Sec. 105-61. - Standards and criteria.

(a) Technical standards. The following methods shall be used in designing the water quality, peak flow shaving, and infiltration components of stormwater practices needed to meet the water quality standards of this section: (1) Technical standards identified, developed or disseminated by the Wisconsin Department of Natural Resources under Wis. Admin. Code ch. NR 151, subch. V. (2) Where technical standards have not been identified or developed by the Wisconsin Department of Natural Resources, other technical standards may be used provided that the methods have been approved by the Director of Engineering and Public Works. (b) Performance standards. (1) Responsible party. The responsible party shall implement a post-construction stormwater management plan that incorporates the requirements of this section. (2) Plan. A written stormwater management plan in accordance with subsection 150-60(k) shall be developed and implemented for each post-construction site. (3) Maintenance of effort. For redevelopment sites where the redevelopment will be replacing older development that was subject to post-construction performance standards of Wis. Admin. Code ch. NR 151 in effect on or after October 1, 2004, the responsible party shall meet the total suspended solids reduction, peak flow control, infiltration, and protective areas standards applicable to the older development or meet the redevelopment standards of this article, whichever is more stringent. (4) Requirements. The plan required under subsection (b)(2) shall include the following: a. Total suspended solids. BMPs shall be designed, installed and maintained to control total suspended solids carried in runoff from the post-construction site as follows: 1. BMPs shall be designed in accordance with Table 1. or to the maximum extent practicable as provided in subsection (b)(4)a.2. The design shall be based on an average annual rainfall, as compared to no runoff management controls. Table 1. TSS Reduction Standards Development Type | TSS Reduction New Development | 80 percent In-fill development | 80 percent Redevelopment | 40 percent of load from parking areas and roads 2. Maximum extent practicable. If the design cannot meet a total suspended solids reduction performance standard of Table 1., the stormwater management plan shall include a written, site-specific explanation of why the total suspended solids reduction performance standard cannot be met and why the total suspended solids load will be reduced only to the maximum extent practicable. 3. Off-site drainage. When designing BMPs, runoff draining to the BMP from offsite shall be taken into account in determining the treatment efficiency of the practice. Any impact on the efficiency shall be compensated for by increasing the size of the BMP accordingly. 4. Pollutant loading models such as DETPOND, WinSLAMM, P8 or equivalent methodology may be used to evaluate the efficiency of the design in reducing total suspended solids. Use the most recent version of the model and the rainfall files and other parameter files identified for Wisconsin users unless directed otherwise by the regulatory authority. b. Peak discharge. 1. By design, BMPs shall be employed to maintain or reduce the two-year, 24-hour; and the ten-year, 24-hour post-construction peak runoff discharge rates to the two-year, 24-hour; and the ten-year, 24-hour pre-development peak runoff discharge rates respectively, or to the maximum extent practicable. The runoff curve numbers in Table 2. shall be used to represent the actual pre-development conditions. Peak discharges shall be calculated using TR-55 runoff curve number methodology, Atlas 14 precipitation depths, and the appropriate NRCS Wisconsin MSE3 or MSE4 precipitation distribution. Where the pre-development condition is a combination of woodland, grassland, or cropland, the runoff curve number should be pro-rated by area. Table 2. Maximum Pre-Development Runoff Curve Numbers Runoff Curve Number | Hydrologic Soil Group A | B | C | D Woodland | 30 | 55 | 70 | 77 Grassland | 39 | 61 | 71 | 78 Cropland | 55 | 69 | 78 | 83 2. This subsection (b)(4)b. does not apply to any of the following: A. A post-construction site where the discharge is directly to the Mississippi, Black, or La Crosse Rivers (not via a municipal stormwater facility). (Commentary: Hydraulic models such as HEC-RAS or another methodology may be used to determine the change in surface water elevations. c. Safe outlet. 1. By design, the site shall provide for the safe passage of run-off from events up to and including the 100 year, 24-hour event. Safe passage implies buildings in and around the site will not be negatively impacted by run-off from the site. 2. If peak flow for any event up to the ten-year, 24 hour event causes increased discharge to a City-owned stormwater facility as compared to existing, it must be demonstrated that the City system can handle the additional flow without causing undue impact. The new stormwater shall do no harm to others. d. Infiltration. 