§ 105-30 — Standards and criteria
Municipal Code of the City of La Crosse, Wisconsin (Codified through Ordinance No. 5384, enacted August 13, 2026. (Supp. No. 43)) · La Crosse Municipal Code § 105-30
Corpus is an independent public-information project, not the official City of La Crosse website. Stable reference: corpuslaw.us/code/fd28bd91-0ad7-4c54-b9b9-6e37efd56b5b
Sec. 105-30. - Standards and criteria.
(a) Effect of compliance. Compliance with the standards and criteria of this article shall not bar a nuisance action or other civil action brought by any injured public or private party for damage to property upon which the erosion directly occurred or to property or other rights which were damaged by erosion or sedimentation. (b) Standard for erosion and sediment control for land disturbing construction activities. Community Risk Management and Director of Engineering and Public Works shall not approve plans nor shall Community Risk Management issue permits required by this article for land disturbing construction activities unless said plans are in accordance with established specifications, including, but not limited to the Wisconsin Construction Site Erosion Control Field Guide. (c) Standard for tracking. For plan approval and issuance of a permit, there must be adequate provision to prevent the tracking or dropping of dirt or other materials from the site onto any public or private street. (d) Design criteria, engineering standards and general principles. All BMPs required to comply with this article shall meet the most recent design criteria, standards and specifications contained within the Wisconsin Construction Site Erosion Control Field Guide. The applicant for a permit may employ other control measures if they will accomplish the objectives of this article and are approved by Community Risk Management and Director of Engineering and Public Works. The following general principles shall be used by Community Risk Management and Director of Engineering and Public Works when evaluating erosion and sediment control plans and granting permits under this article: (1) Erosion and sediment control plans shall incorporate BMPs to reduce soil loss during construction. (2) All restoration of topsoil and/or revegetation must be completed by September 15 in order that the seeding is effective before winter. All disturbed area not seeded by September 15 of each year shall be sodded, or controlled by the use of erosion matting or other approved method. Dormant seeding may not be used on slopes greater than six percent or adjacent to streams, lakes or channels. Dormant seeding requires additional seeding in the spring. The Director of Engineering and Public Works and Community Risk Management shall have the authority to waive revegetation requirements in no set circumstances in which they determine that revegetation is not necessary to meet the purposes of this article. If it is determined that delays have occurred due to an act of God and topsoil spreading and revegetation is impossible, then the contractor/developer is required to take appropriate action to eliminate erosion while the site remains uncovered. (3) Temporary/vegetation, mulching or other cover shall be used to protect critical areas, and permanent vegetation shall be installed as soon as practical. (4) Sod shall be laid in strips at those intervals necessary to prevent erosion and at right angles to the direction of drainage. (5) Natural plant covering shall be retained and protected to the extent practicable and shall be deemed a dominant factor in developing the site. (6) Sediment basins (where required) shall be constructed and maintained to trap and remove and prevent sediment and debris from being washed outside the area of land disturbance. Basins shall be designed and constructed for a ten-year, 24-hour storm (4.3 inches) in accordance with accepted design standards, as approved by the Director of Engineering and Public Works. Sediment basins intended to serve additional functions such as runoff volume control shall be subject to additional requirements and standards elsewhere in City codes, as applicable. Maintenance shall be the responsibility of the applicant until such time that the basin is transferred to and accepted by the City or homeowners association in writing. The sediment basins shall be readily accessible, via easement or dedicated access, for ease of maintenance if dedicated to the City. (7) Each site shall have roads, access drives and parking areas of sufficient width and length to minimize sediment tracking onto public or private roadways. Any sediment reaching a public or private road shall be removed by street cleaning, not flushing, before the end of each workday. (8) All storm drain inlets shall be protected with straw bales, filter fabric, or equivalent barriers upon completion of the inlet and until the site has been stabilized. (9) Site erosion and sediment control shall be attained by the following: a. All site developments and land disturbance activities shall be planned and implemented to best fit the terrain, minimize exposed area, retain as much existing vegetation as possible. b. With the exception of those areas identified in the control plan, all disturbed ground