§ 98-151 — General sewer use requirements
Municipal Code of the City of Racine, Wisconsin (Codified through Ordinance No. 0082-26, adopted March 3, 2026. (Supp. No. 108)) · Racine Municipal Code § 98-151
Corpus is an independent public-information project, not the official City of Racine website. Stable reference: corpuslaw.us/code/f93c8cec-1cd0-4b15-830b-e0bd47814970
Sec. 98-151. - General sewer use requirements.
(a) General discharge prohibitions. No user shall contribute or cause to be contributed, directly or indirectly, any pollutant or wastewater which causes pass-through or will interfere with the operations or performance of the POTW. These general prohibitions apply to all such users of the POTW whether or not the user is subject to national categorical pretreatment standards or any other national, state, or local pretreatment standards or requirements. (b) Specific discharge prohibitions. A user may not contribute the following pollutants or substances to the POTW: (1) Any liquids, solids, or gases which by reason of their nature or quantity are, or may be, sufficient either alone or by interaction with other substances to cause fire or explosion or be injurious in any other way to the POTW or to the operation of the POTW. At no time shall two successive readings on an explosion hazard meter, at the point of discharge into the system (or at any point in the system), be more than 15 percent nor any single reading over 30 percent of the lower explosive limit (LEL) of the meter for that specific chemical. In addition, pollutants which create a fire or explosive hazard in the POTW, including, but not limited to, wastestreams with a closed cup flash point of less than 140 degrees Fahrenheit (60 degrees Celsius) using the test methods specified in 40 CFR 261.21. Prohibited materials include, but are not limited to, gasoline, kerosene, naphtha, benzene, toluene, xylene, ethers, alcohols, ketones, aldehydes, peroxides, chlorates, perchlorates, bromates, carbides, hydrides, and sulfides and any other substances which the utility, the state, or EPA has notified the user is a fire hazard or a hazard to the system; (2) Solid or viscous substances which may cause obstruction to the flow in a sewer, but in no case solids greater than one inch in any dimension or create interference with the operation of the wastewater treatment facilities or wastewater collection system such as, but not limited to: articles with sufficient dimensions or quantity either alone or in combination with other particles to obstruct the wastewater flow, bones, hair, whole blood, ashes, cinders, sand, spent lime, stone or marble dust, metal, glass, straw, shavings, grass clippings, disposable diapers, paper hand towels, wipes, rags, cloth towels, clothing articles, waste paper, wood, plastics, gas, tar, asphalt residues, residues from refining or processing of fuel or lubricating oil, construction materials, mud, or glass grinding residues, or polishing waste residues; (3) Any wastewater entering the municipal sanitary sewer system having a pH less than 5.0, or wastewater having any other corrosive property capable of causing damage or hazard to structures, equipment, and/or personnel of the POTW; (4) Any wastewater entering the municipal sanitary sewer system having a pH in excess of 10.0; (5) Pollutants, including oxygen-demanding pollutants (BOD, etc.), released in a discharge at a flow rate and/or pollutant concentration which, either singly or by interaction with other pollutants will cause interference with the POTW and/or which would constitute a slug; (6) Petroleum oil, nonbiodegradeable cutting oil, or products of mineral oil origin, in amounts that will cause interference or pass-through; (7) Trucked or hauled pollutants, except at the wastewater treatment plant discharge point, under permit as listed in subsection 98-151(n); (8) Any wastewater containing toxic pollutants in sufficient quantity, either singly or by interaction with other pollutants, to injure or interfere with any wastewater treatment process, constitute a hazard to humans or animals, create a toxic effect in the receiving waters of the POTW, or to exceed the limitation set forth in categorical pretreatment standard. A toxic pollutant shall include, but not be limited to, any pollutant identified pursuant to Section 307(a) of the Act; (9) Any noxious or malodorous liquids, gases, or solids, which either singly or by interaction with other wastes are sufficient to create a public nuisance or hazard to life or are sufficient to prevent entry into the sewers for maintenance and repair; (10) Any substance which may cause the POTW's effluent or any other product of the POTW such as residues, sludges, or scums, to be unsuitable for reclamation and reuse or to interfere with the reclamation process. In no case shall a substance discharged to the POTW cause the POTW to be in noncompliance with sludge use or disposal criteria, guidelines or regulations developed under section 405 of the Act; any criteria, guidelines, or regulations affecting sludge use or disposal developed pursuant to the Solid Waste Disposal Act, the Clean Air Act, the Toxic Substances Control Act, or state or