Sec. 98-116. - Metering facilities for outlying communities.

(a) General requirement. The actual flow and strength characteristics (BOD, SS, P or other parameters established by the utility from time to time) of sewage from each outlying community that has a portion of its area within the utility's sewer service area shall be measured at metering and sampling stations at the point of entry into the interceptor sewers or treatment plant of the utility. Such metering and sampling stations shall be installed and maintained by the outlying community in such a way as to accurately measure the total flow and strength characteristics of wastewater collected within the outlying community and entering into the interceptor sewers or treatment plant of the utility. Meters in such stations shall be calibrated at least every six months in order to maintain their accuracy. The calibration shall be performed using techniques recommended by the manufacturer of the meter. The outlying community shall be responsible for establishing and initiating the service and calibration schedule. The data from these metering and sampling stations shall be utilized by the utility for purposes of determining those portions of sewerage service charges that are dependent upon the flow and strength levels of the wastewater discharged into the utility's system. (b) Right of inspection and sampling. The utility shall be granted access from time to time in order to verify the accurate operation of the metering and sampling station through inspection and the taking of grab samples. The outlying community shall also permit the utility immediate access in cases where the utility has reason to believe that potentially toxic or hazardous substances are in the wastewater emanating from the outlying community in amounts that jeopardize the compliance of the utility with its WPDES permit, or which would introduce a new toxic or hazardous substance into the influent of the utility's treatment plant that is not presently specifically and expressly limited in the utility's WPDES permit. (c) No person shall connect or allow to be connected a private interceptor main sewer to a public sewer in the sewer service area without the prior written approval of the wastewater commission. (d) No person shall construct or operate a private interceptor main sewer or allow to be constructed or operated a private interceptor main sewer within the sewer service area without the prior written approval of the wastewater commission.

(Ord. No. 7-02, pt. 1, 4-15-02)