§ 98-153 — Administration
Municipal Code of the City of Racine, Wisconsin (Codified through Ordinance No. 0082-26, adopted March 3, 2026. (Supp. No. 108)) · Racine Municipal Code § 98-153
Corpus is an independent public-information project, not the official City of Racine website. Stable reference: corpuslaw.us/code/f8ba41fe-2fca-49fd-b15d-43fcd40ae182
Sec. 98-153. - Administration.
(a) Wastewater discharge permits. (1) Individual wastewater discharge permits. All significant users are required by this section to obtain a wastewater discharge permit. All new users proposing to connect to or to contribute to the POTW shall be surveyed to determine their need to obtain a wastewater discharge permit before connecting to or contributing to the POTW. All significant users that have facilities in more than one geographic location will be issued separate wastewater discharge permits for each facility. An individual wastewater discharge permit shall include such conditions as are deemed reasonably necessary by the general manager to prevent pass-through or interference, protect the quality of the receiving water, protect worker health and safety, facilitate sludge management and disposal, and protect against damage to the POTW. All permits must contain: a. A statement that indicates the wastewater discharge permit issuance date, expiration date and effective date; b. A statement that the wastewater discharge permit is issued to a specific industrial user for a specific operation. A wastewater discharge permit shall not be reassigned or transferred or sold to a new significant user. c. Effluent limits, including best management practices, based on applicable pretreatment standards and local limits; d. Self-monitoring, sampling, reporting, notification, and record-keeping requirements. These requirements shall include an identification of pollutants (or best management practice) to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law. e. A new wastewater discharge applicant or industry user applying for permit renewal shall sample for suspected TTO compounds. Any toxic organic compound found in the user's discharge at a concentration greater than 0.01 mg/l will be summed for a determination of compliance with the TTO limit specified in subsection 98-151(d). If an individual identified TTO is below 0.01 mg/l, no sampling for that TTO compound will be required for the duration of the permit, unless user discharge characteristics change. f. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law. g. Requirements to control slug discharge, if determined by the general manager to be necessary. (2) Other permits. The general manager may require other users to obtain wastewater discharge permits as necessary to carry out the purpose of this division. Industries that do not discharge process waste, or discharge minimal amounts of wastewater, but are still considered by the general manager to have the potential to impact the POTW, may be issued a minimal or no-discharge permit. This permit is approved only after the general manager has inspected the facility. A slug discharge plan must be on file with the utility. The facility will be inspected annually to confirm the no discharge status of the facility. Groundwater discharge permits may be required in accordance with subsection 98-151(o). a. Excepting that upon finding that a user meeting the criteria of a significant user has no reasonable potential for adversely affecting the POTW's operation or for violating any pretreatment standard or requirement, the general manager may at any time, on its own initiative or in response to a petition received from a user, and in accordance with procedures in 40 CFR 403.8(f)(6), determine that such user should not be considered a significant industrial user. Such user shall be classified as a non-significant industrial user. (3) Violations. Any violation of the terms and conditions of a wastewater discharge permit shall be deemed a violation of this division and subjects the wastewater discharge permittee to the sanctions set out in this division. Obtaining a wastewater discharge permit does not relieve a permittee of its obligation to comply with all federal and state pretreatment standards or requirements or with any other requirements of state, federal, and local law. (4) Application. Users required to obtain a wastewater discharge permit shall complete and file with the utility an application in the form prescribed by the utility, and accompanied by a permit fee as specified in section 98-154 of this division. Significant users shall submit a permit application for a wastewater discharge permit within 90 days after the effective date of this division, and proposed new significant users shall submit a permit application at least 90 days prior to connecting to or contributing to the POTW. Users which plan to become significant users by changing their wastewater volume and/or characteristics shall submit a permit application at least 90 days before the proposed process wastewater is discharged to the sewerage system. A 180-day baseline report may be substituted for the permit application. New users shall submit estimates for those required items where actual data is not yet available. The permit application shall be signed by an authorized representative of the industrial user, and certified by a qualified professional. In support of the application, the significant user shall submit, in units and terms appropriate for evaluation, the following information: a. Name, address and location for each facility (if different from the address), including the name of the operator and owner; b. Contact information, description of activities, facilities and plant production processes on the premises; c. Any environmental control permits held by or for the facility; d. SIC number according to the Standard Industrial Classification Manual, Bureau of the Budget, 1972, as amended; or NAICS code according to the North American Industrial Classification System (1997); e. Description of operations: 1. A brief description of the nature, activities, average rate of production (including each product produced by type, amount, processes, and rate of production). This description should include a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes. 2. Types of waste generated, and a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW; a spill plan may be required if deemed necessary for permit approval. The spill plan shall meet all requirements as found in subsection 98-151(m). 