local criteria applicable to the sludge management method being used; (11) Any substance which will cause the POTW to violate its WPDES permit or the receiving water quality standards; wastewater causing, alone or in conjunction with other sources, the treatment plant's effluent to fail a whole effluent toxicity test; (12) Any wastewater with objectionable color not removed in the treatment process, such as, but not limited to, ink residues, paint residues, dye wastes and vegetable tanning solutions; (13) Any wastewater having a temperature which will inhibit biological activity in the POTW treatment plant resulting in interference, but in no case wastewater with a temperature which is lower than 32 degrees Fahrenheit (0 degrees Celsius) at discharge point from the source to the sanitary sewer system. The temperature shall not exceed 104 degrees Fahrenheit (40 degrees Celsius) at the POTW wastewater treatment plant; (14) Any unpolluted water including, but not limited to, cooling water, stormwater, or groundwater; (15) Wastewater containing inert suspended solids (such as, but not limited to, fuller's earth, lime slurries, and lime residues) or dissolved solids (such as, but not limited to, sodium chloride and sodium sulfate) in such quantities that they would cause interference with the wastewater disposal system; (16) Any wastewater containing any radioactive wastes or isotopes of such half-life or concentration as may exceed limits established in compliance with applicable state or federal regulations; (17) Any wastewater which causes a hazard to human life or creates a public nuisance; (18) Sludges, screenings or other residues from the pretreatment of industrial wastes; (19) Medical wastes, except as specifically authorized by the general manager in a wastewater discharge permit; and (20) Detergents, surface-active agents, or other substances which may cause excessive foaming in the POTW. Pollutants, substances or wastewater prohibited by this section shall not be processed or stored in such a manner that they could be discharged to the POTW. When the general manager determines that a user is contributing to the POTW, any of the substances enumerated above in such amounts as to interfere with the operation of the POTW, the general manager shall: (1) Notify user. (2) Develop effluent limits, if possible, for such user(s) to correct the interference with the POTW. (3) Take immediate action if necessary to eliminate interference. (c) National categorical pretreatment standards. Upon the promulgation of the categorical pretreatment standards for a particular industrial subcategory, the categorical pretreatment standards, if more stringent than limitations imposed under this division for sources in that subcategory, shall immediately supersede the limitations imposed under this division. The general manager shall notify all affected users of the applicable reporting requirements under 40 CFR, part 403.12. Compliance by existing sources with categorical pretreatment standards shall be within three years of the date the standard is effective unless a shorter compliance time is specified. Existing sources which become industrial users subsequent to promulgation of an applicable categorical pretreatment standard shall be considered existing industrial users except where such sources meet the definition of a new source as defined in 40 CFR, part 403.3(k). New sources shall install, have in operating condition, and start-up all pollution control equipment required to meet the applicable pretreatment standards before beginning discharge. Within the shortest feasible time, not to exceed 90 days, new sources shall be required to meet all applicable pretreatment standards. The categorical pretreatment standards found in 40 CFR, chapter I, subchapter N, parts 405 through 471 are hereby incorporated: (1) Where a categorical pretreatment standard is expressed only in terms of either the mass or the concentration of a pollutant in wastewater, the general manager may impose equivalent concentration or mass limits in accordance with 40 CFR 403.6(c); (2) When the limits in a categorical pretreatment standard are expressed only in terms of mass of pollutant per unit of production, the general manager may convert the limits to equivalent limitations expressed either as mass of pollutant discharge per day or effluent concentration for purposes of calculating effluent limitations applicable to individual industrial users. (3) When the limits in a categorical pretreatment standard are expressed only in terms of mass of pollutant per unit of production, the general manager may convert the limits to equivalent limitations expressed either as mass of pollutant discharge per day or effluent concentration for purposes of calculating effluent limitations applicable to individual industrial users. (4) When wastewater subject to a categorical pretreatment standard is mixed with wastewater not regulated by the same standard, the general manager shall impose an alternate limit using the combined wastestream formula in 40 CFR 403.6(e); (5) A user may obtain a variance from a categorical pretreatment standard if the user can prove, pursuant to the