not established to final grade within 14 days of the initial land disturbance, or left inactive for 14 days shall be stabilized by temporary or permanent seeding, sodding or equivalent control measures. Seeding should be completed within 24 hours of final grading. In areas determined to be environmentally sensitive because of steep slope, authority is granted to require immediate revegetation and erosion and sediment control measures. If temporary seeding is used, a permanent cover shall also be used as part of final site stabilization. c. Runoff from areas adjacent to the site shall be diverted around disturbed areas where possible. d. All land disturbance activities on the site shall be conducted in a logical sequence in accordance with the control plan to minimize the area of bare soil exposed at one time. e. Cuts and fills shall be planned and constructed to minimize the length and steepness of slopes. f. Channels and other concentrated flow areas shall be properly designed and constructed to control runoff within and from the site in a manner that will not erode the conveyance and receiving channel. g. Sediment shall be contained on-site through the use of filter fabric fences, straw bale fences, sediment basins, or other methods approved by acceptance of the erosion and sediment control plan by Community Risk Management. h. Earth storage piles should be located no closer than 25 feet from drainage channels or roadways and no closer than 100 feet from perennial waters or wetlands. i. Earth storage piles located closer than 25 feet to a roadway or drainage channel or located closer than 100 feet to perennial waters and wetlands shall require silt fences or other suitable means if left more than five days. Earth storage piles located on slopes of 12 percent or greater shall meet the requirements of subsection (d)(9)b. or runoff shall be contained within a silt fence or other approved measure. (10) Areas with natural existing slope at or greater than 30 percent are restricted development areas. No land disturbance activities shall occur within ten feet of these areas except for access roads or installation of utilities to building sites of less than 30 percent slope, or where slopes 30 percent or greater are less than 4,000 noncontiguous square feet in area. If encroachment into a restricted development area occurs for any of the exceptions indicated, adequate erosion and sediment control measures shall be installed as soon as practical. These areas shall be stabilized and not remain exposed without adequate erosion and sediment control measures in place. (11) To preserve restricted development areas, a ten-foot offset line shall be established from where the slope becomes 30 percent. The lot owner or developer shall have the ten-foot offset slope line staked at the site to adequately indicate the restricted areas. No land shall be disturbed or permits issued until these slope stakes are verified for accuracy by the City. Slope stakes shall remain until all disturbed areas on the lot or plat have been permanently stabilized. (e) Technical standards. All BMPs required for compliance with this article shall meet design criteria, standards and specifications based on any of the following: (1) Design guidance and technical standards identified or developed by the Wisconsin Department of Natural Resources under subchapter V of chapter NR 151, Wis. Adm. Code. (2) Soil loss prediction tools (such as the Universal Soil Loss Equation (USLE)) when using an appropriate rainfall or runoff factor (also referred to as the R factor) or an appropriate design storm and precipitation distribution, and when considering the geographic location of the site and the period of disturbance. (3) Technical standards and methods approved by Community Risk Management. (f) Performance standards for construction sites under one acre. (1) [Responsible party.] The responsible party shall comply with this section. (2) Erosion and sediment control practices. Erosion and sediment control practices at each site where land disturbing construction activity is to occur shall be used to prevent or reduce all of the following: a. The deposition of soil from being tracked onto streets by vehicles. [b. Reserved.] [c. Reserved.] d. The discharge of sediment from disturbed areas into on-site stormwater inlets. e. The discharge of sediment from disturbed areas into adjacent waters of the state. f. The discharge of sediment from drainage ways that flow off the site. g. The discharge of sediment by dewatering activities. h. The discharge of sediment eroding from soil stockpiles existing for more than seven days. i. The transport by runoff into waters of the state of chemicals, cement, and other building compounds and materials on the construction site during the construction period. However, projects that require the placement of these materials in waters of the state, such as constructing bridge footings or BMP installations, are not prohibited by this subdivision. (3) Location. The BMPs shall be located so that treatment occurs before runoff enters waters of the state. (4) Implementation. The BMPs used to comply with this section shall be implemented as follows: a. Erosion and sediment control practices shall