1. Best management practices. BMPs shall be designed, installed, and maintained to infiltrate runoff in accordance with the following or to the maximum extent practicable: A. Low imperviousness. For development up to 40 percent connected imperviousness, such as parks, cemeteries, and low density residential development, infiltrate sufficient runoff volume so that the postdevelopment infiltration volume shall be at least 90 percent of the predevelopment infiltration volume, based on an average annual rainfall. However, when designing appropriate infiltration systems to meet this requirement, no more than one percent of the post-construction site is required as an effective infiltration area. B. Moderate imperviousness. For development with more than 40 percent and up to 80 percent connected imperviousness, such as medium and high density residential, multi-family development, industrial and institutional development, and office parks, infiltrate sufficient runoff volume so that the post-development infiltration volume shall be at least 75 percent of the pre-development infiltration volume, based on an average annual rainfall. However, when designing appropriate infiltration systems to meet this requirement, no more than two percent of the postconstruction site is required as an effective infiltration area. C. High imperviousness. For development with more than 80 percent connected imperviousness, such as commercial strip malls, shopping centers, and commercial downtowns, infiltrate sufficient runoff volume so that the post-development infiltration volume shall be at least 60 percent of the pre-development infiltration volume, based on an average annual rainfall. However, when designing appropriate infiltration systems to meet this requirement, no more than two percent of the post-construction site is required as an effective infiltration area. 2. Pre-development. The pre-development condition shall be the same as specified in Table 2 of the peak discharge section of this article. 3. Source areas. A. Prohibitions. Runoff from the following areas may not be infiltrated and may not qualify as contributing to meeting the requirements of this section: i. Areas associated with a tier 1 industrial facility identified in Wis. Admin. Code § NR 216.21(2)(a), including storage, loading and parking. Rooftops may be infiltrated with the concurrence of the regulatory authority. ii. Storage and loading areas of a tier 2 industrial facility identified in Wis. Admin. Code § NR 216.21(2)(b). Runoff from the employee and guest parking and rooftop areas of a tier 2 facility may be infiltrated with the concurrence of the regulatory authority; runoff from the parking area may require pretreatment. Fueling and vehicle maintenance areas. Runoff from rooftops of fueling and vehicle maintenance areas may be infiltrated with the concurrence of the regulatory authority. B. Exemptions. Runoff from the following areas may be credited toward meeting the requirement when infiltrated, but the decision to infiltrate runoff from these source areas is optional: i. Parking areas and access roads less than 5,000 square feet for commercial development. ii. Parking areas and access roads less than 5,000 square feet for industrial development not subject to the prohibitions under paragraph B.i, above. iii. Except as provided under subsection (b)(3), redevelopment post-construction site. iv. An in-fill development area less than five acres. C. Roads on commercial, industrial and institutional land uses and arterial residential roads. 4. Location of practices. A. Prohibitions. Infiltration practices may not be located in the following areas: i. Areas within 1,000 feet upgradient or within 100 feet downgradient of direct conduits to groundwater. ii. Areas within 400 feet of a community water system well as specified in Wis. Admin. Code § NR 811.16(4) or within the separation distances listed in Wis. Admin. Code § NR 812.08 for any private well or non-community well for runoff infiltrated from commercial, including multifamily residential, industrial and institutional land uses or regional devices for one- and two-family residential development. iii. Areas where contaminants of concern, as defined in Wis. Admin. Code § NR 720.03(2), are present in the soil through which infiltration will occur. B. Separation distances. i. Infiltration practices shall be located so that the characteristics of the soil and the separation distance between the bottom of the infiltration system and the elevation of seasonal high groundwater or the top of bedrock are in accordance with Table 3: Table 3. Separation Distances and Soil Characteristics Source Area | Separation Distance | Soil Characteristics Industrial, Commercial, Institutional Parking Lots and Roads | 5 feet or more | Filtering Layer Residential Arterial Roads | 5 feet or more | Filtering Layer Roofs Draining to Subsurface Infiltration Practices | 1 foot or more | Native or Engineered Soil with Particles Finer than Coarse Sand Roofs Draining to Surface Infiltration Practices | Not Applicable | Not Applicable All Other Impervious Source Areas | 3 feet or more | Filtering Layer ii. Notwithstanding subsection (b)(4)d.4.B.i, applicable requirements for injection wells classified under Wis. Admin. Code ch. NR 815 shall be followed. C. Infiltration rate exemptions. Infiltration practices located in the following areas may be credited toward meeting the requirements under the following conditions, but the decision to infiltrate under these conditions is optional: i. Where the infiltration rate of the soil measured at the proposed bottom of the infiltration system is less than 0.6 inches per hour using a scientifically credible field test method. ii. Where the least permeable soil horizon to five feet below the proposed bottom of the infiltration system using the U.S. Department of Agriculture method of soils analysis is one of the following: sandy clay loam, clay loam, silty clay loam, sandy clay, silty clay, or clay. 5. Alternate use. Where alternate uses of runoff are employed, such as for toilet flushing, laundry, or irrigation or storage on green roofs where an equivalent portion of the runoff is captured permanently by rooftop vegetation, such alternate use shall be given equal credit toward the infiltration volume required by this section. 