3. Number and type of employees, hours of operation, and proposed or actual hours of operation; 4. Type and amount of raw materials processed (average and maximum per day); 5. Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge, and all connections to the municipal sanitary sewer system by size and location; f. Wastewater constituents and characteristics for each facility, including, but not limited to, those standards mentioned in section 98-151 of this division as determined by a reliable analytical laboratory; sampling and analysis if required by categorical pretreatment standards shall be performed in accordance with procedures established by the EPA pursuant to Section 304(h) of the Act and contained in 40 CFR, part 136, as amended. In the case of new industrial users, item 3 shall mean projected wastes; g. Times and duration of wastewater contribution for each facility; h. The location for monitoring all wastes covered by the permit; i. Flow measurement. Information showing the measured average daily and maximum daily flow in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula (40 CFR 403.6(e)); j. Measurement of pollutants. 1. If any categorical pretreatment standard is applicable, each regulated process and any new categorically regulated processes for existing sources. 2. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by any city, state, or national categorical pretreatment standard or by the general manager, of regulated pollutants in the discharge from each regulated process. 3. Instantaneous, daily maximum and long-term average concentrations, or mass, where required, shall be reported. 4. Analysis of suspected TTO compounds shall be reported. If an identified TTO compound is below 0.01 mg/l, no sampling for that TTO compound will be required for the duration of the permit unless user discharge characteristics change. 5. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in subsection 98-153(b)(9) of the Code. Where any pretreatment standard requires compliance with a BMP or pollution prevention alternative, the industrial user shall submit documentation as required by the general manager or the applicable pretreatment standard to determine compliance with the standard. 6. Sampling must be performed in accordance with procedures set out in subsections 98-153(b), reporting requirements, and 98-153(b)(10), sample collection, of the Code. 7. The nature and concentration of any pollutants in the discharge which are limited by any city, state, or national categorical pretreatment standards, and a statement regarding whether or not the pretreatment standards are being met on a consistent basis and if not, whether additional operation and maintenance and/or additional pretreatment is required for the significant user to meet applicable categorical pretreatment standards at each facility; k. If additional pretreatment and/or operation and maintenance will be required to meet the categorical pretreatment standards, the significant user shall submit the shortest schedule by which the significant user will provide such additional treatment. The completion date in this schedule shall not be later than the compliance date established for the applicable categorical pretreatment standard. The following conditions shall apply to this schedule: 1. The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the significant user to meet the applicable categorical pretreatment standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.). No increment shall exceed nine months. 2. Not later than 14 days following each date in the schedule and the final date for compliance, the significant user shall submit a report to the general manager if the significant user has not complied with the increment of progress to be made on such date, the date on which the significant user expects to comply with this increment of progress, the reason for delay, and the steps being taken by the significant user to return the construction to the schedule established. l. The utility will evaluate the data furnished by the significant user and may require additional information. Incomplete or inaccurate applications will not be processed and will be returned to the industrial user for revision. After evaluation and acceptance of the data furnished, the utility may issue a wastewater discharge permit subject to terms and conditions provided herein. (5) Modifications. Any significant user with an existing wastewater discharge permit shall submit to the general manager within 180 days after the promulgation of an applicable national categorical pretreatment standard the information required by subsection 98-153(a)(4), application. Where a significant user, subject to national categorical pretreatment standards, has not previously submitted an application for a wastewater discharge permit, the significant user shall apply for a wastewater discharge permit within 180 days after the promulgation of the applicable national categorical pretreatment standards. The general manager may modify a wastewater discharge permit for good cause, including, but not limited to, the following reasons: a. To incorporate any new or revised federal, state, or local pretreatment standards or requirements; b. To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since the time of wastewater discharge permit issuance; c. A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge; d. Information indicating that the permitted discharge poses a threat to the utility's POTW, personnel, or the receiving waters, or the beneficial use of treatment plant sludge; e. Violation of any terms or conditions of the wastewater discharge permit; f. Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting; g. Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13; h. To correct typographical or other errors in the wastewater discharge permit; i. Upon request of the user, provided such request does not create a violation of any applicable requirements, standards, laws, or rules and regulations. (6) Conditions. Wastewater discharge permits shall be expressly subject to all provisions of this division and all other applicable regulations, user charges and fees established by the utility. Permits shall contain the following: a. Requirements for installation and maintenance of inspection and sampling facilities and equipment, including flow measurement devices; b. Requirements for installation and maintenance of pretreatment facilities or technology, pollution control, or construction of appropriate containment designed to reduce, eliminate or prevent the introduction of pollutants into the POTW; c. Requirements for notification to the utility of any new introduction of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being introduced into the wastewater treatment system; d. Requirements for maintaining and retaining plant records relating to wastewater discharge as specified by the utility, and affording utility access thereto; e. Requirements for the development and implementation of spill control plans or other special conditions, including management practices necessary to adequately prevent accidental, unanticipated, or non-routine discharges per subsection 98-151(m); and notification of slug discharges as per subsection 98-153(b)(6); f. A statement that indicates wastewater discharge permit duration, which in no instance shall exceed five years; g. Effluent limits based on applicable pretreatment standards; h. Self-monitoring, sampling, reporting, notification, and recordkeeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law; i. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law; and j. Other conditions as deemed appropriate by the utility to ensure compliance with this division. (7) Certification. All wastewater discharge permit applications, baseline monitoring reports, 90-day compliance reports, categorical industrial user periodic reports on continued compliance, and any other user reports containing analytical data, including reports from non-categorical permitted industrial users must be signed by an authorized representative of the user as specified, as follows, in subsection (7)a., b. or c., and contain the following certification: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Non-significant categorical certification. A facility determined to be a non-significant categorical industrial user by the general manager must annually submit a signed certification statement accompanied by an alternative report that shall be provided by the general manager. The non-significant categorical user certification statement shall consist of the following language, and must be signed by an authorized representative of the user subsection (7)a., b. or c.: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the categorical pretreatment standards under 40 CFR Part X (user should insert applicable categorical code Part number), I certify that, to the best of my knowledge and belief that during the period from M/D/YY to M/D/YY: 1. The facility described as (facility name) met the definition of a non-significant categorical industrial user as defined in subsection 98-150(b); 2. The facility complied with all applicable pretreatment standards and requirements during this reporting period; and the facility never discharged more than 100 gallons of total categorical wastewater on any given day during this reporting period. 3. This compliance certification is based on the following information: (user should insert reasoning). a. If the industrial user is a corporation, the certification shall be signed by: 1. A president, secretary, treasurer, vice-president in charge of a principal business function or any other person who performs similar policy or decision making functions for the corporation; 2. The manager of one or more manufacturing facilities provided the manager is authorized to make decisions which govern the operation of the facility, make major capital investment recommendations, initiate and direct comprehensive measures to assure long-term compliance with environmental laws, can ensure the necessary systems are established to gather complete and accurate information for the report and where authority to sign documents has been delegated to the manager according to the corporation's procedures; or 3. A representative of a person described in subsection 1. or 2. above if the representative has been authorized according to subsection d. below. b. If the industrial user is a partnership, the certification statement shall be signed by either a general partner or a representative authorized according to subsection d. below. c. If the industrial user is a sole proprietorship, the certification statement shall be signed by either the proprietor or a representative authorized according to subsection d. below. d. Authority to sign the certification statement may be delegated if: 1. The person to whom authority is delegated is an individual or occupies a position with responsibility for: i. The overall operation of the facility from which the discharge occurs, such as a plant manager; or ii. The overall environmental matters for the company, such as a corporate environmental officer; and 2. A written authorization is submitted to the control authority. If circumstances change so that an authorization is no longer accurate, the industrial user shall submit a new authorization before or along with the submission of any report signed by a new representative. (8) Duration. Permits shall be issued