procedural and substantive provisions in 40 CFR 403.13, that factors relating to its discharge are fundamentally different from the factors considered by EPA when developing the categorical pretreatment standard; and (6) A user may obtain a net gross adjustment to a categorical standard in accordance with 40 CFR 403.15. (d) Local limits. The general manager is authorized to establish local limits pursuant to 40 CFR 403.5(c). The following limits are established to protect against pass-through and interference. No user shall discharge wastewater containing the following pollutants in excess of the following. These local limits apply at the point where the wastewater is discharged from the industrial user facility to the POTW collection system. (1) Limits for flow proportional sampling procedure and batch discharges or grab samples when necessary: mg/l liter Cadmium | 0.7 Chromium | 14.0 Copper | 3.61 Lead | 1.38 Mercury | 0.1 Nickel | 4.1 Zinc | 7.1 TTO 1 | 2.13 1 Aggregate concentration of any volatile compound, acid extractable compound, or base/neutral compound identified pursuant to Clean Water Act Section 307(a) or NR 215.03(1), (2), and (3). Pesticides, PCBs, dioxin, heavy metals, and other compounds in the identified list are excluded. Pesticides, PCBs, and dioxin discharges are not allowed. All concentrations for metallic substances are for "total" metal unless indicated otherwise. (2) Grab sample only: a. Any wastewater containing fats, wax, grease or oils whether emulsified or not, in excess of 200 mg/l as measured by an approved EPA method or containing substances which may solidify or become viscous at temperatures between 32 degrees Fahrenheit and 150 degrees Fahrenheit (0 degrees Celsius and 65.6 degrees Celsius).* b. 1.9 mg/l total cyanide. c. 5.17 mg/l BETX (aggregate of benzene, ethyl benzene, toluene, xylenes) gasoline derivatives. (3) Additional monitoring requirements: All dischargers may be required to monitor for the following pollutants: a. Arsenic, selenium, silver, molybdenum, chemical oxygen demand (COD), nitrogen, chloride, hexavalent-chromium, phenol, pesticides, dioxin, PCBs. b. The general manager may impose mass limits in addition to, or in place of, the concentration based limits above. Where a categorical pretreatment standard is expressed only in terms of either the mass or the concentration of a pollutant in the wastewater the general manager may impose equivalent concentration or mass limits. When the limits in a categorical pretreatment standard are expressed only in terms of mass of pollutant per unit of production, the general manager may convert the limits to equivalent limitations expressed either as mass of pollutant discharged per day or effluent concentration for purposes of calculating effluent limitations applicable to individual industrial users. To be eligible for equivalent mass limits, the industrial user must: 1. Employ, or demonstrate that it will employ, water conservation methods and technologies that substantially reduce water use during the term of its individual wastewater discharge permit; 2. Currently use control and treatment technologies adequate to achieve compliance with the applicable categorical pretreatment standard, and not have used dilution as a substitute for treatment; 3. Provide sufficient information to establish the facility's actual average daily flow rate for all wastestreams, based on data from a continuous effluent flow monitoring device, as well as the facility's long-term average production rate. Both the actual average daily flow rate and the long-term average production rate must be representative of current operating conditions; 4. Not have daily flow rates, production levels, or pollutant levels that vary so significantly that equivalent mass limits are not appropriate to control the discharge; and 5. Have consistently complied with all applicable categorical pretreatment standards during the period prior to the industrial user's request for equivalent mass limits. An industrial user subject to equivalent mass limits must: 1. Maintain and effectively operate control and treatment technologies adequate to achieve compliance with the equivalent mass limits; 2. Continue to record the facility's flow rates through the use of a continuous effluent flow monitoring device; 3. Continue to record the facility's production rates and notify the general manager whenever production rates are expected to vary by more than 20 percent from its baseline production rates. Upon notification of a revised production rate, the general manager will reassess the equivalent mass limit and revise the limit as necessary to reflect changed conditions at the facility; and 4. Continue to employ the same or comparable water conservation methods and technologies as those implemented pursuant to this section so long as it discharges under an equivalent mass limit. When developing equivalent mass limits, the general manager: 1. Will calculate the equivalent mass limit by multiplying the actual average daily flow rate of the regulated process(es) of the industrial user by the concentration-based daily maximum and monthly average standard for the applicable categorical