For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 105-55 — Applicability and jurisdiction

Municipal Code of the City of La Crosse, Wisconsin (Codified through Ordinance No. 5384, enacted August 13, 2026. (Supp. No. 43)) · La Crosse Municipal Code § 105-55

Corpus is an independent public-information project, not the official City of La Crosse website. Stable reference: corpuslaw.us/code/9209e3c8-2b75-4d9e-8791-2c86ba9490c4

Sec. 105-55. - Applicability and jurisdiction.

(a) Applicability and jurisdiction. (1) Applicability. Where not otherwise limited by law, this article applies after final stabilization to a site of land disturbing construction activity meeting any of the criteria in this paragraph, unless the site is otherwise exempt under subsections (a)(2) or (c). a. A post-construction site that had a quarter or more acres of land disturbing construction activity. b. A post-construction site that had 400 or more cubic yards of excavation, fill, or a combination of the two. c. A post-construction site that had 300 or more feet of new utility or other open trench disturbance. d. A post-construction site that added more than ten percent impervious surface to the landscape (roofs, pavement, etc.) and has a total surface imperviousness at or exceeding 40 percent of the site. e. A post-construction site that creates a new public or private road. f. All new subdivision plats. (2) A site that meets any of the criteria in this paragraph is exempt from the requirements of this article. a. A post-construction site with less than ten percent connected imperviousness based on complete development of the post-construction site, provided the cumulative area of all impervious surfaces is less than one acre. b. Nonpoint discharges from agricultural facilities and practices. c. Underground utility construction such as water, sewer and fiber optic lines; this exemption does not apply to the construction of any above ground structures associated with utility construction. (3) Notwithstanding the applicability requirements in subsection (a)(1), this article applies to post-construction sites of any size that, in the opinion of the Director of Engineering and Public Works, is likely to result in runoff that exceeds the safe capacity of the existing drainage facilities or receiving body of water, that causes undue channel erosion, that increases water pollution by scouring or the transportation of particulate matter or that endangers property or public safety. (b) Jurisdiction. This article applies to post construction sites within the boundaries and jurisdiction of the City of La Crosse, as well as the extraterritorial division of land subject to an ordinance enacted pursuant to Wis. Stats. § 236.45(2) and (3). (c) Exclusions. This article is not applicable to activities conducted by a state agency, as defined under Wis. Stats. § 227.01(1).

(Ord. No. 5167, § I, 2-11-2021)

Ask a question about La Crosse law

Corpus searches the La Crosse sections it holds and shows the ones that match, with their citations. Free, no sign-in.