for a four-year period. A significant user shall apply for permit reissuance a minimum of 90 days prior to the expiration of the user's existing permit. The terms and conditions of the permit may be subject to modifications by the utility during the term of the permit as limitations or requirements identified in section 98-151 are modified or as other just causes exist. A significant user shall be informed of any proposed changes in its permit at least 30 days prior to the effective date of change. Any changes or new conditions in the permit shall include a reasonable time schedule for compliance. All wastewater discharge permits issued to a particular user are void upon the issuance of a new wastewater discharge permit to that user. Expired discharge permits remain in effect until the new permit is issued by the utility. (9) Reissuance. Permitted industrial users with an expiring permit shall apply for a wastewater discharge permit reissuance by submitting a complete permit application a minimum of 90 days prior to the expiration of the existing discharge permit. (10) Transfer. Wastewater discharge permits are issued to a specific significant user for a specific operation. A wastewater discharge permit shall not be reassigned or transferred or sold to a new significant user. (11) Appeals procedure. A user desiring to appeal regarding the wastewater discharge permit denial or conditions shall, not more than 20 days after the user receives notice of denial or receives the wastewater discharge permit with conditions, file a petition for appeal with the wastewater commission for referral to the board of standards. If the user does not file a petition for appeal within said time, the action on the wastewater discharge permit is final. In its petition, the appealing party shall indicate the wastewater discharge permit action or provisions objected to, the reasons for the objection, and the alternative conditions, if any, it seeks to place in the wastewater discharge permit. The effectiveness of the wastewater discharge permit shall not be stayed pending the appeal. (12) Wastewater discharge permit decision. Within 30 days of receipt of a complete wastewater discharge permit application, the general manager will determine whether or not to issue a wastewater discharge permit. The general manager will evaluate the data furnished by the user and may require additional information. The general manager may deny any application for a wastewater discharge permit. (13) Regulation of waste from other jurisdictions. This division provides for the regulation of direct and indirect contributors to the wastewater works through the issuance of permits to certain non-domestic users and through enforcement of general requirements for the other users, authorizes monitoring and enforcement activities, requires user reporting, assumes that existing customer's capacity will not be preempted, and provides for the setting of fees for the equitable distribution of costs resulting from the program established herein. This division shall apply to all SSR parties who are, by authority of the sewer agreement, users of the city POTW. Except as otherwise provided herein, the general manager of the Racine POTW shall administer, implement, and enforce the provisions of this division. (b) Reporting requirements. (1) Baseline monitoring reports. a. Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing categorical users currently discharging to or scheduled to discharge to the POTW shall submit to the general manager a report which contains the information listed in paragraph b., below. At least 90 days prior to commencement of their discharge, new sources, and sources that become categorical user subsequent to the promulgation of an applicable categorical standard, shall submit to the general manager a report which contains the information listed in paragraph b., below. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged. b. Users described above shall submit the information set forth below: 1. Identifying information. The name and address of the facility, including the name of the operator and owner. 2. Environmental permits. A list of any environmental control permits held by or for the facility. 3. Description of operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such user. This description should include a schematic process diagram that indicates points of discharge to the POTW from the regulated processes. 4. Flow measurement. Information showing the measured average daily and maximum flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in 40 CFR 403.6(e). 5. Measurement of pollutants. i. The categorical pretreatment standards applicable to each regulated process. ii. The results of sampling analysis identifying the nature and concentration, and/or mass, where required by the standard or by the general manager, or regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and long term average concentrations, or mass, where required, shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in subsection 98-153(b)(9) of this division. iii. Sampling must be performed in accordance with procedures set out in subsection 98-153(b)(10) of this division. 6. Certification. A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O & M) and/or additional pretreatment is required to meet the pretreatment standards and requirements. 7. Compliance schedule. If additional pretreatment and/or O & M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O & M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in subsection 98-153(b)(2). 