pretreatment standard and the appropriate unit conversion factor; 2. Upon notification of a revised production rate, will reassess the equivalent mass limit and recalculate the limit as necessary to reflect changed conditions at the facility; and 3. May retain the same equivalent mass limit in subsequent individual wastewater discharge permit terms if the industrial user's actual average daily flow rate was reduced solely as a result of the implementation of water conservation methods and technologies, and the actual average daily flow rates used in the original calculation of the equivalent mass limit were not based on the use of dilution as a substitute for treatment pursuant to subsection 98-151(g). The industrial user must also be in compliance with subsection 98-151(j) regarding the prohibition of bypass.] 4. The general manager may convert the mass limits of the categorical pretreatment standards of 40 CFR Parts 414, 419, and 455 to concentration limits for purposes of calculating limitations applicable to individual industrial users. The conversion is at the discretion of the general manager. [Note: When converting such limits to concentration limits, the general manager will use the concentrations listed in the applicable subparts of 40 CFR Parts 414, 419, and 455 and document that dilution is not being substituted for treatment as prohibited by subsection 98-151(g) of this division (see 40 CFR 403.6(d)). In addition, the general manager will document how the equivalent limits were derived for any changes from concentration to mass limits, or vice versa, and make this information publicly available (see 40 CFR 403.6(c)(7)).] 5. Once included in its permit, the industrial user must comply with the equivalent limitations developed in this section in lieu of the promulgated categorical standards from which the equivalent limitations were derived. [Note: See 40 CFR 403.6(c)(7)] Many categorical pretreatment standards specify one limit for calculating maximum daily discharge limitations and a second limit for calculating maximum monthly average, or four-day average, limitations. Where such standards are being applied, the same production or flow figure shall be used in calculating both the average and the maximum equivalent limitation. [Note: See 40 CFR 403.6(c)(8)] 6. Any industrial user operating under a permit incorporating equivalent mass or concentration limits calculated from a production-based standard shall notify the general manager within two business days after the user has a reasonable basis to know that the production level will significantly change within the next calendar month. Any user not notifying the general manager of such anticipated change will be required to meet the mass or concentration limits in its permit that were based on the original estimate of the long term average production rate. [Note: See 40 CFR 403.6(c)(9)] c. The general manager may impose additional limits and/or monitoring requirements on pollutants of concern. d. The general manager may develop best management practices (BMPs), by ordinance or in individual wastewater discharge permits, to implement local limits and general discharge prohibitions. Control mechanisms (permits) shall contain effluent limits, including best management practices, based on prohibited discharge standards, categorical pretreatment standards, local limits and state and local law. The general manager shall be able to modify these limitations as long as they do not violate state or federal laws. *Any variance requests for fats, wax, grease or oils limitations as set forth in subsection 98-151(d)(2) shall be submitted to the general manager. The variance request shall be based upon the criteria enumerated in 40 CFR, part II, sec. 403.13. If a variance is granted, the general manager will have sole discretion on whether to accept alternative testing procedures for the variance. (e) State requirements. State requirements and limitations on discharges shall apply in any case where they are more stringent than federal requirements and limitations or those in this division. (f) Utility's right of revision. The utility reserves the right to establish by ordinance more stringent limitations of requirements on discharges to the POTW if deemed necessary to comply with the objectives presented in subsection 98-150(a) of this division. (g) Excessive discharge (dilution). No user shall ever increase the use of process water or attempt to dilute a discharge as a partial or complete substitute for adequate treatment to achieve compliance with the limitations contained in the categorical pretreatment standards or this division. The general manager may impose mass limitations on users that are using dilution to meet applicable pretreatment standards or requirements, or in other cases when the imposition of mass limitations is appropriate. (h) Accidental discharges. Each industrial user shall provide protection from accidental discharge of prohibited materials or other substances regulated by this division. Facilities to prevent accidental discharge of prohibited materials shall be provided and maintained at the user's own expense. (i) Sludges