be constructed or installed before land disturbing construction activities begin. b. Erosion and sediment control practices shall be maintained until final stabilization. c. Final stabilization activity shall commence when land disturbing construction activities cease and final grade has been reached on any portion of the site. d. Temporary stabilization activity shall commence when land disturbing construction activities have temporarily ceased and will not resume for a period exceeding 14 calendar days. e. BMPs that are no longer necessary for erosion and sediment control shall be removed by the responsible party. (g) Performance standards for construction sites of one acre or more. (1) Responsible party. The responsible party shall comply with this section and implement the erosion and sediment control plan developed in accordance with section 105-29. (2) Erosion and sediment control plan. A written site-specific erosion and sediment control plan shall be developed in accordance with section 105-29 and implemented for each construction site. This plan shall include the following: a. Erosion and sediment control practices. Erosion and sediment control practices at each site where land disturbing construction activity is to occur shall be used to prevent or reduce all of the following: 1. The deposition of soil from being tracked onto streets by vehicles. 2. The discharge of sediment from disturbed areas into on-site stormwater inlets. 3. The discharge of sediment from disturbed areas into adjacent waters of the state. 4. The discharge of sediment from drainage ways that flow off the site. 5. The discharge of sediment by dewatering activities. 6. The discharge of sediment eroding from soil stockpiles existing for more than seven days. 7. The discharge of sediment from erosive flows at outlets and in downstream channels. 8. The transport by runoff into waters of the state of chemicals, cement, and other building compounds and materials on the construction site during the construction period. However, projects that require the placement of these materials in waters of the state, such as constructing bridge footings or BMP installations, are not prohibited by this subdivision. 9. The transport by runoff into waters of the state of untreated wash water from vehicle and wheel washing. b. Sediment performance standards. In addition to the erosion and sediment control practices under subsection (g)(2)a., the following erosion and sediment control practices shall be employed: 1. BMPs that, by design, discharge no more than five tons per acre per year, or to the maximum extent practicable, of the sediment load carried in runoff from initial grading to final stabilization. 2. No person shall be required to employ more BMPs than are needed to meet a performance standard in order to comply with maximum extent practicable. Erosion and sediment control BMPs may be combined to meet the requirements of this paragraph. Credit may be given toward meeting the sediment performance standard of this paragraph for limiting the duration or area, or both, of land disturbing construction activity, or for other appropriate mechanisms. 3. Notwithstanding subsection (g)(2)b.1., if BMPs cannot be designed and implemented to meet the sediment performance standard, the erosion and sediment control plan shall include a written, site-specific explanation of why the sediment performance standard cannot be met and how the sediment load will be reduced to the maximum extent practicable. c. Preventive measures. The erosion and sediment control plan shall incorporate all of the following: 1. Maintenance of existing vegetation, especially adjacent to surface waters whenever possible. 2. Minimization of soil compaction and preservation of topsoil. 3. Minimization of land disturbing construction activity on slopes of 20 percent or more. 4. Development of spill prevention and response procedures. d. Location. The BMPs used to comply with this section shall be located so that treatment occurs before runoff enters waters of the state. Regional treatment facilities, including the City's Isle La Plume Wastewater Treatment Plant should not be used for construction site sediment removal. (3) Implementation. The BMPs used to comply with this section shall be implemented as follows: a. Erosion and sediment control practices shall be constructed or installed before land disturbing construction activities begin in accordance with the erosion and sediment control plan developed in subsection (e)(2). b. Erosion and sediment control practices shall be maintained until final stabilization. c. Final stabilization activity shall commence when land disturbing construction activities cease and final grade has been reached on any portion of the site. d. Temporary stabilization activity shall commence when land disturbing construction activities have temporarily ceased and will not resume for a period exceeding 14 calendar days. e. BMPs that are no longer necessary for erosion and sediment control shall be removed by the responsible party.
(Ord. No. 5167, § I, 2-11-2021)
Ask a question about La Crosse law
Corpus searches the La Crosse sections it holds and shows the ones that match, with their citations. Free, no sign-in.