8. Signature and certification. All baseline monitoring reports must be signed and certified in accordance with subsection 98-153(a)(7) of this division. (2) Compliance schedule progress reports. The following conditions shall apply to the compliance schedule required by subsection 98-153(b)(1)b.7. of this division: a. The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation); b. No increment referred to above shall exceed nine months; the general manager may reduce any increment referred to above pending the severity of the noncompliance and compliance history of the user; c. The user shall submit a progress report to the general manager no later than 14 days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the user to return to the established schedule; and d. In no event shall more than nine months elapse between such progress reports to the general manager. (3) Reports on compliance with categorical pretreatment standard deadline. Within 90 days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the POTW, any user subject to such pretreatment standards and requirements shall submit to the general manager a report containing the information described in subsection 98-153(b)(1)b. of this division. For users subject to equivalent mass or concentration limits established in accordance with the procedures in 40 CFR 403.6(c), this report shall contain a reasonable measure of the user's long term production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with subsection 98-153(a)(7). (4) Periodic compliance reports (self-monitoring reports). a. All significant industrial users shall, at a frequency determined by the general manager but in no case less than twice per year (in June and December), submit a report indicating the nature and concentration of pollutants in the discharge which are limited by pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. In cases where the pretreatment standard requires compliance with a best management practice (BMP) or pollution prevention alternative, the user must submit documentation required by the general manager or the pretreatment standard necessary to determine the compliance status of the user. All periodic compliance reports must be signed and certified in accordance with subsection 98-153(a)(7) of this division. b. A facility determined to be a non-significant categorical industrial user by the general manager must annually submit a certification statement signed in accordance with the non-significant categorical industrial user signatory requirements in subsection 98-153(a)(7). The certification statement must accompany an alternative report required by the general manager. c. All wastewater samples must be representative of the user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge. d. If an industrial user subject to the reporting requirement in this section monitors any pollutant more frequently than required by the general manager, using the procedures prescribed in subsections 98-153(b)(9) and (10) of this division, the results of this monitoring shall be included in the report. Both categorical and non-categorical industrial users shall report all monitoring results. e. All users subject to categorical pretreatment standards that have waste shipped off-site for disposal shall submit a report semi-annually (in June and December) listing the category, manufacturing process, volume and destination of such wastes. (5) Reports of changed conditions. Each user must notify the general manager of any planned significant changes to the user's operations or system which might alter the nature, quality, or volume of its wastewater at least 20 days before the change. a. The general manager may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application. b. The general manager may issue a wastewater discharge permit or modify an existing wastewater discharge permit in response to changed conditions or anticipated changed conditions. c. For purposes of this requirement, significant changes include, but are not limited to, flow increases of 20 percent or greater, and the discharge of any previously unreported pollutants. (6) Reports of potential problems. In the case of any discharge, including, but not limited to, accidental discharges, discharges of non-routine, episodic nature, a non-customary batch discharge, or a slug load, that may cause potential problems for the POTW, such as any slug loading in violation of NR 211.10(2) and subsection 98-151(a) or (b) of this Code, or of any changes at the industrial users' facility affecting the potential for a slug discharge and the need for a slug control plan as required by NR 211.235(4)(a) and subsection 98-151(m) of this Code, the user shall immediately telephone and notify the general manager of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user. A notice shall be permanently posted on the user's bulletin board or other prominent location advising employees whom to call in the event of a discharge described above. Employers shall ensure that all employees, who may cause such a discharge to occur, are advised of the emergency notifications procedure. a. Slug or accidental discharges. Industrial users shall notify the utility immediately upon having a slug or accidental discharge of substances or wastewater in violation of this division in order to enable countermeasures to be taken by the utility to minimize damage to the POTW and the receiving waters. The notification shall include damage to the POTW and the receiving waters, location of discharge, type of waste, concentration and volume, and corrective actions. The utility may choose to immediately take action pursuant to section 98-155, enforcement. Within five days following an accidental discharge, the industrial user shall submit to the general manager a detailed written report describing the cause of the discharge and the measures to be taken by the industrial user to prevent similar future occurrences. Such notification shall not relieve the industrial user of any expense, loss, damage, or other liability that may be incurred as a result of damage to the POTW, fish kills, or any other damage to person or property; nor shall such notification relieve the industrial user of any fines, civil penalties, or other liability that may be imposed by this division or other applicable law. After receipt and review of the written report, the utility may choose to take no further action or to take action in accordance with section 98-155. b. Operating upsets report. For the purposes of this section, upset means an exceptional incident in which there is unintentional and temporary noncompliance with categorical pretreatment standards because of factors beyond the reasonable control of the user. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. Any categorical industrial user which experiences a temporary state of noncompliance with this section or a wastewater discharge permit issued pursuant hereto shall inform the utility thereof within 24 hours of first awareness of the commencement of the upset. The utility may choose to immediately take action pursuant to section 98-155. Where such information is given orally, the user shall file a written follow-up report with the utility within five days. The report shall specify: 1. Description of the upset, the cause thereof, and the upset's impact on a user's compliance status. 2. Duration of noncompliance, including exact dates and times of noncompliance and if the noncompliance continues, the time by which compliance is reasonably expected to occur. 3. All steps taken or to be taken to reduce, eliminate, and prevent recurrence of such an upset or other conditions of noncompliance. A documented and verified bona fide operating upset shall be an affirmative defense to any enforcement action brought by the utility against a user for any noncompliance with the section or any wastewater discharge permit issued pursuant hereto, which arises out of violations alleged to have occurred during the period of the upset. Such notification shall not relieve the user of any expense, loss, damage, or other liability that may be incurred as result of damage to the POTW, fish kills, or any other damage to person or property; nor shall such notification relieve the user of any fines, civil penalties, or other liability that may be imposed by this division or other applicable law. After receipt and review of the written report, the utility may choose to take no further action or to take action in accordance with section 98-155. (7) Reports from unpermitted users. All users not required to obtain a wastewater discharge permit shall provide appropriate reports to the general manager as the general manager may require. (8) Notice of violation/repeat sampling and reporting. If sampling performed by an industrial user indicates a violation, the user must notify the general manager within 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the general manager within 30 days after becoming aware of the violation. The user is not required to resample if the POTW monitors at the user's facility at least once a month, or if the POTW samples between the user's initial sampling and when the user receives the results of this sampling, or if the POTW has performed the sampling and analysis in lieu of the industrial user. (9) Analytical requirements. All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR, Part 136 and amendments thereto, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR, Part 136 does not contain sampling or analytical techniques for the pollutant in question, sampling and analyses shall be performed in accordance with procedures approved by EPA. Where an industrial user requires compliance with a best management practice or pollution prevention alternative, the user shall submit documentation as required by the POTW or the applicable standard to determine compliance. (10) Sample collection. Sampling and analysis shall be performed by all significant industrial users (categorical and non-categorical) to identify the concentration or mass of regulated pollutants in the discharge from each regulated process, according to the requirements of the applicable categorical pretreatment standard and the utility. Both daily maximum and average values shall be reported. Except as indicated, the user shall collect wastewater samples using 24-hour flow proportional composite collection techniques. In the event flow proportional sampling is not feasible, the general manager may authorize the use of time proportional sampling or grab samples where the user demonstrates that this will provide a representative sample of the effluent being discharged. Sampling requirements are documented in each individual industrial discharge permit. In addition, grab samples may be required to show compliance with instantaneous discharge limits. Samples for oil and grease, temperature, pH, cyanide, phenols, sulfides, and volatile organic compounds shall be obtained using grab collection techniques. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grabs samples collected during a 24-hour period may be composited prior to the analysis as follows: for cyanide, total phenols, and sulfides the samples may be composited in the laboratory or the field. Composite samples for other parameters unaffected by the compositing procedures documented in approved EPA methodologies may be authorized by the utility, as appropriate. For sampling required in support of baseline monitoring and 90-day compliance reports [40 CFR 403.12(b) and (d)], a minimum of four (4) grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which historical sampling data do not exist. For facilities for which historical sampling data are available, the general manager may authorize a lower minimum of one grab sample of each parameter where grab samples are required. For the periodic reports required by the industrial user discharge permit, the industrial user is required to collect the number of grab samples necessary (as indicated by discharge permit) to assess and assure compliance by with applicable pretreatment standards and requirements. (11) Timing. Written reports will be deemed to have been submitted on the date postmarked. For reports that are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the date of receipt of the report shall govern. (12) Recordkeeping. Users subject to the reporting requirements of this division shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this division and any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements, and documentation associated with best management practices established under subsection 98-151(d)(3). Records shall include the date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used, and the results of such analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the user or general manager, or where the user has been specifically notified of a longer retention period by the general manager. (13) Limitations imposed on significant users. The general manager may impose mass limitations on significant users which are using dilution to meet applicable categorical pretreatment standards or pretreatment requirements, or in other cases where the imposition of mass limitations are appropriate. In such cases, the report required shall indicate the mass of pollutants regulated by categorical pretreatment standards in the effluent of the significant user. These reports shall contain the results of sampling and concentration, or production and mass, where requested by the general manager, of pollutants contained therein which are limited by the applicable categorical pretreatment standards. The frequency of monitoring shall be prescribed in the applicable pretreatment standards. All analyses shall be performed in accordance with procedures established in the latest approved version of Standard Methods for the Examination of Water and Wastewater, and as amended, and/or established by the administrator pursuant to Section 304(h) of the Act and contained in 40 CFR, part 136 and amendments thereto or with any other test procedures approved by the administrator. Sampling shall be performed in accordance with the techniques approved by the administrator. (Comment: Where 40 CFR, part 136 does not include a sampling or analytical technique for the pollutant in question, sampling and analysis shall be performed in accordance with the procedures set forth in the EPA publication "Sampling and Analysis Procedure for Screening of Industrial Effluents for Priority Pollutants, April 1977," and amendments thereto, or with any other sampling and analytical procedures approved by the administrator). (14) Batch discharge report. The user shall notify the utility five days prior to discharging the contents of any tank of batch discharge. Included in this report shall be the volume of all batch discharges recorded for each discharge event and batch tank volumes. The general manager may require that batch discharges or tank contents to be discharged must be analyzed by procedures outlined under the self-monitoring reports subsection 98-153(b)(10), and must be found to be in compliance with all discharge limits that are in effect before discharge may occur. Grab samples must be taken for batch discharges. The grab samples must be representative of the monitored discharge or total tank contents and shall be taken prior to batch discharging. The contents of the tank are to be mixed uniformly or subsamples of the top, middle and bottom of the tank shall be taken and composited. (15) Notification of hazardous wastes in discharge. An industry which discharges any amount of acute hazardous waste according to § NR 661.30 (4) or 661.33 (5); or more than 15 kilograms per calendar month of any substance that would be hazardous waste according to ch. NR 661 if otherwise disposed, to the sanitary sewer shall notify the POTW, the WDNR's Bureau of Solid Waste and the EPA Region V Waste Management Division Director in writing, of any discharge into the POTW of a substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR Part 261. Such notification must include the name of the hazardous waste, the EPA hazardous waste number and the type of discharge (batch, continuous or other); and submit a certification that the industrial user has a program in place to reduce to the extent economically practicable the volume and toxicity of the generated hazardous wastes. If the user discharges more than 100 kilograms of such waste per calendar month to the POTW, the notification also shall contain the following information to the extent such information is known and readily available to the user: an identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the wastestream discharged during that calendar month, and an estimation of the mass of constituents in the wastestream expected to be discharged during the following 12 months. All notifications must take place no later than 180 days after the discharge commences. Any notification under this section needs to be submitted only once except for notification of changed discharge in subsection 98-153(b)(5). The notification requirement in this section does not apply to pollutants already reported by users subject to categorical pretreatment standards under self-monitoring requirements. In the case of any new regulations under section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the user must notify the general manager, the EPA Regional Waste Management Waste Division Director, and state hazardous waste authorities of the discharge of such substance within 90 days of the effective date of such regulations. (c) Monitoring facilities and compliance monitoring. (1) Pretreatment. Industrial users shall provide necessary wastewater treatment as required to comply with this division and shall achieve compliance with all national categorical pretreatment standards within the time limitations as specified by the federal pretreatment regulations. Any facilities required to pretreat wastewater to a level approved by the utility shall be provided, operated, and maintained at the industrial user's expense. Detailed plans showing the pretreatment facilities and operating procedures shall be submitted to the utility and WDNR for review, and shall be approved by the utility and WDNR before construction of the facility. The review of such plans and operating procedures will in no way relieve the industrial user from