generated. Sludges, floatables, skimmings, etc., generated by an industrial or commercial pretreatment system shall not be placed into the Racine POTW. Such sludges shall be contained, transported, and disposed of by haulers in accordance with all federal, state and local regulations. (j) Bypass of treatment facilities. Bypass means the intentional diversion of wastestreams from any portion of the user's treatment facility. (1) Bypass is prohibited unless it is unavoidable to prevent loss of life, personal injury, or severe property damage or there are no feasible alternatives; and (2) The permittee may allow bypass to occur which does not cause effluent limitations to be exceeded, but only if it is also for essential maintenance to assure efficient operation; (3) Notification of bypass: a. Anticipated bypass. If the permittee knows in advance of the need for bypass, it shall submit prior written notice, at least ten days before the date of the bypass, to the wastewater utility. b. Unanticipated bypass. The permittee shall submit oral notice within 24 hours from the time the user becomes aware of the bypass to the wastewater utility and submit a written notice to the utility within five days. This report shall specify: 1. A description of the bypass and its cause, including its duration, including exact dates and times; 2. Whether the bypass has been corrected, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and 3. The steps being taken or to be taken to reduce, eliminate and prevent a reoccurrence of the bypass. 4. The general manager may waive the written report on a case-by-case basis if the oral report has been received within 24 hours. (k) Continuation of expired permits. An expired permit will continue to be effective and enforceable until the permit is reissued if: (1) The permittee has submitted a complete permit application at least 90 days prior to the expiration date of the user's existing permit; and (2) The failure to reissue the permit, prior to the expiration of the previous permit, is not due to any act or failure to act on the part of the permittee. (l) Records retention. An industrial user subject to this division shall retain and preserve for no less than three years, any records, books, documents, memoranda, reports, correspondence, and any and all summaries thereof, relating to monitoring, sampling, and chemical analyses made by or in behalf of an industrial user in connection with its discharge. All records which pertain to matters which are the subject of any enforcement or litigation activities brought by the city pursuant hereto shall be retained and preserved by the industrial user until all enforcement activities have concluded and all periods of limitation with respect to any and all appeals have expired. (m) Accidental discharge/slug (spill) control plans. The general manager shall evaluate whether each significant industrial user needs an accidental discharge/slug control plan or other action to control slug discharges. For industrial users identified as significant prior to March 3, 2014, this evaluation shall have been conducted by February 1, 2015. Additional significant industrial users shall be evaluated within one year of being designated as significant industrial users. The general manager may require any user to develop, submit for approval, and implement the slug discharge control plan approved by the city on (date). Alternatively, the general manager may develop such a plan for any user. An accidental discharge/slug control plan shall address, at a minimum, the following: (1) Description of discharge practices, including non-routine batch discharges; (2) Description of stored chemicals; (3) Procedures for immediately notifying the general manager of any accidental or slug discharge, as required by this division; and (4) Procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants, including solvents, and/or measures and equipment for emergency response. (5) The slug discharge control plan must use the following approved format: INDUSTRIAL USER (IU) SPILL/SLUG CONTROL PLAN • GENERAL INFORMATION: Name and Address, Contact Person, Discharge Practices, facility layout, Security Provisions and Employee Training (section 1) • MATERIAL INVENTORY: Types, volumes, containers, etc. (section 2) • SPILL/SLUG REPORTING: Description of procedures for notifying POTW (section 3) • SPILL AND LEAK PREVENTION: Procedures to prevent spills, maintain chemical storage, transfer materials, site run-off and training. (section 4) • EMERGENCY RESPONSE EQUIPMENT AND PROCEDURES: Inventory and location of equipment; and procedures (section 5) • DAMAGE CONTROL: Limiting damage to the environment and the wastewater treatment plant. (section 6) • TRAINING: Providing employee training. (section 7) • CERTIFICATION: A certification that the Plan is being implemented to prevent and control slugs and spills. (section 8) SECTION 1: GENERAL INFORMATION A. Slug/Spill Control Plans must include enough information to allow the Utility to: 1) categorize and restrict the industry's potential for a slug discharge; and 2) respond promptly and efficiently in an emergency. a) Name Address Industry description Contact person Location of Slug/spill