§ 30.01 — ADMINISTRATION
Madison General Ordinances (Rev. 28, Update 3: codified through ORD-26-00040, published August 3, 2026) · Madison General Ordinances § 30.01
Corpus is an independent public-information project, not the official City of Madison website. Stable reference: corpuslaw.us/code/b4bda711-6cbf-4761-af42-9a95d52906fe
30.01 - ADMINISTRATION.
(1) Purpose and Scope of This Code. (a) The purpose of this code is to provide minimum regulations, provisions, and requirements in the City of Madison to insure safety and adequacy to persons and property wherever heating, ventilating, and/or air conditioning is installed and to all alterations or improvements, including replacement of any apparatus or device pertaining to heating, ventilating, and/or air conditioning (b) The provisions of this code shall apply to every building, or portion of a building, devoted to a new use for which the requirements are in any way more stringent than the requirements covering the previous use. The provisions of this code shall be binding alike upon the owner of a building or premises, every person in charge of or responsible for or who causes the construction, repair alteration or improvement of any heating, ventilating and/or air conditioning devices, fixtures or equipment. (Am. by Ord. 11,783, 2-17-97) (c) Wis. Admin. Code ch. SPS 323 and all subsequent amendments, additions and recodifications thereto are hereby adopted, by reference, and shall apply to all new one- and two-family residential buildings as well as additions and alterations to all existing one- and two-family residential buildings, accessory buildings, and to new portions of moved buildings. If there are sections of this code that are more restrictive than Wis. Admin. Code ch. SPS 323, then Wis. Admin. Code ch. SPS 323 shall apply. If there are subjects covered in this code that are not covered in Wis. Admin. Code ch. SPS 323, then this code shall apply. (Am. by Ord. 9298, 10-29-87) (d) Wis. Admin. Code ch. SPS 364 and all subsequent amendments, additions and recodifications thereto are hereby adopted by reference for all buildings and structures other than one (1) and two (2) family residential dwellings. (Am. by Ord. 9298, 10-29-87) (e) Sections in this code that are more restrictive or not covered in Wis. Admin. Code ch. SPS 364 shall be enforced over Wis. Admin. Code ch. SPS 364. (Am. by Ord. 9298, 10-29-87) (2) Heating, Ventilating and Air Conditioning Inspector. (a) To enforce the provisions of this code there is hereby authorized and established the position of Heating, Ventilating and Air Conditioning Inspectors who shall be under the direction of the Director of the Building Inspection Division, and be responsible for the inspection of heating, ventilation, and smoke abatement problems as prescribed by this code. (Am. by Ord. 8081, 7-29-83; ORD-08-00109, 10-7-08; Am. by ORD-21-00016, 3-8-21) (b) The Heating, Ventilating and Air Conditioning Inspectors shall have the power and authority at all reasonable times, for any proper purpose to enter upon any public or private premises and make inspections thereof, and to require the productions of the permit for any building, electrical, plumbing, heating or ventilation or to require license therefore. Any person interfering with or refusing entrance to said Inspectors while in the performance of their prescribed duties shall be punished as provided in Section 30.01(9). (Am. by ORD-10-00058, 6-11-10; ORD-14-00012, 1-14-14; Am. by ORD-21-00016, 3-8-21) (3) HVAC Certification Required. A permit application submitted by the applicant will not be approved unless such individual holds a valid certification under Wis. Stat. § 101.178(3)(a), except that an application may be approved for HVAC work to be done by the owner in a single-family residence which they themselves occupy. (4) Application for Permit to Install HVAC. (a) Permit Applications and Permit Card. 1. The application for a permit shall be made on forms provided by the Building Inspection Division of the Department of Planning and Community and Economic Development. The applicant shall be a qualified installer. 2. The Heating, Ventilating and Air Conditioning Permit Card shall be posted in a conspicuous place near the heating plant before starting work and shall not be removed until the final heating inspection has been made and the installation does conform with the requirements of this code. The permit card for electric space heating shall be posted near the electric service panel before work is started and shall not be removed until the final heating inspection has been made and the installation does conform with the requirements of the code. (b) Data Required as Part of the Permit Application. All drawings submitted for approval shall be accompanied by sufficient data and information for the Building Inspection Division of the Department of Planning and Community and Economic Development to determine if the capacity of the equipment and the performance of the equipment will satisfy the requirements of the ordinance. The following data shall be submitted: 1. Submit heat loss calculation in BTU per hour for each room to be heated. 2. Include calculations for ventilation requirements. 3. Submit one (1) or more copies of complete drawings. When the heating and ventilating drawings require approval of the Department of Safety and Professional Services, one (1) or more approved copies shall be submitted with the application. 4. Summation of heating and ventilating load requirements. 5. Installations shall be made to conform to approved drawings. 6. Plot plan showing the location of the condensing unit for air conditioning. 