the responsibility of modifying the facility as necessary to produce an effluent approved by the utility under the provisions of this division. Any subsequent changes in the pretreatment facilities or method of operation shall be submitted to and be approved by the utility and WDNR prior to the industrial user's initiation of the changes. (2) Monitoring facilities. The industrial user is required to provide and operate at its own expense, monitoring facilities to allow inspection, sampling, and flow measurement of the building sewer and/or internal drainage systems. The monitoring facility should be situated on the industrial user's premises, but, when such a location would be impractical or cause undue hardship on the industrial user, the facility may be constructed in the public street or sidewalk area and located so that it will not be obstructed by landscaping or parked vehicles and comply with Wis. Stats. § 66.0425. There shall be ample room in or near such sampling manhole or facility to allow accurate sampling and preparation of samples for analysis. The facility shall be maintained at all times in a safe and proper operating condition at the expense of the industrial user. Whether conducted on public or private property, the sampling and monitoring facilities shall be provided in accordance with the utility's requirements and all applicable local construction standards and specifications. Construction shall be completed within 90 days following written notification by the utility, unless a time extension is otherwise granted by the utility. (3) Inspection and sampling. The utility shall inspect the facilities of any industrial user to ascertain whether the purpose of this division is being met and all requirements are being complied with. Persons or occupants or premises where wastewater is created or discharged shall allow the utility or their representative ready access at all reasonable times to all parts of the premises for the purposes of inspection, sampling, records examination, or in the performance of any of their duties. The utility, DNR, and EPA shall have the right to set up on the industrial user's property such devices as are necessary to conduct sampling inspection, compliance monitoring, and/or metering operations; as well as facility and documentation inspection to assess compliance with best management practices, including, but not limited to, mercury reduction, kitchen FOG management, and vehicle service fluid and vehicle wash management. Where an industrial or commercial user has security measures in force which would require proper identification and clearance before entry into their premises, the industrial or commercial user shall make necessary arrangements with its security guards so that upon presentation of suitable identification, personnel from the utility, DNR, and EPA will be permitted to enter, without delay, for the purposes of performing their specific responsibilities. a. The general manager shall have the right to set up on the user's property, or require installation of, such devices as are necessary to conduct sampling and/or metering of the user's operations. b. The general manager may require the user to install monitoring equipment as necessary. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the user at its own expense. All devices used to measure wastewater flow and quality shall be calibrated to ensure their accuracy. c. Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall promptly be removed by the user at the written or verbal request of the general manager and shall not be replaced. The costs of clearing such access shall be born[e] by the user. d. Unreasonable delays in allowing the general manager access to the user's premises shall be a violation of this division. e. Monitoring points may change only after receiving written approval from the general manager. (4) Special inspection warrants. If the general manager has been refused access to a building, structure, or property, or any part thereof, and is able to demonstrate probable cause to believe that there may be a violation of this division, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program designed to verify compliance with this division or any permit or order issued hereunder, or to protect the overall public health, safety and welfare of the community, then the general manager may seek issuance of a special inspection warrant from an appropriate court. (d) Confidential information. Information and data concerning a user which may be obtained from reports, surveys, wastewater discharge permit applications, wastewater discharge permits, and monitoring programs, and from the general manager's inspection and sampling activities, shall be available to the public without restriction, unless the user specifically requests, and is able to demonstrate to the satisfaction of the general manager, that the release of such information would divulge information, processes, or methods of production entitled to protection as trade secrets under applicable state law. Any such request must be asserted at the time of submission of the information or data. When requested and demonstrated by the user that such information should be held confidential, the portions of a report which might disclose trade secrets or secret processes shall not be made available for inspection by the public, but shall be made available immediately upon request to governmental agencies for uses related to the WPDES program or pretreatment program, and in enforcement proceedings involving the person furnishing the report. Wastewater constituents and characteristics and other "effluent data" as defined by 40 CFR 2.302 will not be recognized as confidential information and will be available to the public without restriction.
(Ord. No. 7-02, pt. 1, 4-15-02; Ord. No. 13-14, pts. 60—96, 1-20-15)
Ask a question about Racine law
Corpus searches the Racine sections it holds and shows the ones that match, with their citations. Free, no sign-in.