plan b) Previous spills and actions taken c) General layout of the facility indicating location of chemicals, chemical storage, drains, loading and unloading areas, and pretreatment facilities. d) Discharge practices, continuous, occasional, no-discharge, drains with plugs SECTION 2: MATERIALS INVENTORY A. The facility should provide data on all materials of concern used and stored on site. This may include those materials for which the Utility has established local limits. This information is useful in determining the origin of a slug or spill, potential hazards and appropriate response procedures. A chart format works well: Chemical | Location | Volume present in facility | Type of container | Transfer areas and practices | Remarks 1) Materials - Both chemical and trade names should be listed (OSHA SDSs may be used). 2) Location - This will assist personnel in locating areas affected by a spill. 3) Container Volume - Useful in determining the potential impact of a slug/spill. 4) Container Description - The type of container (e.g. steel drum, fiberglass tank, etc.) and the presence of any valves, pumps, transfer pipes, etc. 5) Transfer/Transport Areas - To assess spill potential, possible effects on the treatment plant. 6) Additional Remarks - Information on the physical, chemical, and toxicological effects of each material, and special precautions to prevent contact between incompatible materials. B. Each facility must demonstrate that the following aspects have been considered: 1) construction of the container; 2) other materials in the immediate vicinity; and 3) surrounding environment SECTION 3: SPILL REPORTING A. Reporting and documenting spills and slug discharges should be described. 1) Time, date, and cause of the incident; 2) Impact of the spill on the treatment plant and the environment; 3) Extent of injury and/or damage; and 4) How future incidents can be avoided. 5) A description of clean-up and disposal procedures must be included where applicable. Reports should address the following questions regarding plan adequacy: a) Was the safety of personnel and the surrounding community ensured throughout the incident? b) Were personnel working near the spill provided with access to protective equipment? c) Was the spill confined quickly? d) Was fire extinguishing equipment adequate and readily available? e) Did secondary containment structures remain intact? Were they properly sized? f) Were appropriate authorities immediately notified of the incident? B. Recommendations for improvement in spill response should be included. The investigation report should be available to the Utility, fire, and insurance firms (if applicable) to assist these agencies in their investigations. Copies of forms used for reporting and a list of appropriate response agencies and phone numbers should be included in the Plan. SECTION 4: SPILL AND LEAK PREVENTION This subsection is divided into a discussion of equipment and procedures. Information that a Slug Control Plan could contain are listed here. A. Existing and Proposed Spill Prevention and Containment Equipment 1) This section should identify all existing equipment and systems that are in place. 2) If equipment needs to be purchased, the expected purchase dates should be provided. B. Equipment to Prevent or Detect Spills 1) Chemical storage, process tanks, holding tanks, use compatible materials in construction; underground seepage protection; cathodic protection; level sensing devices; overflow, temperature, pressure alarms; heating coils; collision protection; secondary containment; diversionary structures. 2) Drums: drum construction; storage areas; secondary containment; diversionary structures; collision protection; drum handling equipment; drip pans 3) Pipes, Valves, Fittings, Pumps, Electrical and Mechanical Equipment: seals; valve stem packing; gaskets; cathodic protection; vehicular traffic warning signs 4) Loading Stations: fill safeguards; curbs and drains; warning signs/improper disconnect protection; secondary containment 5) Alarm Systems: to detect unauthorized discharge flows, pH excursions, etc. C. Equipment to Contain Spills 1) Booms, barriers, sweeps, and fenders; surface collecting agents; absorbent materials; skimmers, oil/water separators; sumps; sewer plugs. 2) Address secondary containment system. A facility which has spill potential should provide secondary containment systems wherever possible. a) Diking is the most effective secondary containment for bulk chemical storage. Dikes can be constructed from concrete, cinder blocks, or earth. They should contain 110% of the largest tank capacity, or water from a maximum 24 hour/ten year rainfall event, whichever is greater. Design of the dike should include the containment of a spraying leak from the side of the tank or baffles could be installed on top of the dike to deflect spray and cause it to drop into the containment area. b) Diversion of flow of spilled material away from its naturally expected path can also be an effective means of secondary containment. Diversionary structures consist of curbs, sumps or gutters which divert spilled material to the collection tank. D. Procedures 1) Many operation and maintenance procedures are common-sense and should be included in the Plan. Good housekeeping includes chemical storage and prompt spill cleanup to prevent reaching the sewage system. Preventive maintenance includes periodic inspections and equipment testing, adjustment, repair, or parts replacement. A security system to prevent facility site entry would reduce the risk of illegal activities that could cause a slug or spill. 