7. For solar systems, furnish an estimate of the amount of energy in BTU's to be delivered by the system on an annual basis, which estimate shall be based on an "F" chart analysis or another method appropriate to the system considered, and collector performance data as is determined by a recognized testing lab. 8. For solar systems, furnish the collector tilt and azimuth angle and a solar path shading diagram for the proposed collector location indicating the shading between the hours of 9:00 a.m. and 3:00 p.m. CST for the entire year. 9. For solar systems, furnish a detailed drawing showing anchorage and bearing of collector supports. (c) Design Standards. The heating and ventilating design shall conform to methods and standards approved by the Building Inspection Division of the Department of Planning and Community and Economic Development when not in conflict with the Department of Safety and Professional Services. Note: The Building Inspection Division of the Department of Planning and Community and Economic Development will accept the method and standards recommended by American Society of Heating, Refrigeration, and Air Conditioning Engineers; National Warm Air Heating and Air Conditioning Association; Sheet Metal and Air Conditioning Association (SMACNA); and National Electrical Manufacturers' Association. (See Appendix No. 1 for acceptable standards.) 1. Minimum design standards for all rooms in living quarters shall be seventy (70) degrees Fahrenheit except bathrooms, which shall be seventy-five (75) degrees Fahrenheit. The minimum outside design temperature shall be minus fifteen (-15) degrees Fahrenheit. 2. The total heat loss of a building including the basement shall be used in sizing heating units or electrical service for electrical space heating. 3. The proper "U" factors shall be selected and shall reflect the additional heat loss in areas located over unheated areas. (d) Supplemental Permits. The license holder responsible for the work shall complete any supplemental permit mailed to them and return it to the Director of the Building Inspection Division prior to commencing work. Failure to return the supplemental permit prior to commencing work shall be deemed to be working without a permit. (e) HVAC permits shall lapse and be void unless the work authorized thereby is commenced within six (6) months from, and completed within twenty-four (24) months of the date issued. HVAC permits shall be eligible for an extension of a period of twelve (12) months from the date of expiration. HVAC permits shall be eligible for a maximum of two (2) extensions. The fees for such extension shall be one-half of the original permit inspection fee. Upon lapse of a permit a new permit must be obtained pursuant to all the requirements of the code then in force. (5) HVAC Permit Fee Schedule. (a) Fee Schedule. 1. Penalty for failure to obtain a permit before starting work shall be double the fees. This shall be in addition to any other penalties provided elsewhere in this Ordinance; in addition, a penalty of one hundred dollars ($100) shall be assessed for each day that any work requiring a permit progresses without a permit, calculated from the date the stop work notification is delivered to either the property owner or the contractor performing the work, until the date a permit is obtained. 2. When an application is submitted for a property where only the shell of the property is to be completed, the fee will be calculated at 50% of the total fee for that particular fee group. When an application is submitted for construction of the interior of a building where the shell of the building has been previously granted a permit, the fees shall be based on the square footage of that space as a percentage of the entire square footage of the subject building and that fee shall be calculated at fifty percent (50%) of the total fee for that particular fee group. Project Type | Fees (Round up all fees to the next highest dollar) Group I - New Residential | $.09 per sq. ft. Minimum Fee $25 | The use group shall include new construction and any additions to all single- or two-family residential buildings and to all commercial building space classified as R-2, R-3, or R4. Group II - New Commercial Non Residential | $.11 per sq. ft. Minimum Fee $25 | The use group shall include new construction and any additions to all commercial building space classified as A-1, A-2, A-3, A-4, A-5, B, E, H-1, H-2, H-3, H-4, H-5, I-1, I-2, I-3, I-4, M, or R-1. Group III - New Industrial | $.06 per sq. ft. Minimum Fee $25 | The use group shall include new construction and any additions to all commercial building space classified as F1, F2, S-1, S-2, or U and other buildings not classified in Groups I, II and IV. Group IV | Alterations and Special Fees Alterations and repairs to existing structures | $11 for each $1,000 value or fraction thereof Minimum Fee $25 Replacement Heating Equipment | Equipment BTU Output Fee Up to 100,000 BTU $25 100,001 to 165,000 BTU $50 165,001 and greater BTU $75 | This fee applies to each replacement heating unit and does not include work performed on the distribution system beyond the plenums or beyond the immediate connections to the heating equipment. Work completed beyond the plenums or beyond the immediate connections to the heating equipment shall be billed according to cost of work. Fees for Roof Top Unit (RTU) replacements shall be billed based on the unit BTU output. Air Conditioning Unit | $25 | The fee applies to any new or replacement air conditioning unit. This fee does not apply to temporary window units. Ductless Split System or Wall Pack Unit | $25 (6) All HVAC Work to be Inspected. (a) It shall be unlawful for a person, firm, or corporation to construct, install, alter, or repair any heating, ventilating or exhaust system (and appurtenance), replace boiler and furnace, install stoker and conversion