during construction and up to final stabilization of the site. The erosion and sediment control plan shall include, at a minimum, the following items: a. Name(s) and address(es) of the owner or developer of the site, and of any consulting firm retained by the applicant, together with the name of the applicant's principal contact at such firm. The application shall also include start and end dates for construction. b. Description of the construction site and the nature of the land disturbing construction activity, including representation of the limits of land disturbance on a United States Geological Service 7.5 minute series topographic map. c. Description of the intended sequence of major land disturbing construction activities for major portions of the construction site, including stripping and clearing; rough grading; construction of utilities, infrastructure, and buildings; and final grading and landscaping. Sequencing shall identify the expected date on which clearing will begin, the estimated duration of exposure of cleared areas, areas of clearing, installation of temporary erosion and sediment control measures, and establishment of permanent vegetation. d. Estimates of the total area of the construction site and the total area of the construction site that is expected to be disturbed by land disturbing construction activities. e. Calculations to show the compliance with the performance standard in subsection 105-30(g)(2)b.1. f. Existing data describing the surface soil as well as subsoils. g. Depth to groundwater, as indicated by Natural Resources Conservation Service soil information where available. h. Name of the immediate named receiving water from the United States Geological Service 7.5 minute series topographic maps. (4) The erosion and sediment control plan shall include a site map. The site map shall include the following items and shall be at a scale not greater than 100 feet per inch and at a contour interval not to exceed five feet: a. Existing topography, vegetative cover, natural and engineered drainage systems, roads and surface waters. Lakes, streams, wetlands, channels, ditches and other watercourses on and immediately adjacent to the site shall be shown. Any identified 100-year flood plains, flood fringes and floodways shall also be shown. b. Boundaries of the construction site. c. Drainage patterns and approximate slopes anticipated after major grading activities. d. Areas of soil disturbance. e. Location of major structural and non-structural controls identified in the erosion and sediment control plan. f. Location of areas where stabilization BMPs will be employed. g. Areas which will be vegetated following land disturbing construction activities. h. Area(s) and location(s) of wetland on the construction site, and locations where stormwater is discharged to a surface water or wetland within one-quarter mile downstream of the construction site. i. Areas(s) used for infiltration of post-construction stormwater runoff. j. An alphanumeric or equivalent grid overlying the entire construction site map. (5) Each erosion and sediment control plan shall include a description of appropriate control BMPs that will be installed and maintained at the construction site to prevent pollutants from reaching waters of the state. The erosion and sediment control plan shall clearly describe the appropriate erosion and sediment control BMPs for each major land disturbing construction activity and the timing during the period of land disturbing construction activity that the erosion and sediment control BMPs will be implemented. The description of erosion and sediment control BMPs shall include, when appropriate, the following minimum requirements: a. Description of interim and permanent stabilization practices, including a BMP implementation schedule. The erosion and sediment control plan shall ensure that existing vegetation is preserved where attainable and that disturbed portions of the site are stabilized. b. Description of structural practices to divert flow away from exposed soils, store flows or otherwise limit runoff and the discharge of pollutants from the site. Unless otherwise specifically approved in writing by Community Risk Management, structural measures shall be installed on upland soils. c. Management of overland flow at all areas of the construction site, unless otherwise controlled by outfall controls. d. Trapping of sediment in channelized flow. e. Staging land disturbing construction activities to limit exposed soil areas subject to erosion. f. Protection of downslope drainage inlets where they occur. g. Minimization of tracking at all vehicle and equipment entry and exit locations of the construction site. h. Clean up of off-site sediment deposits. i. Proper disposal of building and waste material. j. Stabilization of drainage ways. k. Installation of permanent stabilization practices as soon as possible after final grading. l. Minimization of dust to the maximum extent practicable. (6) The erosion and sediment control plan shall require that velocity dissipation devices be placed at discharge locations and along the length of any outfall channel as necessary to provide a non-erosive flow from the structure to a water course so that the natural physical and biological characteristics and functions are maintained and protected. (7) The erosion and sediment plan requirements of this subsection will meet the erosion and sediment control plan requirements of Wis. Admin Code § NR 216.46, when prepared in accordance with good engineering practices and the design criteria, standards and specifications published by the Wisconsin Department of Natural Resources under subchapter V of chapter NR 151, Wis. Adm. Code. (c) Erosion and sediment control plan amendments. The applicant shall amend the erosion and sediment control plan if any of the following occur: (1) There is a change in design, construction, operation or maintenance at the site which has the reasonable potential for the discharge of pollutants to waters of the state and which has not otherwise been addressed in the erosion and sediment control plan. (2) The actions required by the erosion and sediment control plan fail to reduce the impacts of pollutants carried by construction site runoff. (3) The Chief Inspector notifies the applicant of changes needed in the erosion and sediment control plan.

(Ord. No. 5167, § I, 2-11-2021)

Ask a question about La Crosse law

Corpus searches the La Crosse sections it holds and shows the ones that match, with their citations. Free, no sign-in.