2) Examples of operating and maintenance procedures are listed below: a) Inspect chemical storage vessels, and process vessels and fittings (pumps, valves, piping): Appropriate materials of construction are to be used that are compatible with chemicals being processed. Inspections and monitoring frequencies should be listed. b) Inspect foundations and supports of large tanks, vessels, and piping: c) Above-ground vessels should be protected with truck guards. Underground vessels and pipes should be protected from physical and corrosion damage. d) Liquid level control devices placed on open tanks, use grounding apparatus (where necessary): Overflow, temperature and pressure alarms should be installed. e) Use proper drum handling equipment: No scooping drums with forks of a fork truck. Use pallets. Oil dispensing racks should be provided with drip pans. f) Secure loading/unloading pump station controls: Warning signs or crossing gates should be used to prevent trucks from driving away while the loading hose is connected. g) Eliminate all unnecessary cross connections: Unnecessary floor drains should be plugged, especially in high-risk areas. h) Utilize automatic storm water and/or sewer sampling systems to monitor for spills: Systems can have automatic shut-off devices to prohibit discharge. SECTION 5: EMERGENCY RESPONSE EQUIPMENT AND PROCEDURES Information in this section of the Plan includes an inventory of available emergency response equipment and a description of emergency response procedures. A. Equipment 1) Communication equipment and alarms: Phone, intercom, radio, alarm, etc. 2) Spill containment and control equipment and tools: Absorbent materials and dry chemicals. 3) Spilled material storage containers: Spills must be contained and removed as soon as possible to prevent spreading into other areas. 4) Protective clothing and respirators (if needed): - flameproof protective clothing - rubber gloves - apron - goggles/face mask - hard hat - self-contained breathing apparatus 5) First aid kits: Immediately available for use if necessary. State the location of first aid kits. 6) Ventilation equipment: Tests should be made for explosive atmosphere, toxic gases and oxygen deficiency. Ventilate area if needed. 7) Decontamination equipment: Appropriate protective clothing and monitoring equipment should be used for radioactive material. 8) Fire extinguishing systems: Locations should be posted throughout the plant. B. Procedures Spill plans should contain a spill response description. Procedures should minimize danger to human health and to assist in containment and cleanup of a spill. 1) Notification of proper facility personnel: The proper qualified person should respond to a spill. This person(s) should be familiar with the Plan and have the authority to initiate emergency response procedures. Signs indicating this contact and their phone number should be posted. 2) Evacuation procedures: An evacuation plan should be posted. The plan should contain: (1) a map of evacuation routes, (2) a map of alternative evacuation routes, and (3) a description of signals used to begin and conduct an evacuation. 3) Notification of response agencies and contractors: A list of spill response agencies and phone numbers should be posted. In the event of a spill, the appropriate response agency should be notified immediately. 4) Spill assessment and response procedures: Those designated to carry out spill response procedures should assess the spill. The origin of the spill and the impact should be assed. Spill response procedures that should be included in the plan: a) Notification of facility personnel by activating the communication and/or alarm system b) Begin evacuation procedures if necessary c) Notification of appropriate local, state, and federal agencies d) Stop the flow by shutting off pumps or closing valves e) Prevent contact between incompatible materials f) Commence clean-up activities g) Submit necessary reports 5) Procedures for clean-up, treatment, and/or disposal of spilled materials: Spilled material should be treated or disposed of to eliminate health and safety hazards. Information pertaining to treatment and disposal methods used by the facility should be included in the Plan. If outside contractors and/or consultants are utilized in clean-up, treatment, or disposal, the plan should include the company name, contact person and phone number. These procedures should be consistent with the ones established in the facility's OSHA Emergency Action Plan, as required by 29 CFR § 1910.38 SECTION 6: DAMAGE CONTROL Information in this section of the plan should describe how the facility plan will limit damage to the environment and the wastewater treatment plant. SECTION 7: TRAINING PROGRAM A. The Plan should contain an outline of the training program given to employees. Specialized training should also be provided to each employee or group of employees that handle potentially dangerous chemicals. B. Periodic training sessions should be conducted to assure understanding of the Plan. New employees should be trained immediately upon employment. 