Sec. 98-114. - Approval of sewer plans; construction of projects.
(a) Applicability. This section applies to the submission and approval of plans and specifications of all sewers (except internal private plumbing) and appurtenances within the service area of the utility, including but not limited to: (1) Sanitary sewer extensions to serve land that is not served by sanitary sewers; (2) All sanitary sewer mains, interceptors, lift stations, including any enlargements and any components thereof; (3) Equalization or storage facilities; and (4) Projects to repair or replace any of the foregoing, or to rehabilitate any such facilities for purposes of reducing infiltration or inflow. (b) Construction of projects; approval required. No person shall commence, or cause to be commenced, construction of any project referred to in subsection (a), above, within the service area of the utility until the project and the plans and specifications for such sewer or other facility shall have been approved by the general manager pursuant to this section. Nothing in this subsection relieves a person from obtaining any other applicable local, state, or federal permits or approvals. (c) System plan required. The construction of all projects that will store or convey wastewater that will eventually be introduced into the interceptors of the utility or will be received at the treatment plant, shall be consistent with a system plan filed with and approved by the utility. Each outlying community which conveys wastewater into the interceptors of the utility, or directly or indirectly to the utility's treatment plant shall prepare and file a system plan with the utility. The system plan shall identify all facilities in the outlying community's sewer system in a detail and manner consistent with current good professional standards. Each application for approval of a project under this section shall be accompanied by a proposed amendment to the outlying community's system plan. (d) Submission of plans and specifications. All applications for approval under this section shall be accompanied by a written request for approval, signed by the appropriate representative of the outlying community in which the proposed project is to be located, and a set of plans and specifications prepared in accordance with current good professional practice and that are sufficiently detailed to enable the general manager to reasonably determine the anticipated flow and characteristics of wastewater that may be transmitted through the proposed facilities. All plans and specifications shall be submitted with six copies of the proposed project, and three copies of the proposed amendment to the system plan, and two copies of the design computations; provided, however, that design computations will not be required for eight-inch diameter sanitary sewers that are designed to carry a peak flow equal to or less than seven-tenths cubic feet per second. Where a project will convey wastewater from more than one outlying community, the outlying community submitting the project for approval shall include evidence of the review and approval of any other outlying communities whose wastewater will be conveyed by the project. (e) Approval of system plans and construction plans tributary to the sewerage system of the wastewater utility of the city. (1) The general manager is authorized to approve system plans and amendments to system plans, and construction plans (hereafter collectively "plans"), for areas tributary to the utility's sewerage system or treatment plant provided that: a. The plans are consistent with the utility's ordinances, and statements of policy and purposes; b. The plans are consistent with the agreement, the utility's facilities plans, amendments thereto, and any base flow and peak flow allocations utilized therein; c. As to system plans or construction plans from areas outside the boundaries of the city, to the extent the plans would permit base or peak flows in excess of any allocations utilized in facilities plans or the agreement, the outlying community has reached a written agreement with the utility purchasing such additional capacity or otherwise reaching agreement on the capital costs associated with such exceedances of base or peak flows; d. As to system plans or construction plans from areas outside the boundaries of the city, the outlying community to which such plans relate is in full compliance with section 98-113; e. As to system plans or construction plans from areas outside the boundaries of the city, the outlying community to which such plans relate has paid all sewerage service charges invoiced by the utility in full in a timely manner; f. As to construction plans for areas outside the boundaries of the city, the construction plans must be consistent with previously approved system plans or amendments thereto; g. The plans are within the sewer service area approved by the utility or in the agreement; and h. The general manager reasonably finds that the plans should not be denied for one or more of the reasons set forth in the following subsection (2). (2) In the event the general manager believes a proposed system plan, amendment to system plan, or construction plan is inconsistent with the sound management of the wastewater utility, or may damage the system, injure employees, surcharge any part or all of the sewerage system or plant, interfere with the wastewater treatment process at the plant, prevent or impair compliance with the utility's WPDES permit, contribute materially to bypassing in the tributary system or the interceptors or collection system in the utility's sewerage system, prevent or impair compliance with pretreatment regulations, fail to meet any of the criteria in the preceding subsection (1), or otherwise be inconsistent with the policies and purposes of the utility as described in section 98-3, then the general manager may deny approval of the plans. In exercising judgment under this section, the general manager may rely on the assessments of utility staff, and may make reasonable assumptions about the projected usage of the proposed project(s) based on current good professional practice. (3) In the event the general manager intends to deny approval of plans, the general manager will allow, within a stated reasonable period, the proponents of the specific plan to submit such material as may address the concerns of the general manager. The general manager shall review such material and make a determination as to whether the plan should be approved or rejected. This determination must be made within 20 days after receipt of the material requested by the general manager after initial review. The general manager then may approve the plan if the criteria in these ordinances are satisfactorily addressed. If the general manager believes the denial of the plan should be sustained, the matter shall be submitted, along with the general manager's recommendation, to the wastewater commission for its final determination. In exercising its discretion to approve or deny the plan, the commission shall apply the criteria from this chapter of the agreement that apply to the general manager's initial determination and recommendation.
(Ord. No. 7-02, pt. 1, 4-15-02)