6. Groundwater standards. A. Infiltration systems designed in accordance with this section shall, to the extent technically and economically feasible, minimize the level of pollutants infiltrating to groundwater and shall maintain compliance with the preventive action limit at a point of standards application in accordance with Wis. Admin. Code ch. NR 140. However, if site specific information indicates that compliance with a preventive action limit is not achievable, the infiltration BMP may not be installed or shall be modified to prevent infiltration to the maximum extent practicable. B. Notwithstanding subsection (b)(4)d.6.A., the discharge from BMPs shall remain below the enforcement standard at the point of standards application. 7. Pretreatment. Before infiltrating runoff, pretreatment shall be required for parking lot runoff and for runoff from new road construction in commercial, industrial and institutional areas that will enter an infiltration system. The pretreatment shall be designed to protect the infiltration system from clogging prior to scheduled maintenance and to protect groundwater quality in accordance with subsection (b)(4)d.6. Pretreatment options may include, but are not limited to, oil and grease separation, sedimentation, biofiltration, filtration, swales or filter strips. 8. Maximum Extent Practicable. Where the conditions of subsections (b)(4)d.3. and 4. limit or restrict the use of infiltration practices, the performance standard of this subsection (b)(4)d. shall be met to the maximum extent practicable. e. Protective areas. 1. Applicability. This subsection e. applies to post-construction sites located within a protective area, except those areas exempted pursuant to subsection (g)(3)e.4. 2. Measurement of protective areas. This paragraph designates the widths of protective areas. Where more than one designation may apply, the greatest width controls and the greatest protective area width shall apply where rivers, streams, lakes and wetlands are contiguous. A. For outstanding resource waters and exceptional resource waters, and for wetlands in areas of special natural resource interest as specified in Wis. Admin. Code ch. NR 103.04, 75 feet. B. For perennial and intermittent streams identified on a United States geological survey 7.5-minute series topographic map, or a county soil survey map, whichever is more current, 50 feet. C. For lakes, 50 feet. D. For wetlands, 50 feet. E. For highly susceptible wetlands, 75 feet. Highly susceptible wetlands include the following types: calcareous fens, sedge meadows, open and coniferous bogs, low prairies, coniferous swamps, lowland hardwood swamps, and ephemeral ponds. F. For less susceptible wetlands, ten percent of the average wetland width, but no less than ten feet nor more than 30 feet. Less susceptible wetlands include: degraded wetland dominated by invasive species such as reed canary grass; cultivated hydric soils; and any gravel pits, or dredged material or fill material disposal sites that take on the attributes of a wetland. G. For concentrated flow channels with drainage areas greater than 130 acres, ten feet. 3. Wetland specific criteria. In determining protective areas of wetlands under subsection (b)(4)e.2., the following control: A. In subsections (b)(4)e.2.D to F, determinations of the extent of the protective area adjacent to wetlands shall be made on the basis of the sensitivity and runoff susceptibility of the wetland in accordance with the standards and criteria in Wis. Admin. Code § NR 103.03. B. Wetland boundary delineation shall be made in accordance with Wis. Admin. Code § NR 103.08(1m). This paragraph does not apply to wetlands that have been completely filled in compliance with all applicable state and federal regulations. The protective area for wetlands that have been partially filled in compliance with all applicable state and federal regulations shall be measured from the wetland boundary delineation after a fill has been placed. Where there is a legally authorized wetland fill, the protective area standard need not be met in that location. 4. Requirements. The following requirements shall be met: A. Impervious surfaces shall be kept out of the protective area to the maximum extent practicable. The stormwater management plan shall contain a written site-specific explanation for any parts of the protective area that are disturbed during construction. B. Where land disturbing construction activity occurs within a protective area, and where no impervious surface is present, adequate sod or self-sustaining vegetative cover of 70 percent or greater shall be established and maintained. The adequate sod or self-sustaining vegetative cover shall be sufficient to provide for bank stability, maintenance of fish habitat and filtering of pollutants from upslope overland flow areas under sheet flow conditions. Non-vegetative materials, such as rock riprap, may be employed on the bank as necessary to prevent erosion, such as on steep slopes or where high velocity flows occur. Best management practices such as filter strips, swales, or wet detention basins that are designed to control pollutants from non- point sources may be located in the protective area. 5. Exemptions. This subsection (b)(4)e. does not apply to: A. Redevelopment post-construction sites. B. In-fill development areas less than five acres. C. Structures that cross or access surface waters such as boat landings, bridges and culverts. D. Structures constructed in accordance with Wis. Stats. § 59.692(1v). E. Post-construction site from which runoff does not enter the surface water, except to the extent that vegetative ground cover is necessary to maintain bank stability. f. Fueling and vehicle maintenance areas. Fueling and vehicle maintenance areas shall, to the maximum extent practicable, have BMPs designed, installed and maintained to reduce petroleum within runoff, such that the runoff that enters waters of the state contains no visible petroleum sheen. g. Swale treatment for transportation facilitates. 