1) Employees should also be notified and retrained with any Plan changes. 2) Training records should be maintained and kept three years from the date the employee last worked at the facility. 3) Periodic drills should be set up. The purpose and frequency of drills should be indicated in the Plan. SECTION 8: CERTIFICATION Based on my inquiry of the person or persons directly responsible for managing compliance with the slug/spill control measures in the slug/spill plan, I certify that, to the best of my knowledge and belief, this facility is implementing the slug control plan submitted to the Racine Wastewater Utility. (n) Hauled wastewater. (1) Septic tank and holding tank waste may be introduced into the POTW only at locations designated by the general manager, and at such times as are established by the general manager. Such waste shall not violate categorical standards, or prohibitions, or local limits outlined in section 98-151 of this division or any other requirements established by the utility. The general manager may require waste haulers to obtain wastewater discharge permits; (2) The general manager shall require haulers of industrial waste to obtain wastewater discharge permits. The general manager may require generators of hauled industrial waste to obtain wastewater discharge permits. The general manager also may prohibit the disposal of hauled industrial waste. The discharge of hauled industrial waste is subject to all other requirements of this division; (3) Industrial waste haulers may discharge loads only at locations designated by the general manager. No load may be discharged without prior consent of the general manager. The general manager may collect samples of each hauled load to ensure compliance with applicable standards. The general manager may require the industrial waste hauler to provide waste analysis of any load prior to discharge; and (4) Industrial waste haulers must provide a waste-tracking form for every load. This form, as approved by the utility, shall include, at a minimum, the name and address of the industrial waste hauler, permit number, truck identification, names and addresses of sources of waste, and volume and characteristics of waste. The form shall identify the type of industry, known or suspected waste constituents, and whether any wastes are RCRA hazardous wastes. (o) Groundwater discharge. Discharge of polluted water to the sanitary sewer system from construction or remediation projects may require a groundwater discharge permit. (1) Contaminated groundwater may be introduced into the POTW only at locations designated by the general manager, and at such times as are established by the general manager. Such waste shall not violate section 98-151 of this division or any other requirements established by the utility. The utility may regulate the allowable rate of discharge, or order the discharge ceased, if deemed necessary. A flow meter will be installed to measure flow in accordance with subsection 98-149(b), with a sampling valve for obtaining samples for analysis; (2) If the general manager requires a discharger to obtain a groundwater discharge permit, the general manager shall require the generator or contractor in charge of the site to submit a groundwater discharge application; (3) The general manager shall require analysis of permitted groundwater discharge to ensure compliance with applicable standards in accordance with section 98-132 and subsection 98-149(a). The applicant shall provide the utility with any previous laboratory analysis. The general manager may require the generator to provide analysis of any load prior to commencement of discharge, or of any groundwater being discharged. Discharge shall be denied if the established limits will be exceeded; (4) Discharge will at all times be in compliance with the listed limits in section 98-151; (5) Generators must provide the required information requested on the groundwater discharge application form provided by the utility. This form shall include, at a minimum, a description of the discharge site, a site map, the name and address of the owner/tenant of the site, site history, cause for contamination, remediation plans (if necessary), treatment of the groundwater prior to discharge (if necessary), an estimation of the rate and duration of discharge. (6) The utility will inspect the site prior to discharge. (7) Permits cover a two-year period, and shall be charged the current permit fee. (8) Discharge will be billed at current class I user rates in accordance with subsection 98-149(c).
(Ord. No. 7-02, pt. 1, 4-15-02; Ord. No. 18-07, pt. 1, 10-2-07; Ord. No. 13-14, pts. 37—57, 1-20-15; Ord. No. 08-16, pts. 1, 2, 12-14-16)
Ask a question about Racine law
Corpus searches the Racine sections it holds and shows the ones that match, with their citations. Free, no sign-in.