units in or for any building before securing a permit, except in cases of emergency the contractor may proceed with the work and file the application for a permit within twenty-four (24) hours (Sundays and City holidays excepted). A heating permit will not be required for the installation of electric baseboard or bathroom heaters when installed as auxiliary heat; that is, to supplement the existing heating system designed and installed to satisfy the load requirements of the space to be heated. The reference to appurtenances shall include direct heaters, cooling coils, central residential air conditioning (cooling) and similar devices affecting the safety or operation of the heating system. (b) In any new building or addition, immediately upon completion of those portions of the installation which are thereafter to be concealed or covered, the heating contractor shall notify a Heating, Ventilating and Air Conditioning Inspector on forms furnished by the Building Inspection Division of the Department of Planning and Community and Economic Development that said portions of the installations are ready for inspection; and it shall be unlawful for any person, firm or corporation to lath over, plaster or cover up any heating work before such work has been inspected and a rough inspection card posted. The Heating, Ventilating and Air Conditioning Inspectors shall have the right and authority to order the removal of all such lath, plaster, or other covering which may have been placed over such work as has not been inspected. The Heating, Ventilating and Air Conditioning Inspectors shall make inspections within two (2) working days after notice. Final inspection on new installations is to be made upon completion of such work. Inspection of repairs, replacement or conversion work is to be made upon completion of such work. The heating contractor shall notify a Heating, Ventilating and Air Conditioning Inspector as soon as the installation is complete and ready for inspection. A heating contractor who calls for an inspection and the work is not completed may be assessed twenty-five dollars ($25) per inspection. Pursuant to Section 29.11, MGOs, it is unlawful to occupy a building or permit a building to be occupied until final inspections have been made and a Certificate of Occupancy has been issued. (c) Failure or neglect to comply with the provisions of the Heating, Ventilating and Air Conditioning Code and of the permit issued under this code shall be considered a violation of this code. (d) The Department of Planning and Community and Economic Development shall keep an accurate account of all unpaid inspection fees incurred for inspection services rendered. (7) Signs on Vehicles. Every heating and air conditioning contractor vehicle in use for the sale or service of heating and air conditioning equipment in the City of Madison shall display a sign of two hundred twenty-five (225) square inches. The company name letters shall be at least two (2) inches high. Failure to comply will subject the company to penalties in Section 30.01(9) MGO. (8) Compliance Inspection Fees. (Am. by ORD-21-00016, 3-8-21) (a) Any person who shall fail or neglect to comply with any lawful order of the Director of the Building Inspection Division issued pursuant to the provisions of this chapter may be assessed seventy-five dollars ($75) per compliance inspection, as defined in Sec. 27.03(2), MGO, that does not result in compliance with the order. A thirty-five dollar ($35) charge may be assessed when an inspector fails to gain entry to carry out a compliance inspection. (Am. by ORD-11-00057, 4-7-11) (b) The Department of Planning and Community and Economic Development shall keep an accurate account of all unpaid inspection fees incurred for compliance inspection services rendered and report the same to the Finance Director, who shall annually prepare a statement of these special charges at each lot or parcel of land and report the same to the City Clerk, and the amount therein charged to each lot or parcel of land shall be by said Clerk entered in the tax roll as a special charge against said lot or parcel of land, and the same shall be collected in all respects like other special charges upon real estate as provided in Wis. Stat. § 66.0627. (Am. by ORD-11-00037, 3-8-11) (9) Penalty. Any person who shall violate any of the provisions of this chapter or who shall neglect or refuse to comply with a lawful order of the Director of the Building Inspection Division or their designee, issued pursuant to the provisions of this chapter, shall be fined not less than ten dollars ($10) nor more than one hundred dollars ($100) for each and every violation thereof. Each day of violation shall constitute a separate offense. These penalties are pursuant to Wis. Stat. § 101.02(13), for building code violations. Madison General Ordinances violations bear the following penalties for violations in a twelve-month period: First offense, fifty dollars ($50) to three hundred dollars ($300); second offense, three hundred dollars ($300) to six hundred dollars ($600); third offense, six hundred dollars ($600) to one thousand dollars ($1,000). The offenses covered under this section are: Performing HVAC work without a license; performing HVAC work without a permit; failure to call for a HVAC inspection and failure to have a proper sign on vehicle. (Sec. 30.01 (14) Renum. to (13) by Ord. 11,783, 2-17-97; Ord. 13,760, 12-14-04; ORD-08-00109, 10-7-08; Renum. to (14) by ORD-10-00058, 6-11-10; Am. by ORD-21-00016, 3-8-21)
(Am. by ORD-12-00035, 3-28-12) (Am. by ORD-21-00016, 3-8-21) (Cr. by ORD-10-00058, 6-11-10)
Ask a question about Madison law
Corpus searches the Madison sections it holds and shows the ones that match, with their citations. Free, no sign-in.