1. Requirement. Except as provided in subsection (b)(4)g.2., transportation facilities that use swales for runoff conveyance and pollutant removal are exempt from the requirements of local ordinance requirements for peak flow control, total suspended solids control, and infiltration, if the swales are designed to do all of the following or to the maximum extent practicable: A. Be vegetated. However, where appropriate, non- vegetative measures may be employed to prevent erosion or provide for runoff treatment, such as rock riprap stabilization or check dams. B. Swales shall comply with sections V.F. (velocity and depth) and V.G. (sale geometry criteria) with a swale treatment length as long as that specified in section V.C. (pre-treatment) of the Wisconsin Department of Natural Resources technical standard 1005 "Vegetated Infiltration Swales", dated May 2007, or a superseding document. Transportation facility swale treatment does not have to comply with other sections of technical standard 1005. 2. Exemptions. the Director of Public Works and Engineering may, consistent with water quality standards, require other that other requirements, in addition to swale treatment, be met on a transportation facility with an average daily travel of vehicles greater than 2,500 and where the initial surface water of the state that the runoff directly enters is any of the following: A. An outstanding resource water. B. An exceptional resource water. C. Waters listed in section 303(d) of the Federal Clean Water Act that are identified as impaired in whole or in part, due to nonpoint source impacts. D. Waters where targeted performance standards are developed under Wis. Admin. Code NR 151.004 to meet water quality standards. (c) General consideration for on-site and off-site stormwater management measures. The following considerations shall be observed in managing runoff: (1) Natural topography and land cover features such as natural swales, natural depressions, native soil infiltrating capacity, and natural groundwater recharge areas shall be preserved and used, to the extent possible, to meet the requirements of this section. (2) Emergency overland flow for all stormwater facilities shall be provided to prevent exceeding the safe capacity of downstream drainage facilities and prevent endangerment of downstream property or public safety. (d) Location and regional treatment option. (1) The BMPs may be located on-site or off-site as part of a regional stormwater device, practice or system, provided legal authority and/or drainage easements are in place along the entire conveyance system to off-site devices. (2) Post-construction runoff within non-navigable surface water that flows into a BMP, such as a wet detention pond, is not required to meet the performance standards of this chapter. Post-construction BMPs may be located in non-navigable surface waters. (3) Except as allowed under subsection (d)(5)b, post-construction runoff from new development shall meet the post-construction performance standards prior to entering navigable surface water. (4) Post-construction runoff from any development within a navigable surface water that flows into a BMP is not required to meet the performance standards of this section if: a. The BMP was constructed prior to the effective date of the ordinance from which this article is derived and the BMP either received a permit issued under Wis. Stats. ch. 30 or the BMP did not require a Wis. Stats. ch. 30, permit; and b. The BMP is designed to provide runoff treatment from future upland development. (5) Runoff from existing development, redevelopment and in-fill areas shall meet the post-construction performance standards in accordance with the following: a. To the maximum extent practicable, BMPs shall be located to treat runoff prior to discharge to navigable surface waters. b. Post-construction BMPs for such runoff may be located in navigable surface water if allowable under all other applicable federal, state and local regulations such as Wis. Admin. Code ch. NR 103 and Wis. Stats. ch. 30. (6) The discharge of runoff from a BMP, such as a wet detention pond, or after a series of such BMPs is subject to this section. (7) The Director of Public Works and Engineering may approve off-site management measures provided that all of the following conditions are met: a. The Director of Engineering and Public Works determines that the post-construction runoff is covered by a stormwater management system plan that is approved by the City of La Crosse and that contains management requirements consistent with the purpose and intent of this this article. b. The off-site facility meets all of the following conditions: 1. The facility is in place. 2. The facility is designed and adequately sized to provide a level of stormwater control equal to or greater than that which would be afforded by on-site practices meeting the performance standards of this this section. 3. The facility has a legally obligated entity responsible for its long-term operation and maintenance. 4. Where a regional treatment option exists such that the Director of Engineering and Public Works exempts the applicant from all or part of the minimum on-site stormwater management requirements, the applicant shall be required to pay a fee in an amount determined in negotiation with. In determining the fee for post-construction runoff, the Director of Public Works and Engineering shall consider an equitable distribution of the cost for land, engineering design, construction, and maintenance of the regional treatment option. (e) Alternative requirements. The Director of Engineering and Public Works may establish stormwater management requirements more stringent than those set forth in this section if the Director of Engineering and Public Works determines that an added level of protection is needed to protect sensitive resources.

(Ord. No. 5167, § I, 2-11-2021)