§ 46-110 — Discharge permit system
Municipal Code of the City of La Crosse, Wisconsin (Codified through Ordinance No. 5384, enacted August 13, 2026. (Supp. No. 43)) · La Crosse Municipal Code § 46-110
Corpus is an independent public-information project, not the official City of La Crosse website. Stable reference: corpuslaw.us/code/961c7ee5-8706-478a-98fe-c019fe376c77
Sec. 46-110. - Discharge permit system.
(a) Permit application. All significant industrial users shall complete a city discharge permit application if requested to do so by the Board. (1) The Superintendent or authorized agent may send a permit application and/or survey form to each significant industrial user. Existing significant industrial users not currently issued a permit may be periodically required to fill out a new permit application or survey form to allow the City to evaluate whether a permit should be required. (2) The user shall complete and return the discharge permit application or survey form within 45 days from receipt of same. A user may be required to complete a permit application after completing a survey form. The purpose of the survey form is to gather basic information so the Board can determine if more information or a permit is required. The user shall submit any of the following information, or other applicable information as requested by the Board: a. Name, address, location, and SIC number of the user. b. User's average and peak wastewater flow rates including daily, monthly, and seasonal variations, if any. c. Time(s) of day at which user's discharge occurs and duration of discharge. d. A description of the user's wastewater characteristics, and concentration of regulated pollutants discharged from each process. In addition, the pretreatment standards which may be applicable to any and all regulated processes shall be identified. Analytic procedures shall be in conformity with EPA endorsed procedures contained in 40 CFR 136 or equivalent methods approved by the EPA. e. Site plans, floor plans, mechanical and plumbing plans and details shall be provided in a schematic diagram to show all sewers and appurtenances by size, location, and elevation. f. Description of activities, facilities, and plant processes on the premises including all materials used and those materials which are, or could be, discharged to the sewer system. The description shall include, but not be limited to, raw materials, intermediate materials, catalysts, products and by-products of the plant processes. In addition, solvents, chemical cleaners, and other cleaning agents that may be introduced into the treatment system through use, spill, or mishap shall also be included. g. Each product produced or manufactured by type, amount and rate of production. h. Number of employees, number of shifts worked, beginning and ending time of each shift, and number of employees per shift. i. Other information as may be necessary to evaluate the permit application. j. All permit applications shall be signed by a person who meets the applicable signatory requirements defined in section 46-106. (3) The Board or its authorized representative shall review the completed survey form or permit application and shall require the user to obtain a City discharge permit if any one of the following conditions prevail: a. The user is, or will be, subject to Federal categorical discharge standards. 1. If said user meets requirements under NR 211.15(4)5.(d.)1—4 the control authority may classify and permit user as a Non-Significant Categorical User (NSCIU). b. The user has caused, or has the potential to cause, upsets to the wastewater treatment system by discharging one or more pollutants near or in excess of the limitations established in section 46-109. c. The user has caused, or has the potential to cause, wastewater discharges which may interfere with or pass through the wastewater treatment plant by discharging one or more pollutants near or in excess of the limitations established in section 46-109(a). d. The user has caused, or has the potential to cause, wastewater discharges which have or may adversely affect sewage sludge quality or wastewater treatment plant effluent quality. e. The user has discharged, or has the potential to discharge, wastewater containing sand, grease, or other contaminants that may adversely affect the wastewater treatment system. (4) The Board or its authorized agent, shall, within 90 days after receipt of all necessary permit application information, notify the user of one of the following: a. A City discharge permit shall be issued to the user and become effective with five days of the date of issuance. b. A City discharge permit shall be denied to the user for the reason(s) specified by the Board. c. A City discharge permit shall not be required of the user unless a change in wastewater quantity or quality occurs, or a change in the City's criteria for requiring permits occurs. (b) Permit conditions. (1) City discharge permits shall be expressly subject to all provisions of this division, enforcement response guidelines, and all other regulations and fees established by the Board. The conditions of the City discharge permits shall be uniformly enforced in accordance with this division, enforcement response guidelines, and applicable State and Federal regulations. (2) Permits may include all or some of the following: a. The average and maximum wastewater pollutant mass and/or concentration and wastestream flow rate. b. Limits on rate and time of discharge or requirements for flow regulation and equalization. c. Requirements for providing sampling facilities suitable for inspection, flow measurement, and sampling of the process wastewater discharge. d. Specifications for monitoring programs. e. Requirements for maintaining and submitting technical reports and plant records relating to wastewater discharge. f. Daily average and daily maximum discharge rates, or other appropriate conditions when pollutants subject to limitations and prohibitions are proposed or present in the user's wastewater discharge. g. Compliance schedules. h. Requirements for the prompt reporting of changed or new discharges. i. Other conditions to ensure compliance with this division. j. Where pretreatment and/or implementation of additional operation and maintenance activities will be required to comply with the permit conditions, the user shall provide a declaration of the shortest schedule by which the user will provide such pretreatment and/or implementation of additional operation and maintenance activities. Such schedule shall be subject to approval by the Board. 1. The schedule shall contain the milestone dates for the commencement and completion of major events leading to the construction and operation of pretreatment facilities required for the user to comply with its permit. 2. Under no circumstances shall the Board permit a time increment between major steps greater than nine months. 3. Not later than 14 days following each milestone date in the schedule and the final date for compliance, the user shall submit a progress report to the Board, including a statement as to whether or not it completed the increment of progress represented by that milestone date, and if not, the date on which it expects to complete this increment of progress, the reason for the delay and the steps being taken by the user to return the construction to the approved schedule. In no case shall more than nine months elapse between such progress reports to the Board. 4. All schedules and progress reports submitted to the Board shall be signed by a person who meets the applicable signatory requirements professional conditions as defined in section 46-106. (c) Permit duration. (1) Permits shall be issued for a specified period of time not to exceed five years. A permit may be issued for a period of less than five years, or stated to expire on any specified date. The terms and conditions of the permit shall be subject to change during the term of the permit, at the sole discretion of the City. The user shall be informed of any proposed changes in its permit at least 30 days prior to the effective date of the change. Any changes or new conditions shall include a time schedule for compliance. (2) The user shall not discharge after the date of permit expiration unless the user has submitted an application for permit reissuance at least 90 days before the permit's expiration date. If the user has done so, it may continue to operate in accordance with the terms and conditions contained in the expired permit until the city reissues the permit. The permit may be re-issued by the Board prior to the expiration date whenever feasible. The re-issued permit may contain new or modified conditions, and will be subject to a new permit fee upon each renewal. (d) Permit modification. An industrial user issued a City discharge permit shall apply for permit modifications if any of the following conditions prevail: (1) Enactment of additional standards applicable to said user. (2) An increase in wastewater discharge volume of (plus or minus) 20 percent or more or a change in wastewater character. The user shall, within 45 days after notification by the Board, provide information and data in a form as prescribed by the Board, and within 45 days of billing pay any additional fees, if applicable. (e) Permit transfer. City discharge permits are issued to a specific user for specific processes or operation. A City discharge permit shall not be reassigned, transferred or sold to a new owner, new user, different premises, or a new or changed operation or process without the approval of the Board. (f) Permit revocation. Any user who violates the conditions of its permit or of this division, or of applicable State and Federal regulations, is subject to permit revocation. The Board may also seek to revoke the permit of any user which fails to factually report the constituents or characteristics of its discharge; report significant changes in constituents, characteristics, or volume; refuses reasonable access to premises or property; or misrepresents its wastewater samples as representative of daily discharge. (g) Permit fees. (1) Permit fees shall be established by the Board to provide revenues for the cost of operating and administering the POTW Pretreatment Program, including the cost of equipment, supplies, labor, supervision, and other incidental expenses. (2) The permit fees do not provide for the recovery of operation, maintenance, repair, or replacement costs of the wastewater collection and treatment system. Permit fees shall periodically be evaluated and amended as necessary to reflect current costs of program operation. Fee adjustments will be made not more than once a year, except for a user whose discharge rate or characteristics change significantly. In addition to permit fees, each user holding a permit will be required to pay for the analysis of samples collected by the City for compliance monitoring. Permittees are also responsible for any costs incurred to comply with provisions of their permit, including self-monitoring expenses. a. The base permit fee shall be determined by a schedule established by the Board based on the flow, the number of contaminants or parameters of concern, and the mass of contaminants discharged relative to tabulated amounts. b. Permit fees will be subject to a 50 percent surcharge for users located outside the City of La Crosse corporate boundaries except the La Crosse County Landfill which surcharge shall be 25 percent. c. Permits may include provisions for additional charges for discharge of treatable contaminants or flow above a specified level. Such surcharges shall reflect the City's estimated costs of handling and treating such wastes. d. Trucked wastewater from a permitted user located outside the City of La Crosse corporate limits shall be subject to a 25 percent surcharge on the normal fees for disposing of trucked wastewater. e. Permit fees, disposal fees for trucked wastewater, and fees for excess discharge of treatable wastes shall be paid within 45 days of the billing date.
(Code 1980, § 6.11(D); Ord. No. 5103, §§ II, III, 8-8-2019; Ord. No. 5126, §§ III, IV, 1-9-2020)
Ask a question about La Crosse law
Corpus searches the La Crosse sections it holds and shows the ones that match, with their citations. Free, no sign-in.
